Visit us @ Sehpaathi.in DATA INTERPRETATION PRACTICE SET XV Directions (Questions 01-05): Study the following bar-graph and pie-chart carefully to answer the following questions. Visit us @ Sehpaathi.in 1).What is the difference of time taken by boat A and boat B to travel 200 km upstream? a) 68 hours b) 72 hours c) 71 hours d) 75 hours e) 84 hours 2).What is the time taken by Shyam to reach his destination upstream? a) 272 hours b) 245 hours c) 240 hours d) 232 hours e) 268 hours 3).If the speed of boat C is increased by 40 % and the speed of stream decreases by 20% then what is the difference between the time taken by the boat now and that taken previously to travel 200 km?(Assume opposite direction of stream) a) 28×(6/23) b) 22×(4/5) c) 20×(4/5) d) 35×(5/6) e) 18×(5/6) 4). If the speed of boat D increases by 10% then what is the approximate time taken by Shyam to reach 500 km by boat D? (Assume opposite direction of stream) Visit us @ Sehpaathi.in a) 88 hours b) 92.6 hours c) 68 hours d) 78 hours e) 44 hours 5).What is the ratio of the time taken by boat C to that taken by boat D? (Assume opposite direction of stream) a) 9 : 7 b) 7 : 5 c) 5 : 3 d) 4 : 3 e) 3 :2 Directions (Questions 06-10): Study the given table carefully to answer the following questions. The table shows the time (in days) taken by five men who do different types of work. Types of Building construction Road construction Bridge construction Tower installation Rituraj 20 18 24 26 Amarkant 22 24 20 28 Vishwamohan 18 26 28 24 Prithusen 24 22 30 20 Latiteshwar 26 20 26 30 Work Name Visit us @ Sehpaathi.in 6).How many days would Rituraj, Amarkant and Prithusen take to construct a building when they work together? a) 5×(4/5) days b) 4×(1/3) days c) 8×(1/2) days d) 53/181 days e) 6×(2/3) days 7).How many days would Vishwamohan, Laliteshwar and Riturraj take to instal 10 towers when they work together? a) 90 days b) 88.13 days c) 92.92 days d) 87 days e) 85.41 days 8).The bridge construction work is initiated by Rituraj, Prithusen and Latliteshwar together. After four days Laliteshwar leaves the work and Amarkant joins them. In how many days will the work be completed? a) 7×(13/25) days b) 5×(72/143) days c) 10×(68/138) days d) 4×(24/65) days e) 12×(12/65) days Visit us @ Sehpaathi.in 9).What would be the time taken to construct 5 buildings and 4 different roads when Rituraj, Prithusen and Vihwamohan work together? a) 65.61 days b) 61.53 days c) 64.45 days d) 62.63 days e) 68.32 days 10).Rituraj and Amarkant got Rs 50000 for building construction. What is the share of Rituraj? a) Rs 25000 b) Rs 26190.47 c) Rs 24130.5 d) Rs 22990.7 e) Rs 28970.5 Visit us @ Sehpaathi.in SOLUTIONS: 1. Time taken by boat A to travel 200 km = 200/(18-10) = 25 hrs Time taken by boat B to travel 200 km = 200/(14 – 12) =100 hrs :. Read different = (100 – 25) = 75 hours So the answer is: D 2. Total distance travelled by Shyam =1000 km Distance covered by boat A = 1000 × (40/100) = 400 km Time taken by boat A = 400/ (18 – 10) =50 hours Time taken by boat B = [1000 × (18/100)] / (14 – 12) = 90 hours Time taken by boat C =[1000 × (26/100)] / (10 – 6) = 65 hours Time taken by boat D = [1000 × (16/100)] / (14 -10) =40 hours :. Time taken by Shyam = (50 + 90 + 65 + 40 ) 245 hours So the answer is: B 3. Speed of boat C after 40% increase in its speed = 10 × (140/100) = 14 kmph Speed of stream after 20% decrease = 6 × (80/100) = 4.8 kmph Now, time taken by boat C = 200/(14 - 4.8) = 200/9.2 = 21 ×(17/23) hours Time taken by boat previously = 200/(10 – 6) = 200/4 =50 hours :. Difference = (50 – 21× 17/23) = 28× 6/23 hours So the answer is: A 4. New speed of boat D = 14 × (110/100) = 15.4 kmph Time taken to travel 500 km = 500/(15.4 – 10) = 92.54 ~ 92.6 km Visit us @ Sehpaathi.in So the answer is: B 5. Time taken by boat C = x km/(10 + 6) Time taken by boat D = x km /( 10 + 14) :. Read ratio = (x/16) : (x/24) = 3 : 2 So the answer is: E 6. Part of building construction by Rituraj in one day = 1/20 by Amarkant = 1/22 and by Prithusen = 1/24 work of building construction done in 1 day by all three together= (1/20 + 1/22 + 1/24) = 181/1320 ie, they construct a building in 1320/181 = 7 ×53/181 days So the answer is: D 7. The part of work of tower installation done by Vishwamohan in one day = 1/24, that Laliteshwar in one day = 1/30 and that by Rituraj in one day = 1/26 The part work of tower installation done by all three together in one day =1/24 + 1/30 + 1/26 = 177/1560 :. 1 tower installation work is done in 1560 /177 days :. 10 tower installation work is done in (1560 ×10)/177 = 88.13 days So the answer is: B 8. The part of work of bridge construction done by Rituraj, Prithusen and Laliteshwar in 4 days = (1/24 + 1/30 + 1/26) × 4 = (177 × 4) / 1560 = 708/1560 =59 / 130 The part of work of bridge construction done by Rituraj, Prithusen and Amarkant in one day = (1/24 + 1/30+ 1/20) =(5 + 4 + 6)/120 = 1/8 Visit us @ Sehpaathi.in After 4 days the remaining work = 1- (59/130) = (130 – 59)/130 = 71/130 Now, 71/130 work is done by Rituraj,Prithusen and Amarkant in (71/130) / (1/8)= (71 × 8)/130= 568/130 = 4 ×(24/65) days So the answer is: D 9. When Rituraj, Prithusen and Viswamohan work together, the work of building construction done by them = (1/20 + 1/24 + 1/18 ) = 53/360 per day work of road construction (1/18 + 1/22 +1/26) = 359/2574 53/360 part of building construction work is done in [360/53) × 5] = 33.96 days 359/2574 part of road construction is done in 1 day. 4 roads are constructed in [2574/359) × 4] = 28.67 days :. Total time taken = (33.96 + 28.67) = 62.63 days So the answer is: D 10. Ratio of work done by Rituraj to that by Amarkant in one day in building construction Or, Rituraj : amarkant = 1/20 : 1/22 = 11 : 10 Total wage = 500000 :. Share of Rituraj = 5000 × (11/21) = Rs 26190.47 So the answer is: B
© Copyright 2026 Paperzz