Equatorial Guinea Acknowledgments The (I)NDC Content Briefs were produced by the Climate Policy Team of the World Bank Climate Change Group. The team was led by Sebastian Wienges and Ana Bucher under the supervision of Stephen Alan Hammer. Detail analysis of country (I)NDC was provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation components). The team is grateful for all comments and suggestions received from regional and sector specialists regarding the presentation and synthesis of relevant information. © 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org Climate Policy Team World Bank Group | SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | Introduction In response to a growing interest in understanding (Intended) Nationally Determined Contributions ((I)NDCs) and with regard to the ultimate goal of supporting countries' implementation of their national climate targets, the World Bank Climate Policy Team (WBCPT) has reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief aims to provide a summary analysis of existing and instead country mitigation and adaptation policies and plans, commitments and targets, implementation strategies and sector priorities, associated costs and conditionalities, and stated gaps and needs, among other issues. The (I)NDC content briefs are created solely on the basis of information from submitted (I)NDCs and makes no inferences about robustness, quality, or viability of intended policies or actions. The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify and familiarize with a range of country priorities in terms of sectoral engagement, and needs in terms of capacity building, technology transfer, and financing. Based on this comprehensive mapping exercise, the WBG will develop a useful, easytouse, and interactive database and briefs of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks (CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices (GPs), regions, and country units for the identification of potential development opportunities, analytical studies and technical assistance to support countries' implementation of planned policies and actions. Indepth summaries of (I)NDCs by sectors and regions will be prepared at a later stage. In regards to Adaptation, although no global adaptation mechanism is established, the Paris Agreement parties are required to engage in adaptation planning and implementation of actions which include preparation of adaptation plans. The Adaptation section of a large number of submitted (I)NDCs, aims to increase development planning and scale the ability of countries to adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse gas emissions development, in a manner that does not threaten sustainable development. In addition to requested finance, the implementation of country commitments is largely tied to significant amounts of external assistance to support development and execution of adaptation plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component, the process will ensure increased resilience is recognized under the UNFCCC and climate finance mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows. Climate Policy Team World Bank Group | SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | Table of Contents I | Overall Planning and Preparation Process II | Mitigation Economywide Targets Economywide Policies Mitigation Actions and Policies III | Adaptation Adaptation Targets Adaptation Context Adaptation Actions and Policies Acronyms BAU Business as Usual CIFPPCR Climate Investment Funds Pilot NAP Program for Climate Resilience National Adaptation Plan DRM Disaster Risk Management National Adaptation Programmes of Action INDC Intended Nationally Determined REDD+ Contributions Reducing emissions from deforestation and forest degradation and the role of conservation, sustainable management of forests and enhancement of forest carbon stocks in developing countries LEDS Low Emission Development Strategy Land Use and Land Use Change and Forestry Climate Policy Team World Bank Group | NAMA NAPA LULUCF Nationally Appropriate Mitigation Actions SUB-SAHARAN AFRICA | Equatorial Guinea | (Intended) Nationally Determined Contribution Overall Planning and Preparation Process 3.94 $ in Billion USD) TOTAL COST OF IMPLEMENTATION ( a (mitig tion and adaptation) How reliable is the prioritization of the (I)NDC? How serious is the government about implementing policies and actions to achieve the (I)NDC targets? Political decision of adoption of INDC at: Head of state level Interministerial level Parliament Ministry Level HEAD OF STATE Technical development of INDC through a participatory process Stakeholder involvement Multisector commision Have development benefits been assessed and considered in the planning process? Are there climate policies and actions already in place/under development? LEDS NAMAS NAPA Climate Policy Team World Bank Group | SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | Existing policies: Has the INDC development been supported by a development partner? Technical support Financial support Implementation Plans and Needs Specific requests for international provision of means of implementation: Technology Transfer Financial support Capacity Building YES YES YES Does the INDC intend the private sector to be involved in the implementation of the NDC? Are carbon pricing/international market mechanisms intended? YES Are there any barriers identified? Link list: • Equatorial Guinea INDC Factsheet (projected per capita emissions): http://www.climateenergycollege.net/files/site1/factsheets/EquatorialGuinea_INDCFactsheet_UoMPRIMAP_GWPAR4.pdf Climate Policy Team World Bank Group | SUB-SAHARAN AFRICA | Equatorial Guinea | (Intended) Nationally Determined Contribution Mitigation ECONOMY-WIDE TARGETS TARGET YEAR 2030 Conditionality: 3.67 TARGET TYPE -20% Absolute Emission Reduction Compared to Base Year (%) 2010 in Billion USD) ( COST OF IMPLEMENTATION INDC page link Unconditional part of mitigation target: n/a Estimated costs for implementation: Conditional part of mitigation target: Estimated costs for implementation: TARGET YEAR 2050 Conditionality: 3.67 TARGET TYPE -50% Absolute Emission Reduction Compared to Base Year (%) 2010 in Billion USD) ( COST OF IMPLEMENTATION INDC page link Unconditional part of mitigation target: Estimated costs for implementation: Conditional part of mitigation target: Estimated costs for implementation: Coverage of Gases: Other Targets: POLICIES: Climate Policy Team World Bank Group | n/a n/a n/a CO 2, CH 4, N 2O SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | MITIGATION ACTIONS AND POLICIES TRANSPORT Plans: Transport: General P. 11 Urban Transport Climate Policy Team World Bank Group | | SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | MITIGATION ACTIONS AND POLICIES LULUCF/FORESTRY Plans: LULUCF/Forestry: General P. 11 Conservation REDD+ Climate Policy Team World Bank Group | | SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | MITIGATION ACTIONS AND POLICIES CONSERVATION Plans: Streghthen system of nationally protected areas Climate Policy Team World Bank Group | Estimated total costs for implementation: Capacity building needs: Technology needs: Unconditional part of mitigation target: n/a n/a n/a n/a Estimated costs for implementation: n/a Conditional part of mitigation target: n/a Estimated costs for implementation: n/a Emission reduction potential: n/a INDC page link SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | MITIGATION ACTIONS AND POLICIES REDD+ Plans: Implementation of REDD+ Climate Policy Team World Bank Group | INDC page link Estimated total costs for implementation: Capacity building needs: Technology needs: Unconditional part of mitigation target: n/a n/a n/a n/a Estimated costs for implementation: n/a Conditional part of mitigation target: n/a Estimated costs for implementation: n/a Emission reduction potential: n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | MITIGATION ACTIONS AND POLICIES ENERGY Plans: Renewable Energy: Hydro P. 11 Renewable Energy P. 11 Energy: General Demand-Side Efficiency: Industries Climate Policy Team World Bank Group | | SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | MITIGATION ACTIONS AND POLICIES RENEWABLE ENERGY: HYDRO Plans: Increase of hydropower Estimated total costs for implementation: Capacity building needs: Technology needs: Unconditional part of mitigation target: Climate Policy Team World Bank Group | INDC page link P. 11 623.7 mln 2030 | 836.3 mln 2050 n/a n/a n/a Estimated costs for implementation: n/a Conditional part of mitigation target: n/a Estimated costs for implementation: n/a Emission reduction potential: n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | MITIGATION ACTIONS AND POLICIES RENEWABLE ENERGY Plans: Increase in renewables for remote areas Estimated total costs for implementation: Capacity building needs: Technology needs: Unconditional part of mitigation target: Climate Policy Team World Bank Group | INDC page link P. 11 834.6 mln 2030 | 1324.5 mln 2050 n/a n/a n/a Estimated costs for implementation: n/a Conditional part of mitigation target: n/a Estimated costs for implementation: n/a Emission reduction potential: n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | MITIGATION ACTIONS AND POLICIES DEMAND-SIDE EFFICIENCY: INDUSTRIES Plans: Improve overall efficiency Climate Policy Team World Bank Group | INDC page link Estimated total costs for implementation: Capacity building needs: Technology needs: Unconditional part of mitigation target: n/a n/a n/a n/a Estimated costs for implementation: n/a Conditional part of mitigation target: n/a Estimated costs for implementation: n/a Emission reduction potential: n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | MITIGATION ACTIONS AND POLICIES WASTE Plans: Waste: General Climate Policy Team World Bank Group | | SUB-SAHARAN AFRICA | Equatorial Guinea | (Intended) Nationally Determined Contribution Adaptation ADAPTATION TARGETS 0.27 TARGET YEAR 2030 in Billion USD) ( COST OF IMPLEMENTATION ADAPTATION CONTEXT Existing National Development/Resilience Policies and Plans National Communications NAPs NAPAS CIF-PPCRs Sectoral Strategies Cross-cutting Conditionality: Unconditional part of adaptation implementation Conditional part of adaptation implementation Conditional upon international provision of means of implementation Climate Policy Team World Bank Group | N/A N/A YES SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | ADAPTATION ACTIONS AND POLICIES CROSS-CUTTING AREA Actions: CONDITIONAL ACTIONS: INDC page link Research, awareness raising, information gathering CAPACITY BUILDING AND KNOWLEDGE TRANSFER Funder Implementing Agency Cost Estimation n/a n/a Total Implementation Cost per Subsector: Total Implementation Cost for Unconditional Actions: Total Implementation Cost for Conditional Actions: n/a usd 220.20 million Implementation Needs: Technology Transfer: Capacity Building: Climate Policy Team World Bank Group | n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | ADAPTATION ACTIONS AND POLICIES CLIMATE RISK MANAGEMENT Actions: CONDITIONAL ACTIONS: INDC page link Regular analysis of the national infrastructure's resilience capacity Funder Implementing Agency Cost Estimation n/a n/a Total Implementation Cost per Subsector: Total Implementation Cost for Unconditional Actions: Total Implementation Cost for Conditional Actions: n/a usd 22.30 million Implementation Needs: Technology Transfer: Capacity Building: Climate Policy Team World Bank Group | n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | ADAPTATION ACTIONS AND POLICIES DISASTER RISK MANAGEMENT (DRM) Actions: CONDITIONAL ACTIONS: INDC page link Perform regular diagnostics on national vulnerabilities to climate change MONITORING AND EVALUATION SYSTEM Funder Implementing Agency Cost Estimation n/a n/a Total Implementation Cost per Subsector: Total Implementation Cost for Unconditional Actions: Total Implementation Cost for Conditional Actions: n/a usd 14.50 million Implementation Needs: Technology Transfer: Capacity Building: Climate Policy Team World Bank Group | n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | ADAPTATION ACTIONS AND POLICIES DISASTER PREPAREDNESS Actions: CONDITIONAL ACTIONS: INDC page link Construction of meteorological stations across the country Install early warning systems Construct rainfall station in hydroelectric installations to monitor changes in rainfall Funder Implementing Agency Cost Estimation n/a n/a Total Implementation Cost per Subsector: Total Implementation Cost for Unconditional Actions: Total Implementation Cost for Conditional Actions: n/a usd 73.40 million Implementation Needs: Technology Transfer: Capacity Building: Climate Policy Team World Bank Group | n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | ADAPTATION ACTIONS AND POLICIES AGRICULTURE Actions: CONDITIONAL ACTIONS: INDC page link Promoting climate-resilient agriculture CLIMATE SMART AGRICULTURE Funder Implementing Agency Cost Estimation n/a n/a Total Implementation Cost per Subsector: Total Implementation Cost for Unconditional Actions: Total Implementation Cost for Conditional Actions: n/a usd 17.30 million Implementation Needs: Technology Transfer: Capacity Building: Climate Policy Team World Bank Group | n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | ADAPTATION ACTIONS AND POLICIES ENERGY Actions: CONDITIONAL ACTIONS: RENEWABLE ENERGY: HYDRO INDC page link Construct rainfall station in hydroelectric installations to monitor changes in rainfall Funder Implementing Agency Cost Estimation n/a n/a Total Implementation Cost per Subsector: Total Implementation Cost for Unconditional Actions: Total Implementation Cost for Conditional Actions: n/a usd 31.20 million Implementation Needs: Technology Transfer: Capacity Building: Climate Policy Team World Bank Group | n/a SUB-SAHARAN AFRICA Equatorial Guinea (Intended) Nationally Determined Contribution | | ADAPTATION ACTIONS AND POLICIES ENVIRONMENT Actions: CONDITIONAL ACTIONS: INDC page link Integrated watershed management WATERSHED AND RIVER BASIN MANAGEMENT Funder Implementing Agency Cost Estimation n/a n/a Total Implementation Cost per Subsector: Total Implementation Cost for Unconditional Actions: Total Implementation Cost for Conditional Actions: n/a usd 25.30 million Implementation Needs: Technology Transfer: Capacity Building: Climate Policy Team World Bank Group | n/a
© Copyright 2026 Paperzz