09HP21-V1 09/08/12 Please retain product label and instructions for future reference 1 Before assembly please make sure you have a suitable base ready to erect your building 4 3 2 MADE IN GREAT BRITAIN Corner Leg Qty 2 Centre Leg Right Leg Left Leg Fixing Kit Left Shelves Overall Dimensions: 5 Length = 1014mm Width = 2007mm Height = 1600mm Sales Dept. 01636 880518 [email protected] BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY - Check the pack and make sure you have all the parts listed. - When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit. - Ensure there is plenty of space and a clean dry area for assembly. 11 First Shelf Qty 1 x2 Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk 2mm Drill bit This building should be erected by two adults For ease of assembly, it is advisable to pilot drill all screw holes and ensure all screw heads are countersunk. Winter = High Moisture = Expansion Summer = Low Moisture = Contraction CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber. For Assistance Please Contact Customer Care on 01636 880514 First Shelf Qty 1 12 6 Second Shelf Qty 1 Second Shelf Qty 1 7 13 Third Shelf Qty 1 Third Shelf Qty 1 14 8 Fourth Shelf Qty 1 Fourth Shelf Qty 1 9 15 Fifth Shelf Qty 1 TIMBER As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor product is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow. Right Shelves Fifth Shelf Qty 1 16 10 Sixth Shelf Qty 1 Sixth Shelf Qty 1 Centre Shelves 23 Step 1 First Shelf Qty 1 Lay the centre pole flat on the floor, with the widest flat edge on the floor. Line the bottom end of the centre pole up against a flat edge. 17 Second Shelf Qty 1 Mark 1160mm along the pole. This is where the top of the legs shall be fixed to the pole. 18 Third Shelf Qty 1 4 3 Line the right leg up to the line just marked, making sure the bottom edge of the leg lines up to the bottom of the centre pole. 19 Fourth Shelf Qty 1 Attach the right leg to the pole using a 70mm screw approximatley 30mm from the top of the leg and a 100mm screw beneth this. 20 Fifth Shelf Qty 1 21 2x70mm screws 2x100mm screws Do the same for the left leg. Sixth Shelf Qty 1 22 Step 2 Stand the product up. Centre Pole Line the centre leg up to the line marked in step one. Attach the centre leg again with a 70mm screw 30mm from the top of the leg and a 100mm screw beneth this. 23 Nail Bag 100mm Screw x 6 70mm Screw x 20 60mm Screw x 86 2 2x70mm screws 2x100mm screws Step 5 Step 3 Attach the sixth level of shelving to the leg frame, flush with the back of the shelf legs using 60mm screws. Position a corner leg up against the post so it fits flush against the post. Attach the leg to the pole using a 70mm screw from near the top of the leg into the pole. Do the same for the other corner leg. 1 10 16 22 1 16x60mm screws 2x70mm screws Step 6 Step 4 Attach the fifth level of shelveing together using 70mm screws. Attach the sixth level of shelveing together using 70mm screws. 15 9 10 16 21 22 2x70mm screws 2x70mm screws Step 9 Step 7 Attach the fifth level of shelving to the leg frame, flush with the back of the legs using 60mm screws. Attach the third level of shelving using the same method described in the previous steps. 7 13 19 15 9 21 2x70mm screws 16x60mm screws 16x60mm screws Step 10 Step 8 Attach the second level of shelving using the same method described in the previous steps. Attach the fourth level of shelving using the same method described in the previous steps. 6 12 18 14 8 20 2x70mm screws 16x60mm screws 2x70mm screws 16x60mm screws Step 11 Attach the first level of shelving by again fixing the shelves together using 2 70mm screws. Attach the shelves fush to the back legs using 4 60mm screws. 5 11 17 2x70mm screws 4x60mm screws The Half Pyramid Plant Display can be doubled up to make a full pyramid. Back both half pyramids towards each other, making sure the edges are flush.
© Copyright 2026 Paperzz