NHC EPS BUILDING SYSTEM 1 2016 - NHC NHC EPS Building System Rising cost of construction , expensive cost of finance has made housing unaffordable to the majority of low and middle-income earners. NHC EPS Factory was Commissioned at Mlolongo area of Machakos County, a short distance from Nairobi, in May 2013 by National Housing Corporation which is wholly owned by the Government of Kenya. The establishment of an EPS production factory is part of the NHC vision to decently house the Nation. The factory is mandated to produce quality construction materials and will go a long way in providing adequate and affordable housing. The use of EPS panels as a substitute to traditional materials used in erecting walls, stairwells, floors and roofs is expected to reduce construction periods as well as direct and indirect building costs. Besides the return on capital invested, building a house using the EPS panels will significantly take less time than when constructing using conventional materials such as stones. 2 NHC EPS BUILDING SYSTEM IS CHANGING THE CONSTRUCTION METHODS WORLDWIDE STRONGER THAN BLOCK.MORE VERSATILE THAN STONE WALLING & FASTER THAN EITHER. In a world grown accustomed to evolutionary change one remarkable building, system is making a truly revolutionary impact on global construction methods – the EPS panel system. The components of the EPS panel system are simple – a more modified expanded polystyrene flanked by wire mesh connected with galvanized truss wires, field–coated with concrete. Yet its extraordinary designs, flexibility, ease of installation, veracity of application, and astonishing strength are changing the way construction industry sees the future. 3 GENERAL DESCRIPTIONS EPS PANELS Modified expanded polystyrene Core of 80mm - 200mm. Two outer layer of 50 mm x 50 mm wire mesh. Galvanized Truss Wire pierced core and are welded to the outer Mesh Layers Field applied Shortcrete EPS Panels are produced to exacting tolerance using potential high speed machinery. The panel’s lightweight yields dramatic advantages in lower transportation costs, easy job–site handling, rapid erection and installation. The EPS System allows the architect/engineer to design for various wind loads and seismic conditions. By varying the size of the wire reinforcement, thickness of shotcrete and incorporating formed-in-place beams and columns, most structural requirements can be met. The EPS panel system can be used in many buildings applicants; i.e. residential, commercial industrial and institutional; and is designed to meet standards building code requirements. The 3D panel system can be used in single story facilities, curtains, and privacy walls, sound barriers, load-bearing, non-load bearing retaining walls and roofs. 4 GENERAL DESCRIPTIONS SINGLE PANEL USED AS BEARING STRUCTURE FOR BUILDINGS UP TO 3÷4 STOREY, ON SITE FINISHING WITH STRUCTURAL SHOTCRETE PLASTERING IN BOTH SIDES; PARTITIONS; FLOORS WITH SHORT SPAN. 5 GENERAL DESCRIPTIONS SINGLE PANEL EVOLUTION USED AS BEARING WALL FOR SPECIAL CONSTRUCTIONS WHERE RESISTANCE IS REQUIRED. THE MESH IS PROVIDED WITH TRANSVERSAL WIRES TO GIVE THE OUTDISTANCE BETWEEN MESH AND POLYSTYRENE SHEET. THE MESH IS COMPLETELY COVERED BY THE CONCRETE 6 Panel Section GENERAL DESCRIPTIONS SINGLE PANEL USED AS BEARING STRUCTURE FOR BUILDINGS UP TO 3÷4 STOREY, ON SITE FINISHING WITH STRUCTURAL SHOTCRETE PLASTERING IN BOTH SIDES; PARTITIONS; FLOORS WITH SHORT SPAN. 7 GENERAL DESCRIPTIONS DOUBLE PANEL TWO SINGLE PANELS WITH INTERNAL AND EXTERNAL MESH, ASSEMBLED THROUGH CONNECTORS, THE CONCRETE IS POURED “IN SITU”. THE THICKNESS OF THE CORE CONCRETE WILL BE DEFINED ON THE BASIS OF THE STRUCTURAL REQUIREMENTS. THE OUTSIDE PANEL IS FINISHED USING STANDARD PLASTER OR READY MIX MATERIAL. 8 GENERAL DESCRIPTIONS FLOOR PANEL USED FOR FLOOR SLABS AND ROOFS WITH VARIABLE THICKNESS ACCORDING TO THE SPAN. THE REINFORCING STEEL IS PLACED INSIDE THE BEAMS AND POURED WITH CONCRETE ON SITE. 9 SYSTEM PERFORMANCE 1. LIGHT MATERIAL 2. EASY TO INSTALL - FAST CONSTRUCTION 3. FIRE RESISTANT 4. ENERGY EFFICIENT 5. LOWER UTILITY COSTS 6. EARTHQUAKE RESISTANT 7. VERSATILE – FLEXIBLE DESIGN 8. STORMS RESISTANT 9. SUPERIOR STRENGTH17 10 STRUCTURAL PLASTER THE CONCREWALL SINGLE PANEL USED AS BEARING ELEMENT IS FINISHED ON SITE THOUGHT STRUCTURAL PLASTER APPLICATION ON EACH SIDE. THE STANDARD FINAL THICKNESS OF ABOUT 3 CM. THE PANEL WILL FORM A PLATE OF REINFORCED CONCRETE WITH EXPANDED POLYSTYRENE CORE. THE STRUCTURAL PLASTER WILL HAVE MIXED CHOOSING SAND WITH GRANULOMETRY FROM 0 TO 5MM AND FINAL RESISTANCE OF AT LEAST 200 ÷ 250 DAN/CM2, VARIABLE ACCORDING TO THE STRUCTURAL PANELS AND GEOMETRY BUILDING CONDITIONS. THE PLASTER SHOULD HAVE A PLASTIC CONSISTENCY S2 (MEASURED SETTLEMENT WITH ABRAMS CONE LESS THAN 5CM). FOR STANDARD DOSAGE IN ONE CUBIC METER OF MASS, THE INDICATIVE QUANTITY OF EACH MATERIAL SHOULD BE: CONCRETE 350 KG SAND WITH MIXED GRANULOMETRY 1600 KG WATER 160 KG (LITERS) THE QUANTITY OF WATER MAY BE DIFFERENT ACCORDING TO THE NATURAL SAND HUMIDITY. THE FOLLOWING PARAMETER THAT SHOULD BE CONSTANT: A/C ~ 0,52 I/C ~ 4,5 THE SAND QUALITY SHOULD BE WITHOUT CLAY OR ANY ORGANIC SUBSTANCES AND TOTALLY WASHED. ANY PROBLEMS OF WORKABILITY MUST BE SOLVED WITHOUT ADDING WATER, AND USING FLUIDIFYING ADDITIVES DOSED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS. 11 THE RETRACTION CRACKS FORMATION CAN BE AVOIDED BY ADDING POLYPROPYLENE FIBERS 2013 - NHC INTO THE MIX (ONE KG PER M3). EASY TO INSTALL - FAST CONSTRUCTION RESIDENTIAL BUILDING 100M2 BUILT SURFACE: -PANELS ERECTION TIME: 2 DAYS WITH 5 WORKERS; -ROOF CONCRETE POURING + SHOTCRETE PLASTERING: 10 DAYS WITH 5 WORKERS -FINISHING: 10 DAYS WITH 4 WORKERS. 12 2013 - NHC CONSTRUCTION DETAILS WITH SINGLE PANELS 13 CONSTRUCTION DETAILS WITH DOUBLE PANELS 14 CONSTRUCTION DETAILS – REINFORCING MESHES 15 STATIC LOAD TEST ON A SINGLE FLOOR PANEL 12 cm THE LOAD TEST WAS CARRIED OUT GRADUALLY UNTIL REACHING THE COLLAPSE OF THE SLAB, CORRESPONDING TO A RATED LOAD UNIFORMLY DISTRIBUTED LOAD ACTING ON THE PORTION OF THE FLOOR OF 2000 KGF / SQ. THE LOAD WAS ACHIEVED BY THE PROGRESSIVE FILLING A WATER TANK WITH DIMENSIONS IN PLAN OF 300 CM X 300 CM AND HEIGHT 200 CM. MISSILE TEST Wind Science & Engineering Research Center_Texas Tech University •130 mm and 150 mm panels - are resistant to the Florida Building Code & Dade County Hurricane Envelope resistance = 55 km/h missile & 225 km/h hurricane (34 mph & 140 mph hurricane). •130 mm panel - threshold of perforation = 129 km/h missile & 322 km/h hurricane (80 mph & 200 mph hurricane) impact resistance, however since panel cracking becomes an issue with each impact, the panel resistance therefore considered as 122 km/h missile & 306 km/h hurricane (76 mph impact/190 mph). These are ICC-500 Storm Shelter standards. •150 mm panel - threshold of perforation = 142 km/h missile & 354 km/h hurricane (88+ mph & 220 mph hurricane) impact resistance. Since two of the panels were tested to the highest standard for hurricanes 177 km/hr & 354 km/h hurricane ( 110 mph & 220 hurricane - FEMA 361 Standard) and were reasonably resistant, the 150 mm panel can be rated to146 km/h & 362 km/h hurricane (90 mph & 225 mph hurricane) impact resistance, which is the highest rating per the ICC-500 standard. PROJECTS WITH NHC EPS SYSTEM 4 blocks 2br luxury apartment for sale at rongai While under construction 18 PROJECTS WITH NHC EPS SYSTEM 4 storey building for let at free area Nakuru town 7 storey building hostels at Wendani 19 PROJECTS WITH NHC EPS SYSTEM 7 storey Jikaze academy admin bloc at Mai Mahiu 6 Stoyer commercial flat next to TRM thika rd 20 PROJECTS WITH NHC EPS SYSTEM Ruai police housing project 4br under construction at kangundo rd 21 PROJECTS WITH NHC EPS SYSTEM Cdf office nyeri town constituency Boundary wall at pearl garden gatanda rd thika 22 PROJECTS WITH NHC EPS SYSTEM Residential at kamiti rd 1 storey cottage at kamiti rd 23 PROJECTS WITH NHC EPS SYSTEM 2 floors extension at parkland baptist church pry school in westland 4 floors extension flat at nyeri 24 FOR QUICK SALE PLEASE CONTACT NHC / EPS FACTORY MAVOKO NHC HOUSE AGA KHAN WALK NAIROBI Tel: +254202188286/33 Email: [email protected] Website:www.nhckenya.co.ke 25
© Copyright 2024 Paperzz