TEST PIT SUMMARY TEST METHOD DATE TS SM4 45 50 5 0.0 0.1 1.9 0.1 1.9 4.3 0.1 1.8 2.4 TS SM1 GW 15 1 75 9 10 60 0.0 01 0.1 4.6 4.8 0.1 46 4.6 4.8 5.5 0.1 45 4.5 0.2 0.7 TS SM3 GW SM2 38 4 25 60 36 60 2 60 15 10-05 0.0 0.1 0.5 0.1 0.5 0.1 0.4 TS GW old garbage dump 10-06 0.0 0.1 0.5 0.1 0.5 4.1 0.1 0.4 3.6 TS GW CL 3 80 42 13 55 7 3 0.0 0.1 0.7 0.1 0.7 4.9 0.1 0.6 4.2 TS GW CL 4 75 46 20 50 5 2 0.0 0.1 1.5 1.8 0.1 1.5 1.8 5.2 0.1 crushed sand 1.4 SM4 40 55 0.3 GW 4 46 3.4 SM4 40 55 5 50 5 10-04 10-07 10-08 1 1 200 150 FINES GRAVEL FINES 500 SOIL CLASSIFICATION 1 WATERTABLE (m) 150-300mm (%) 75-150mm (%) 3 MAX SIZE (mm) 32338 >300mm (%) 10-03 ABSORPTION %coarse/%fines 0.1 5.2 B.R.D coarse/fines 0.1 5.3 FRACTURE A/B 0.0 0.1 10-02 MgSO4 %coarse/ %fine 35 25 DURABILITY DEGRADE 30 15 CRUSH MICRO DEVAL GRAVEL 35 60 PIT RUN SAND EQUIVALENT SAND TS GM3 CL OVERSIZE LABORATORY TEST RESULTS GRAVEL FINES 0.1 1.0 3.2 FIELD VISUAL IDENTIFICATION Tracked Excavator September 28‐30, 2010 SAND SOIL CLASSIFICATION 0.1 1.1 4.3 10-01 DEPTH (m) 0.0 0.1 1.1 SAMPLE NUMBER To TEST PIT NUMBER From LAYER THICKNESS (m) East Pine Pit Peace SAND PROJECT DISTRICT TEST PIT SUMMARY TEST METHOD DATE TS SM2 GW CL 25 3 80 70 37 10 5 60 10 1 0.0 0.1 25 2.5 0.1 2.5 47 4.7 0.1 2.4 22 2.2 TS SM3 GW 35 2 55 38 10 60 3 1 2 350 1 0.0 0.1 2.9 0.1 2.9 4.9 0.1 2.8 2.0 TS SM3 GW 35 2 55 38 10 60 3 150 0.0 3.2 3.2 4.7 3.2 1.5 relocated OB GW 3 42 55 10-14 0.0 2.5 2.5 relocated OB 10-15 0.0 1.2 1.2 4.7 1.2 3.5 GW ML/CL 4 95 41 3 55 2 2 2 150 150 10-16 0.0 0.1 2.0 3.2 0.1 2.0 3.2 4.6 0.1 1.9 1.2 1.4 TS ML SP SW 90 2 2 5 90 68 5 8 30 2 150 0.0 1.2 1.2 5.1 1.2 3.9 GW CL 1 68 34 12 65 20 3 150 10-11 25839 10-12 X0105 10-13 10-17 FINES GRAVEL FINES SOIL CLASSIFICATION WATERTABLE (m) ABSORPTION %coarse/%fines 0.1 1.7 0.3 2.2 B.R.D coarse/fines MAX SIZE (mm) 0.1 1.8 2.1 4.3 FRACTURE A/B >300mm (%) 0.0 0.1 1.8 2.1 10-10 MgSO4 %coarse/ %fine 150-300mm (%) 10 60 10 DURABILITY DEGRADE 75-150mm (%) 75 37 10 1 CRUSH MICRO DEVAL GRAVEL 15 3 80 30375 PIT RUN SAND EQUIVALENT SAND TS SM1 GW CL OVERSIZE LABORATORY TEST RESULTS GRAVEL FINES 0.1 1.7 1.1 2.3 FIELD VISUAL IDENTIFICATION Tracked Excavator September 28‐30, 2010 SAND SOIL CLASSIFICATION 0.1 1.8 2.9 5.2 10-09 DEPTH (m) 0.0 0.1 1.8 2.9 SAMPLE NUMBER To TEST PIT NUMBER From LAYER THICKNESS (m) East Pine Pit Peace SAND PROJECT DISTRICT TEST PIT SUMMARY 10-21 1.7 4.9 1.7 3.2 ML SW 70 1 30 54 45 2 150 0.0 0.1 0.1 5.2 0.1 5.1 TS ML 95 5 0.1 33 3.3 5.1 0.1 32 3.2 1.8 TS ML GW 95 4 5 41 55 2 150 50 2 150 1 150 1 10-22 46605 1 0.0 2.5 2.5 4.9 2.5 2.4 ML GW 95 4 5 46 0.0 0.2 0.4 3.8 0.2 0.4 3.8 5.2 0.2 0.2 3.4 1.4 GP-GM SP GW GC3 10 3 2 30 40 97 38 20 0.0 0.4 3.4 0.4 3.4 4.9 0.4 3.0 1.5 GP-GM GW SP-SM 10 2 18 35 43 82 55 55 2 0.0 1.3 1.3 5.1 1.3 3.8 GW SP-SM 2 18 43 82 55 2 0.0 0.5 0.5 5.0 0.5 4.5 GP-GM SP-SM 10 18 40 82 50 10-23 46503 1 10-24 50278 1 10-25 49982 1 10-26 50 60 50 5 150 1 250 FINES GRAVEL SAND FINES SOIL CLASSIFICATION WATERTABLE (m) MAX SIZE (mm) >300mm (%) 150-300mm (%) 75-150mm (%) B0494 0.0 01 0.1 3.3 ABSORPTION %coarse/%fines 0.0 1.7 B.R.D coarse/fines 55 15 10 FRACTURE A/B 38 10 25 MgSO4 %coarse/ %fine 7 75 65 DURABILITY DEGRADE GP-GM CL ML CRUSH MICRO DEVAL 1.8 0.5 2.1 PIT RUN SAND EQUIVALENT 1.8 2.3 4.4 OVERSIZE LABORATORY TEST RESULTS GRAVEL 0.0 1.8 2.3 FIELD VISUAL IDENTIFICATION Tracked Excavator September 28‐30, 2010 SAND GRAVEL 10-20 SAND 1 FINES 10-19 B0819 To SOIL CLASSIFICATION 1 From LAYER THICKNESS (m) SAMPLE NUMBER 10-18 X3492 TEST METHOD DATE East Pine Pit Peace DEPTH (m) TEST PIT NUMBER PROJECT DISTRICT TEST PIT SUMMARY TEST METHOD DATE 1.2 2.2 3.6 4.9 0.6 0.9 ML SM2 GP GP-GM ML ML 80 20 4 10 65 95 20 80 36 40 5 5 46 89 FINES GRAVEL FINES SOIL CLASSIFICATION WATERTABLE (m) MAX SIZE (mm) >300mm (%) 150-300mm (%) 75-150mm (%) GRAVEL 60 50 30 ABSORPTION %coarse/%fines 0.0 1.2 1.2 3.4 3.4 7.0 7.0 11.9 11.9 12.5 12.5 13.4 B.R.D coarse/fines 10-03 95 5 12 88 100 95 5 FRACTURE A/B ML SM1 CH ML MgSO4 %coarse/ %fine 2.4 6.7 2.2 2.4 DURABILITY DEGRADE 0.0 2.4 2.4 9.1 9.1 11.3 11.3 13.7 64 64 8.8 64 25 CRUSH MICRO DEVAL 10-02 45 50 40 15 PIT RUN SAND EQUIVALENT SAND 5 20 6 35 5 43 45 40 15 20 5 To OVERSIZE LABORATORY TEST RESULTS GRAVEL FINES 95 80 94 65 95 12 5 20 70 80 95 From FIELD VISUAL IDENTIFICATION Auger September 30, 2010 SAND SOIL CLASSIFICATION ML ML ML ML ML GM1 GP-GM GM2 ML ML CH DEPTH (m) 2.1 2.6 1.1 0.3 1.5 0.6 0.6 0.8 0.8 1.5 1.5 10-01 SAMPLE NUMBER 0.0 2.1 2.1 4.7 4.7 5.8 5.8 6.1 6.1 7.6 7.6 8.2 8.2 8.8 8.8 9.6 9.6 10.4 10.4 11.9 11.9 13.4 TEST HOLE NUMBER LAYER THICKNESS (m) East Pine Pit Peace SAND PROJECT DISTRICT TEST PIT SUMMARY TEST METHOD DATE 28 10 96 30 96 4 96 94 70 10-06 0.0 1.2 1.2 7.6 1.2 6.4 GP ML/CH 2 93 43 2 55 5 10-07 0.0 9.1 9.1 ML 90 3 7 10-08 0.0 0.3 1.2 2.2 3.7 4.6 5.2 0.3 1.2 3.4 3.7 4.6 5.2 7.6 0.3 0.9 2.2 1.5 0.9 0.6 2.4 OB SM3 30 GP-GM 10 SP-SM 8 GP-GM 8 SP-SM 10 CH 100 70 40 92 42 90 25 2 38 50 38 50 38 GRAVEL SAND FINES GRAVEL SAND FINES ABSORPTION %coarse/%fines 2 90 4 70 4 96 4 4 B.R.D coarse/fines GP ML SP ML/CH SP ML SP SP FRACTURE A/B 3.0 0.4 27 2.7 1.2 4.0 0.3 2.7 0.9 MgSO4 %coarse/ %fine 3.0 3.4 61 6.1 7.3 11.3 11.6 14.3 15.2 64 DEGRADE 0.0 3.0 34 3.4 6.1 7.3 11.3 11.6 14.3 10-05 45 60 36 50 50 40 38 DURABILITY MICRO DEVAL ML 100 SP-SM 5 95 GP-GM 8 43 GP 4 36 SP 4 60 GP 4 46 GM4 40 10 SP 4 56 ML/CH 60 2 CRUSH SAND EQUIVALENT 0.6 2.1 0.3 4.6 1.5 2.2 0.3 1.8 1.8 PIT RUN SOIL CLASSIFICATION 0.6 2.7 3.0 7.6 9.1 11.3 11.6 13.4 15.2 MAX SIZE (mm) 0.0 0.6 2.7 3.0 7.6 9.1 11.3 11.6 13.4 10-04 >300mm (%) To 150-300mm (%) From 75-150mm (%) GRAVEL SAND FINES OVERSIZE Auger September 30, 2010 LABORATORY TEST RESULTS WATERTABLE (m) FIELD VISUAL IDENTIFICATION SOIL CLASSIFICATION LAYER THICKNESS (m) East Pine Pit Peace DEPTH (m) SAMPLE NUMBER TEST HOLE NUMBER PROJECT DISTRICT TEST PIT SUMMARY 1.5 0.3 1.2 16 1.6 0.6 2.4 SP-SM SP-SM GP ML SP-SM CH 5 10 3 53 10 80 75 50 48 35 90 5 15 0.0 0.6 3.8 0.6 3.8 7.6 0.6 3.2 3.8 ML SP CH 100 4 90 80 5 6 15 FINES GRAVEL SAND FINES SOIL CLASSIFICATION WATERTABLE (m) MAX SIZE (mm) >300mm (%) 150-300mm (%) 75-150mm (%) GRAVEL 20 40 49 10 ABSORPTION %coarse/%fines 1.5 1.8 3.0 46 4.6 5.2 7.6 10 38 B.R.D coarse/fines 0.0 1.5 1.8 30 3.0 4.6 5.2 58 10 36 FRACTURE A/B 80 95 38 88 60 5 85 10 MgSO4 %coarse/ %fine 20 5 4 2 4 95 15 80 DURABILITY DEGRADE SM2 SP-SM GP SP SP ML SM1 CH CRUSH MICRO DEVAL 0.6 0.6 2.6 0.8 0.6 1.8 1.8 3.4 PIT RUN SAND EQUIVALENT 0.6 1.2 3.8 4.6 5.2 7.0 8.8 12.2 OVERSIZE LABORATORY TEST RESULTS GRAVEL 0.0 0.6 1.2 3.8 4.6 5.2 7.0 8.8 FIELD VISUAL IDENTIFICATION Auger September 30, 2010 SAND SAND To DEPTH (m) FINES 10-11 From SOIL CLASSIFICATION 10-10 TEST METHOD DATE East Pine Pit Peace LAYER THICKNESS (m) 10-09 SAMPLE NUMBER TEST HOLE NUMBER PROJECT DISTRICT TEST PIT SUMMARY TEST METHOD DATE Peace 1.4 1.5 2.4 3.5 5.5 6.0 1.4 0.1 0.9 1.1 2.0 0.5 OB SP GP CL GP CL 12-05 0.0 1.5 1.5 2.6 2.6 4.0 1.5 1.1 1.4 GP SP GP 3 2 3 33 95 33 44 3 44 12-06 0.0 1.7 1.7 2.7 2.7 4.8 1.7 1.0 2.1 GP SP CL 4 2 98 38 90 2 58 8 1 12-07 0.0 3.5 3.5 4.8 3.5 1.3 GP-GM 7 28 CL 100 65 3 0.0 1.1 1.8 3.2 1.1 0.7 1.4 0.7 GP-GM 7 35 CL 100 GP-GM 7 35 CL 100 58 3 150 58 3 150 12-08 1.1 1.8 3.2 3.9 MAX SIZE (mm) >300mm (%) 150-300mm (%) 75-150mm (%) GRAVEL SAND FINES 4 96 2 35 95 5 2 35 100 63 63 150 3.5 3.2 ABSORPTION %coarse/%fines 0.0 1.4 1.5 2.4 3.5 5.5 12-04 B.R.D coarse/fines 97 FRACTURE A/B 3 MgSO4 %coarse/ %fine OB SP DEGRADE 1.8 4.2 1 MICRO DEVAL 0.0 1.8 1.8 6.0 68 SAND EQUIVALENT 12-03 8 DURABILITY GRAVEL 28 150 FINES 4 2 October 10, 2012 CRUSH GRAVEL GP 66 SAND 3.5 4 30 100 4 88 FINES 0.0 3.5 To PIT RUN SOIL CLASSIFICATION 12-02 45395 From OVERSIZE TRACKED EXCAVATOR LABORATORY TEST RESULTS WATERTABLE (m) SOIL CLASSIFICATION GP CL SP 12-01 DEPTH (m) 1.5 1.6 1.9 SAMPLE NUMBER 0.0 1.5 1.5 3.1 3.1 5.0 TEST PIT NUMBER LAYER THICKNESS (m) FIELD VISUAL IDENTIFICATION SAND PROJECT DISTRICT East Pine Pit TEST PIT SUMMARY Peace 12-15 5 4 1 28 0.5 2.9 GP SM4 4 43 32 57 54 0.0 0.3 0.3 3.0 0.3 2.7 FILL SP 2 93 5 0.0 0.3 0.3 4.3 0.3 4.0 FILL ML 95 5 68 3 150 ABSORPTION %coarse/%fines B.R.D coarse/fines FRACTURE A/B MgSO4 %coarse/ %fine DEGRADE MICRO DEVAL SAND EQUIVALENT DURABILITY GRAVEL FINES 12-14 94 October 10, 2012 CRUSH GRAVEL 0.0 0.5 0.5 3.4 TS ML GP 5.1 SAND 12-13 58 FINES 0.1 2.6 3.3 38 80 PIT RUN SOIL CLASSIFICATION 0.0 0.1 0.1 2.7 2.7 6.0 150 3.9 4 20 TRACKED EXCAVATOR LABORATORY TEST RESULTS WATERTABLE (m) 12-12 MAX SIZE (mm) OB 3 >300mm (%) 6.0 150-300mm (%) 0.0 6.0 57 75-150mm (%) 12-11 GP-GM 8 35 ML 7 93 SP 4 96 CL 100 GRAVEL GP SM2 SAND 4.6 0.5 OVERSIZE FINES 0.0 4.6 4.6 5.1 12-10 SOIL CLASSIFICATION 1.1 1.6 1.2 0.2 DEPTH (m) 1.1 2.7 3.9 4.1 SAMPLE NUMBER 0.0 1.1 2.7 3.9 TEST PIT NUMBER To LAYER THICKNESS (m) FIELD VISUAL IDENTIFICATION From 12-09 TEST METHOD DATE East Pine Pit SAND PROJECT DISTRICT
© Copyright 2026 Paperzz