09HP21-V1 - Mercia Garden Products

09HP21-V1
09/08/12
Please retain product label and instructions for future reference
1
Before assembly
please make sure you have a
suitable base ready to erect your
building
4
3
2
MADE IN GREAT BRITAIN
Corner Leg Qty 2
Centre Leg
Right Leg
Left Leg
Fixing Kit
Left Shelves
Overall Dimensions:
5
Length = 1014mm
Width = 2007mm
Height = 1600mm
Sales Dept. 01636 880518
[email protected]
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
11
First Shelf Qty 1
x2
Mercia Garden Products Limited, Sutton On Trent,
Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
2mm Drill bit
This building should be erected by
two adults
For ease of assembly, it is advisable to
pilot drill all screw holes and ensure
all screw heads are countersunk.
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every effort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timber.
For Assistance Please
Contact Customer Care on
01636 880514
First Shelf Qty 1
12
6
Second Shelf Qty 1
Second Shelf Qty 1
7
13
Third Shelf Qty 1
Third Shelf Qty 1
14
8
Fourth Shelf Qty 1
Fourth Shelf Qty 1
9
15
Fifth Shelf Qty 1
TIMBER
As with all natural materials, timber can be affected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor product is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Right Shelves
Fifth Shelf Qty 1
16
10
Sixth Shelf Qty 1
Sixth Shelf Qty 1
Centre Shelves
23
Step 1
First Shelf Qty 1
Lay the centre pole flat on the floor,
with the widest flat edge on the
floor. Line the bottom end of the
centre pole up against a flat edge.
17
Second Shelf Qty 1
Mark 1160mm along the pole. This
is where the top of the legs shall be
fixed to the pole.
18
Third Shelf Qty 1
4
3
Line the right leg up to the line just
marked, making sure the bottom
edge of the leg lines up to the
bottom of the centre pole.
19
Fourth Shelf Qty 1
Attach the right leg to the pole
using a 70mm screw
approximatley 30mm from the top
of the leg and a 100mm screw
beneth this.
20
Fifth Shelf Qty 1
21
2x70mm screws
2x100mm screws
Do the same for the left leg.
Sixth Shelf Qty 1
22
Step 2
Stand the product up.
Centre Pole
Line the centre leg up to the
line marked in step one. Attach
the centre leg again with a
70mm screw 30mm from the
top of the leg and a 100mm
screw beneth this.
23
Nail Bag
100mm Screw x 6
70mm Screw x 20
60mm Screw x 86
2
2x70mm screws
2x100mm screws
Step 5
Step 3
Attach the sixth level of
shelving to the leg frame,
flush with the back of the shelf
legs using 60mm screws.
Position a corner leg up against
the post so it fits flush against the
post.
Attach the leg to the pole using a
70mm screw from near the top of
the leg into the pole.
Do the same for the other corner
leg.
1
10
16
22
1
16x60mm screws
2x70mm screws
Step 6
Step 4
Attach the fifth level of
shelveing together using
70mm screws.
Attach the sixth level of
shelveing together using
70mm screws.
15
9
10
16
21
22
2x70mm screws
2x70mm screws
Step 9
Step 7
Attach the fifth level of
shelving to the leg frame,
flush with the back of the legs
using 60mm screws.
Attach the third level of
shelving using the same
method described in the
previous steps.
7
13
19
15
9
21
2x70mm screws
16x60mm screws
16x60mm screws
Step 10
Step 8
Attach the second level of
shelving using the same
method described in the
previous steps.
Attach the fourth level of
shelving using the same
method described in the
previous steps.
6
12
18
14
8
20
2x70mm screws
16x60mm screws
2x70mm screws
16x60mm screws
Step 11
Attach the first level of
shelving by again fixing the
shelves together using 2
70mm screws.
Attach the shelves fush to the
back legs using 4 60mm
screws.
5
11
17
2x70mm screws
4x60mm screws
The Half Pyramid Plant Display
can be doubled up to make a
full pyramid. Back both half
pyramids towards each other,
making sure the edges are
flush.