" Systems As The Way We Work – Innovation in QMS Implementation " R Vasu (Vice President & Corp. MR) K N Sudharsan (Manager) Brakes India Private Limited Chennai , India Contents Company Profile Challenges in QMS and Need for Innovation Innovative Ideas in Audit Planning, Execution & Continual Improvement Integration of Six Sigma with QMS 2 Executive summary QMS internal audits in large diversified organization becomes a challenge. To meet the challenge, innovation is the key for efficient and effective QMS implementation. The following five (5) innovative approaches have been adopted using Dr. Deming’s PDCA approach and will be discussed. 1. Innovation in system audit plan – Planetary System 2. Innovation in audit scoring – Color Coding Rating System 3. Innovation in New Products audit – APQP Stages 4. Innovations in PFMEA - GYR Coding 5. Innovative approach in integrating – Six Sigma Deployment with other Management systems 3 Brakes India Private Limited 51% Our Joint Venture Established Net Sales (31/03/15) 49% 1962, Joint Venture with Lucas PLC UK Rs 3296 Crores (526 Million U.S $) Employees 7646 Products Braking Systems, Castings, Machine Building, Polymer Compounding Engineering Capability Design, Develop, Test and Validate Average Line PPM 11 (Brake Division) R&D Spend 2.15% of Sales (Brake Division ) Certifications TS16949, ISO 14001, TPM, Ford Q1, Deming (Foundry), OHSAS 18001, EnMS 50001 Segments Manufacturing Sites Global Infrastructure 4 Light Vehicle, Commercial, Off Highway, Specialty Brake Division – 15 Office in US Foundry - 1 Manufacturing Locations Total Productivity Management Gurgaon (2) Sittarganj Reduction of Losses Elimination of Waste Jhagadia Total Employee Involvement Sanand Jamshedpur Customer Centricity Proximity to Customers Waki (Pune) Chennai (Padi,Avadi & SEZ) Nanjangud Sholinghur (3) Flexible Delivery Flexible Packing Sholinghur(foundry) Quick Response Mother Plant 5 Support Plant Satellite Plant Polambakkam Light Vehicle Product Portfolio Clutch Hydraulics Plastic Master Cylinder 3 million p.a. Hose Assemblies 12 million p.a. Master Cylinder Booster . Drum Brakes 2.63 million Master Cyl 1.40 million Boosters 4.80 million p.a. + 0.6 million p.a. (DIH) Slip Control Valves Lining Calipers 0.05 million p.a. Pads 1.7 million p.a. 4.5 million p.a. 15.84 million p.a. 6.9 million p.a. * Also leading Manufacturer of Brake Systems for Commercial, Tractor & Off Highway Vehicles 6 Our TPM Journey TPM Advance Special Award TPM Milestones TPM Special Award TPM Excellence in Consistent Award Goal : 2007 TPM Excellence Award 2005 2003 TPM Awards by JIPm, Japan. 7 Our Vision From ‘Systems for Certification To Systems as the Way We Work’ (The Way We Do Business) 8 Need for Innovation in QMS 9 Why Innovation ? • Multi Sites , Languages , Location • Multi Process • Multi Product group • Increasing Internal & External Customer Requirements 10 What are the Innovative approaches ? Innovations in 4) PFMEA GYR coding 5) Integration of Six Sigma with other Management Systems Act • How to improve next time ? Check • Did things happen according to plan? 3) Innovation in New Products audit - APQP stages 11 Plan 1) Innovation in System Audit plan - Planetary system What to do? How to do it ? Do • Do what was planned ? 2) Innovation in Audit Scoring - Color Coding System 1. Innovative Approach in QMS Audit plan Act • How to improve What to do? next time ? How to do it ? Check • Did things happen according to plan? 12 Plan Do • Do what was planned ? 1) Innovation in System Audit plan - Planetary system What is the Innovation in QMS Audit plan ? Earlier Methodology Stand alone system Assembly Plants Dedicated Satellite Plants Corporate Depts • • • 13 QMS audit carried out independently Not considering the interdependency Unable to capture Internal Customer voice Warehouse Sub Assy Plants Mother plants Innovation in QMS Audit plan is ….. Planetary system Assembly plants closer to OEM Sub assy plants Warehouse Dedicated Satellite plants Mother c plants 14 Better QMS coordination between plants Internal Customer voice captured Corp Departments Benefits Effectively Captures all the Internal & External customer voices Internal Customer voices are effectively Reviewed by Senior Management Team Interdependent processes are reviewed for Continual improvement Lead time for CA initiation has reduced Better QMS coordination between the plants 15 2. Innovative approach in QMS audit scoring Act • How to improve next time ? Check • Did things happen according to plan? Plan What to do? How to do it ? Do • Do what was planned ? 2. QMS Audit scoring - Color coded Dashboards 16 What is the Innovation in Audit scoring ? QMS Audit - Objective Score card system 17 What is the Innovation in Audit scoring ? ISO / TS 16949 ISO / TS 16949 Standard VDA6.3 Standard Scoring Brakes India QMS Procedure Self Audit Check List VDA6.3 BI QMS Procedure • Integration of TS , VDA & BI QMS Audit requirements • From Subjective report to Objective score card • Visual Dashboard for quick look 18 Domain Function Wise checklist Various Customer/ ZF TRW Audit Forms QMSA Score GYR Status How ? Evaluation Criteria Full compliance with requirements VDA 6.3 Methodology Earlier BI Methodology New Methodology Final Report Element Score Final Scor e Report Element Score Final Score Conformance 10 A Conformance 5 90 – 100 B Opportunity for Improvement (OFI)/ Observations Requirements mainly satisfied; Minor deviation 8 Requirements partially satisfied; significant deviation 6 Requirements Inadequately satisfied; major deviation 19 ISO/TS 16949 Methodology 80 – 89 4 3 Non Conformance Minor NCR 4 2 C Requirement not satisfied 0 Major NCR 1 NA-Not Applicable /NV-Not Valuated NA/NV NA / NV NA / NV 70 – 79 60 – 69 50 – 59 40 – 49 30 – 39 20 – 29 10 – 19 0–9 Sample scoring sheet 20 Sample scoring sheet Final Score results TS Element Element Score Details TS Clause 21 Brakes India Procedure Element Score Look for Objective evidence Elemental Scoring Methodology Proposed Brakes India Methodology Evaluation Criteria Element Score 22 Full compliance with requirements 5 Requirements mainly satisfied; Minor deviation 4 Requirements partially satisfied; significant deviation 3 Requirements Inadequately satisfied; major deviation 2 Requirement not satisfied 1 NA-Not Applicable /NVNot Valuated NA / NV 90 – 100 80 – 89 70 – 79 60 – 69 50 – 59 40 – 49 30 – 39 20 – 29 10 – 19 0–9 Final Scoring Methodology Evaluation Criteria Proposed Brakes India Methodology Final Score Full compliance with requirements Requirements mainly satisfied; Minor deviation 90 – 100 80 – 89 70 – 79 Requirements partially satisfied; significant deviation Requirements Inadequately satisfied; major deviation 60 – 69 50 – 59 40 – 49 30 – 39 20 – 29 Requirement not satisfied NA-Not Applicable /NV-Not Valuated 10 – 19 0–9 Benefits 24 Objective based Score cards Color coded Visual Dashboard gives direction to stake holders (Unit/Dept /Site Heads & Top Mgmt ) on focus areas Easy to Monitor/Review on going performance – Function wise/Unit or Dept wise /Clause wise Prioritization much easier No ambiguity in NCR finalization User friendly 3. Innovative approach in New Product audits .. Act • How to improve next time ? Check • Did things happen according to plan? 3. New Product System audit - at various APQP stages 25 Plan What to do? How to do it ? Do • Do what was planned ? What is the Innovation ? Introduced System Audit at different APQP phases Phase 1 : After Design Verification Phase 2 : After Product & Process validation Phase 3 : After PPAP & Before one month of SOP Phases of APQP – Approval to Develop – Quote Approval – Proposal Acceptance – Concept Verification – Design Verification – Product & Process validation – Product Launch – Program Close out 26 Phase 1 Phase 2 Phase 3 How New Product audit being Done ? Focus Elements: 27 • Readiness to meet Customer Requirements • Product / Process Design Readiness Review • Supplier Readiness • Plant /People Readiness • APQP Process Compliance How New Product audit being Done ? Check Points • Readiness to meet Customer requirements Customer special Requirement Response to customer concern • Supplier Readiness New supplier evaluation BOM Readiness Product / Process Design Readiness Review PCM (Product Characteristics Matrix) & SLP (Safe Launch Plan) Readiness and / or implementation Design documentation readiness Supplier launch readiness Product / Process Design Change management Supplier PPAP readiness (including Supplier packaging readiness) Review of CV / DV / PV testing results Process design / application readiness Packaging readiness 28 • Supplier Run @ rate results Incoming control readiness How New Product audit being Done ? • Plant Readiness Mistake Proofing Line walk audit Plant PPAP Readiness Safe Launch Plan • People Readiness Engineer / supervisor skill / training levels Line operator skill / training levels • APQP Process compliance APQP Review reports New launch program management Lessons learned Customer approval status Plant Run @ Rate status Reference: ZF TRW’s AQP (Advanced Quality Planning) Audit 29 What is to be checked ? (Phase I, Phase II, Phase III) Customer Requirements Readiness: Audit Sample Sheet 31 Plant Readiness: Audit Sample Sheet 32 Over all Readiness : Audit Sample Sheet 33 Improvement & Review Process NPRAA Result Caution status Phase I < 70% Phase II < 70% Phase III < 75% Related actions are required to be completed within one month Verification of Proposed Action status Pending as off proposed target High Risk, Escalate Team member and review Action for completion with revised target Completed as per target date 34 Successful action by Program Manager Graduation Phase I / II > or equal to 70 % Phase III > or equal to 75% Phase III > Or equal to 90% Sample NP Audit score - Dashboard SYSTEMS READINESS AUDIT SCORE CUSTOMER PROGRAM DESCRIPTION CATEGORY RB Caliper SlNo Project I PJ0029 T,V,D,E HCV Project Description Mfg Unit Unit 64 RB 60 Caliper withh xxxxx Pad , RB 68 Caliper with Xxxxx Pad ) AQP Audit - Phase I Feb 2015 Score April 2015 Score July 2015 Score 33 67 67 50 60 75 43 57 71 1 Design readiness 3 Supplier readiness TOTAL PG0029 Site Plbk Remarks . Friction TD to be released TOTAL July 2015 April 2015 Feb 2015 Supplier readiness Design readiness 0 10 20 30 40 50 60 70 80 90 100 Sample NP Audit score - Dashboard AQP Audit - Phase Il 1 3 4 5 6 8 Feb 2015 Score April 2015 Score July 2015 Score 33 50 17 25 0 33 27 56 50 17 25 0 33 33 78 75 83 100 75 100 83 Design readiness Supplier readiness Plant Readiness - 211- Mistake Proofing Plant Readiness - E212 - Documents Plant Readiness - G54 - Line Sign Off Plant Readiness - E213 - Safe Launch TOTAL Remarks TOTAL Plant Readiness - E213 - Safe Launch Plant Readiness - G54 - Line Sign Off July 2015 April 2015 Feb 2015 Plant Readiness - E212 - Documents Plant Readiness - 211- Mistake Proofing Supplier readiness Design readiness 0 36 10 20 30 40 50 60 70 80 90 100 Sample NP Audit score - Dashboard AQP Audit - Phase Ill 1 2 3 4 5 6 7 8 9 10 Design readiness Customer Readiness Supplier Readiness Plant Readiness - 211- Mistake Proofing Plant Readiness - E212 - Documents Plant Readiness - G54 - Line Sign Off Plant Readiness - PPAP Plant Readiness - E213 - Safe Launch People Readiness GDPIM Process Compliance TOTAL Feb 2015 Score April 2015 Score July 2015 Score 30 60 50 30 30 10 10 20 20 50 31 50 70 60 30 30 10 10 20 20 50 35 70 90 70 80 80 70 70 30 100 80 74 Remarks Packing Approval from TML PPAP / Re-PPAP Point. Line Sign off to be done. Implementation of SLP TOTAL GDPIM Process Compliance People Readiness Plant Readiness - E213 - Safe Launch Plant Readiness - PPAP July 2015 April 2015 Feb 2015 Plant Readiness - G54 - Line Sign Off Plant Readiness - E212 - Documents Plant Readiness - 211- Mistake Proofing Supplier Readiness Customer Readiness Design readiness 37 0 10 20 30 40 50 60 70 80 90 100 Benefits Ensure flawless New product launch by timely audit & review Able to Identify , Monitor & Review effectively on New product Systemic gaps – Function wise / APQP gate wise 38 Systemic issues are reduced after Product launch phase Customer specific requirements are captured and implemented prior to product launch Helps to sustain and continually improve QMS 4. Innovative approach in PFMEA 4. PFMEA - GYR approach Act • How to improve next time ? Check • Did things happen according to plan? 39 Plan What to do? How to do it ? Do • Do what was planned ? What is the Innovation ? PFMEA – GYR codification (Process Failure Mode Effective Analysis) 40 What is the Innovation ? Current Guidelines Earlier Method PFMEA PFMEA Final /Sub Assembly All Types of Assemblies & Other Mfg Process Category-1 SC / CC Other Mfg .Process Category-2 Non SC/CC Category-3 SC / CC Category-4 Non SC/CC S x O x D = RPN Action for High RPN S vs O S vs D S vs O S vs D S vs O S vs D S vs O S vs D R R R R R R R R Y Y G ZONE RED YELLOW GREEN 41 SEVERITY High OCCURRENCE High - PPM DETECTION Low – DETECTION LEVELS Y G Y G Y G Y G Y G Recommendations Error Proofing, Poka Yoke, 100% Testing Y G Actions Investments are prioritized Medium Medium - PPM Medium – DETECTION LEVELS Controls are medium like First off, Last off Low Low - PPM High – DETECTION LEVELS Controls are relaxed G How ? PFMEA Table Matrix Assembly / Sub assy ( SC / CC) Assembly / Sub assy ( Non SC / CC) Machining / Pressing / Moulding etc ( SC / CC ) Machining / Pressing / Moulding etc Non ( SC / CC ) Severity & Occurrence Table 1 Table 3 Table 5 Table 7 Severity & Detection Table 2 Table 4 Table 6 Table 8 How ? PFMEA Tables Severity x Detection Severity x Occurrence Table 7 Table 5 Table 3 Table 1 43 Table 8 Table 6 Table 4 Table 2 Benefits Addresses FMEA 4th Edition in an effective manner Covers various BI Processes under single SO & SD color coding To prioritize actions based on color coding To use PFMEA as an enabler and user friendly 44 5. Innovative approach in Integration of Six Sigma 5. Six Sigma integration with other Management Systems Act • How to improve next time ? Check • Did things happen according to plan? 45 Plan What to do? How to do it ? Do • Do what was planned ? How we integrate ? Integrating Six Sigma with Other Systems Customer Set Objectives Company ISO /TS 16949 TPM Objective ISO 14001 Medium Term Process Measurable & Targets Objectives & Objectives Objectives & Targets of Each Pillar Targets Regular Products Yes Monitor the Trends against the Targets & Benchmarks Trends with OHSAS Objectives & Targets Energy Objectives & Targets New Products/ Process No in Targets Process Optimization / Re validation / VA VE Identify the team (preferably members from Unit Tech Module / QC) Take the Current Process Parameters 46 Problem Solving Scope of project (Not Resolved nearly for more than 6 months) Nature of project (Really do not know the “Root Cause” of variation) New Process Validation Identify the team (preferably members from Unit Tech Module / QC) Take the Initial Process Parameters How we integrate ? 47 Six Sigma – Deployment Site Heads Leader/ Champion Master Black Belt (MBB) Black Belts (BB) Green Belts (GB) Project Team Members ( Yellow Belt –YB ) 48 Corp QMS Functional Heads / Module leaders Module leaders / Engineers First line supervisors Result : Six Sigma Skill set ( Plant wise ) Location MBB Black Belt Green Belt Yellow Belt GB & BB Projects BI - Padi - 10 22 53 46 BD- Sholingur - 6 9 29 21 BI- Polambakkam - 9 15 18 18 BI Foundry - 6 28 - 34 BI – Nanjangud & Sundaram Polymer - 6 12 14 18 BI – SEZ, Rolltec,Waki, Sitarganj, MRC1, MRC2 Gurgaon Plants - - 15 27 21 Corporate Departments (ER&D, Marketing, Corp QA, SDI, Corp MSE, QHSE, Padi Finance) 3 8 33 48 47 TOTAL 3 45 107 189 205 49 Six Sigma Project focus Project Themes • • • • • OEE Improvement Throughput Improvement Reliability Improvement Supply Chain Optimization Waste Elimination Project Themes Cost Focus • • • • Customer Focus Quality Improvement Lead time reduction Responsiveness Customer Experience Project Themes • • • • SHE Focus 50 Energy Recovery Effluent Reduction Water/fuel conservation Safety Improvement Over All Summary Benefits Innovative Approaches 51 Qualitative Quantitative 1. QMS Audit Planning – Planetary audits Audit plan and execution easier Reduced mandays CAR reply time less 2. QMS Audit Report – Score card / dashboard Audit is objective & colour coded Audit is Quantified with Score - GYR Status 3. New Product audits - @ diff. APQP stages Able to address system gaps prior to product launch Reduction in Safe launch PPM 4. PFMEA – Color coding Trigger actions based on GYR status 5. Six sigma integration with Management systems - Improving analytical skill of employees - Production / Product variation reduction Cost benefits, No. of GB, BB, YB Conclusion : With these Innovative Approaches we could realize our Vision of “Systems as the way we work” (Do Business) by Efficient & Effective Implementation of QMS and gain Customer Confidence 52 BI Plants - Location Matrix Locations across India Core Top Management Mother Plants Location Padi (0 Kms) Polambakkam ( 100 kms) Export Plants Rolltec Avadi ( 22 kms) SEZ ( 65 kms) Assembly Plants Waki ( 1148 Kms ) Sholinghur ( 102 Kms) Nanjangud ( 490 kms) Jhagadia ( 1654 Kms ) Gurgaon 1 ( 2292 Kms) Gurgaon 2 ( 2312 kms) Sitarganj ( 2245 Kms) Rolltec DTA ( 25 kms) Sub assy Plants Freins Engg ( 55 Kms) Wichitra 1 ( 8 kms) Aztec ( 7 kms) Aztec JSR (1581 Kms) Aztec Chakan ( 1225 Kms) Dedicated Satellite plants Wichitra 2 &3 ( 12 Kms) Friens Metals ( 10 Kms) Modular Auto 1&2 ( 8 kms) Trans Energy ( 12 kms) Task Press ( 12 kms ) 54 Processes in Brakes India 55 Brakes India – Customer / Product scope • 6 Vehicle Segments requirements • 52 OEM expectations • 28 Product catalogs CUSTOMER • Higher product Mix • New Technological Products • New multiple JV’s • BMW Group • General Motor Corporation • Daimler AG • PSA Peugeot Citroen • Fiat Chrysler Automotive • Renault • Ford Motor Company • Volkswagen AG IATF Subscribers 56 Red Zone area is more 57 Red Zone area is less 58
© Copyright 2026 Paperzz