I‐95 Corridor Coalition Executive Board & Steering Committee Meeting September 25, 2015 Note to Webcast Participants: The webcast will begin at 9:00 AM (10:00 AM EDT). Please do not put your telephone on “Hold” (especially if it’s a music hold!); muting the phone is appreciated. Telephone Connection: 1‐866‐299‐7945 and enter 6269325# at the prompt. www.i95coalition.org 1 Agenda • Multi‐Agency Collaboration – Recent Initiatives • Highlighted Projects • Recent Accomplishments • Tools for Agency use • Looking Ahead – Projects and Opportunities www.i95coalition.org 2 Multi‐Agency Collaboration: Recent Initiatives • Using Archived Operations Data to Support I‐95 Reconstruction in Philadelphia • Jesse Buerk, Delaware Valley Regional Planning Commission • Amtrak Derailment in Philadelphia • Jesse Buerk, Delaware Valley Regional Planning Commission • Using VPP for Travel Times on “Fortify” Construction Project • Kevin Lacy, North Carolina DOT • RITIS Meeting: Supporting Transportation Coordination & Collaboration during the Papal Visit in Philadelphia, PA • John Allen, University of Maryland/Center for Advanced Transportation Technology • Tolling Interoperability and Enforcement Reciprocity • George Schoener, I‐95 Corridor Coalition www.i95coalition.org 3 • Using Archived Operations Data to Support I‐95 Reconstruction in Philadelphia • Amtrak Derailment in Philadelphia • Jesse Buerk, Delaware Valley Regional Planning Commission I‐95 Corridor Coalition Executive Board September 25, 2015 www.i95coalition.org 4 Using Archived Operations Data to Support I‐95 Reconstruction in Philadelphia Photos source: www.i95coalition.org 5 Background: I‐95 Sector A Reconstruction/Widening Project Approximate area under construction. • Approximately 9 miles in Philadelphia from Center City (I‐676) to far North Philadelphia (Cottman Ave.) • Investment of $2 billion+ federal and state funds • Multiple sections under construction now and for the next 10+ years • Used heavily as interstate, freight, and daily commuter route • DVRPC providing planning assistance to PennDOT • Using archived speed data from the Vehicle Probe Project Suite to help understand conditions, plan, justify, and refine strategies to mitigate congestion www.i95coalition.org 6 I‐95 Project Areas These five projects will widen I‐95 for approximately nine miles and improve five major interchanges Cottman‐Princeton Interchange Levick St. to Bridge St. Reconstruct & widen 1.4 mi, including the Cottman Ave. interchange Reconstruct & widen 2.1 mi, including the Bridge St. interchange Bridge St. to Betsy Ross Bridge Betsy Ross Bridge to Girard Ave. Girard Ave. Interchange Reconstruct & widen about 1 mi, including Reconstruct & widen 1.5 mi, including Reconstruct & widen 3 mi, including the Betsy Ross Bridge interchange reconstruction and reconfiguration of the the Girard Ave. interchange Allegheny/Castor Ave. interchange www.i95coalition.org 7 Using the Vehicle Probe Project Suite Congestion Scan to Understand the Impacts of Construction 2013 & 2014: Increased congestion during Northbound AM & PM peak hours • Construction began late 2011; multiple sections underway starting late 2012 • Graphic instantly communicates spatial and temporal impacts to wide variety of audiences • Great starting point for analysis of changes/issues www.i95coalition.org 8 Using the Vehicle Probe Project Suite Congestion Scan to Understand the Impacts of Incidents Fatal accident at approximately 4:00 AM on 2/18/24 took over 6 hours to clear and caused significant congestion • DVRPC coordinates meetings of I‐95 Incident Management Task Force • Congestion scan communicates severe impact crashes have on congestion www.i95coalition.org 9 Using the Vehicle Probe Project Suite Performance Charts to Justify Project‐supporting Transit Investments to Relieve Congestion on I‐95 • 2013 & 2014: • Southbound AM Peak Travel Time increased 20%; Planning Time increased almost 30% • Northbound PM Peak Travel Time increased 45%; Planning Time increased over 40% Significant increase in weekday peak hour travel and planning times helped justify $41 million flex to SEPTA for purchase of bi‐ level rail cars on parallel Trenton Rail Line www.i95coalition.org • Helped local PennDOT District 6 make the case to PennDOT Central Office and FHWA of need for major transit investments 10 For More Information… Go to… www.95revive.com Coming Soon: Customized travel time comparisons to encourage Transportation Demand Management (TDM) strategies Jesse Buerk Senior Transportation Planner Delaware Valley Regional Planning Commission Vehicle Probe Project Suite User Group Co‐Chair www.i95coalition.org 11 Amtrak Derailment in Philadelphia Photo source: Jesse Buerk (DVRPC) www.i95coalition.org 12 Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line • Amtrak NE Regional Train #188 derailed shortly after 9:00 PM, Tuesday, May 12th, 2015 www.i95coalition.org 13 Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line • Due to accident investigation, tracks were closed, affecting local rail service as well as Amtrak • SEPTA’s Trenton Line was shut down • Wednesday, May 15th • Thursday, May 16th • Friday, May 17th www.i95coalition.org 14 Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line • As a result of SEPTA’s Trenton Line being shut down • Wednesday, May 15th • Thursday, May 16th • Friday, May 17th • Over 1,300 peak transit trips had to be shifted each day (from 8:00‐9:00 AM) www.i95coalition.org 15 Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line • West Trenton Line saw +16% ridership (about 280 extra passengers) • Over 1,000 commuters who normally ride the train between 8:00 – 9:00 AM had to find another way www.i95coalition.org 16 Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line • Significant AM peak travel time increases on I‐95 Wednesday and Thursday • Likely that most Trenton Line riders ended up driving • Still working on analysis of hourly volumes • Preliminary results indicate at least +500 vehicles from 8‐9 AM (Using Vehicle Probe Project Suite Congestion Scan and Performance Charts) www.i95coalition.org 17 Using VPP for Travel Times on “Fortify” Construction Project J. Kevin Lacy, PE CPM State Traffic Engineer North Carolina DOT “Fortify” • • • Rebuilding I-40 in Raleigh area Lane closures and traffic shifts Significant traffic impact on heavily travelled Interstate and surrounding areas 19 Fortify Travel Time Monitoring • Daily report of previous day’s peak period travel times (4 pages of data +3 page appendix ) • Sent to: State Traffic Engineer, Work Zone Traffic Control, Communications Office, construction firms, news agencies, researchers, etc. • First project with this type of reporting • Hope to do this for all large construction projects in future 20 • • • Travel times monitored on 14 “Trips” Trips 1 and 6 are I-40 through the entirety of Wake County Other trips are smaller sections of Trips 1 and 6 Line representing Trip 6 Map Key with addition information on Trips 21 • • Trips 11 and 12 start and end at same points as 1 and 6, but use the alternate route of I-440 Trips 13 and 14 are a small section of US 1 that were added by request 22 Daily Travel Times Delay compared to baseline average 23 • • • Trip 2, if began at 5:10 PM, took approximately 42 minutes to complete, which was 32 minutes longer than the baseline Trip 1, if began at 5:25 PM, took approximately 63 minutes to complete, which was 31 minutes longer than the baseline Baseline calculated based on 8 weeks of weekday, non-holiday data 24 25 Questions? J. Kevin Lacy, PE CPM State Traffic Engineer North Carolina DOT Executive Board Meeting September 25, 2015 Chicago, IL Supporting Transportation Coordination & Collaboration during the Papal Visit in Philadelphia, PA Presented by: John C. Allen ● Faculty Assistant, CATT Lab www.cattlab.umd.edu What is RITIS Meeting? • It’s a virtual meeting platform ‒ Anytime/anywhere ‒ PC, laptop or mobile device, such as iPad® • It’s collaborative decision‐making ‒ ‒ ‒ ‒ Leverage multiple layers of data Share documents Discuss ideas & recommendations Conduct attendee polling • It’s situational awareness ‒ ‒ ‒ ‒ Weather (radar, alerts, road surface condition) Events/Incidents (construction, crashes, etc.) Probe speed data/DMS messages Evacuation support • It’s multi‐faceted ‒ Multi‐agency/multi‐user ‒ Plan, respond to, follow‐up on ‒ Extreme weather, special events, incident management • It’s fast and easy ‒ ‒ ‒ ‒ Simple set‐up of meetings, creating agendas One‐click e‐links to send to attendees Intuitive & user‐friendly Instant follow‐up email with an automatically generated Meeting Log (MOR) 2 Why was it Chosen for the Papal Visit? • It had most of the features & functions PennDOT was looking for… ‒ More on that in a minute • There was an easy‐to‐use Quick Reference Guide ‒ ‒ ‒ ‒ ‒ Graphically‐oriented, little text Easy to read & understand Covers all the bases For both Host and Participant Gets folks up to speed quickly • Unparalleled Support ‒ 100+ professional engineers, developers, researchers, and students at the CATT Lab ‒ Ultra‐responsive to customer’s needs • Nothing else came close! ‒ Not Adobe Connect® ‒ Not MS SharePoint® 3 How Will it be Used? • Clickable links for sharing Situation Reports (Primary Use) ‒ Additional functionality recently deployed: Added the ability to upload pdf documents New “clickable links” functionality for SIT Report access (download and viewing) ‒ Upload multi‐agency report compilations every hour, during the entire event ‒ These features will benefit all other users of RITIS Meeting • Situational Awareness Layers (Secondary Use) ‒ Probe Speed Data ‒ Weather Radar ‒ Papal Visit Routes (added just for this event): Can quickly look at roadway conditions around the Safety Zone for any necessary Traffic/Incident Management Keep an eye on Alternative Routes operations Keep an eye on the weather • Meeting Notes/Polling (Low to Moderate Use) ‒ Document the management of, decision‐making for the event ‒ Poll meeting participants as necessary (e.g.; road closure timeline changes due to extreme weather) 4 So, Let’s See RITIS Meeting in Action! 5 • Tolling Interoperability & Enforcement Reciprocity • George Schoener, I‐95 Corridor Coalition www.i95coalition.org 28 Activities and Accomplishments (Highlights) June – September 2015 Facilitating Communications Across Borders & Modes • Regional Integrated Transportation Information System (RITIS) – Demo • Collaborative Decision Tool • Papal Visit Support • Funding Working Group • I‐95 Corridor Coalition Website Enhancements • TrafficView • Vehicle Probe Project Suite User Group Forum • ITS Calendar • Papal Visit Information www.i95coalition.org 29 Activities and Accomplishments (Highlights) June – September 2015 Developing Advanced/Connecting Technologies, and Enhancing Operations & Planning • Vehicle Probe Project & Suite • Ongoing Data Validation • Webcasts for Enhancement Updates and User Exchange • Tolling Interoperability Conference Calls • Bus Rapid Transit Workshop • USDOT & New York State DOT; October 21‐22 • Truck Parking Pilot • Two sites: Virginia and Maryland www.i95coalition.org 30 Activities and Accomplishments (Highlights) June – September 2015 Developing Advanced/Connecting Technologies, and Enhancing Operations & Planning (cont’d) • Member Support & Peer‐to‐Peer Exchange: • • • • Regional HOGs Meeting CIM Presentation at ITS Carolinas Intermodal Committee Chairs Monthly Calls Travel Information Services Committee Chairs Calls (and planning for meeting in November) Training for Consistent & Progressive Practices • Freight Academy 2015 – Capstone Projects • FHWA/SHRP2 Training Workshop – Charleston, SC (July) • Operations Academy 2015 • November 3‐13 • Representing Coalition States: PA, NJ, NC, NH, ME, MD, MA, FL, VA www.i95coalition.org 31 • New Tools for I‐95 Agencies • Michael Pack, University of Maryland Center for Advanced Transportation Technology www.i95coalition.org 32 • Looking Ahead • Positioned for Authorization • 2016 Coalition Conference • Executive Director Search www.i95coalition.org 33 Positioned for Authorization Surface Transportation Bill – Potential Opportunities: • Freight Corridors • Alternative Funding Sources • Mileage Based User Fees • Tolling • Major Projects Program with Multistate Groups Eligibility • Electric Vehicle and Natural Gas Fueling Corridors • MAP‐21 Policy Expansion • Truck Parking Program • Performance Measures Planning & Data www.i95coalition.org 34 2015 Coalition Conference: Significant Events Coordination Proposed Follow‐up: Conduct a series of Webinars and Coalition Committee Meeting Discussions about Conference Outcomes, with potential topics being: • Getting on the Same Page – coordinating approvals and obtaining decisions (internal administration and external transmission); for example, bridge/highway/facility closures, public announcements, information gaps, multimodal coordination, toll waivers, etc. • Advancing Coordinated and Prepared Operations and Response – streamlining communications and agreements (e.g., trucking prohibitions and allowances), scheduling resources, coordinating traffic incident management response and responders, flood/evacuation plans and routes, FEMA coordination, GIS for disaster response, etc. • Coordinating Regional Communications to the Traveling Public – social media, coordinated ITS messaging, V2V and V2I communications, auto vs. truck messages, transit information, etc. • Connected‐Autonomous Vehicles and Significant Events – vulnerable security points in vehicles and systems. • Disaster Recovery – private sector involvement (e.g., electrical restoration), expediting movement of repair vehicles, resource planning, coordination/involvement with disaster relief agencies (e.g., American Red Cross). www.i95coalition.org 35 2016 Coalition Conference: Connected and Autonomous Vehicles – Public Agency & Multistate Perspective • Examine issues, with Connected and Autonomous Vehicles, that haven’t been fully explored • Focus on regional issues and solutions, and safety • Draft Topics: • • • • • Connected and Autonomous Vehicles 101 Interoperability and Standards Safety and Security (including tracking and hacking issues) Operations and Emergency Response (TIM in a mixed vehicle world) Practical Applications (past/potential events – weather, planned, unplanned) • Current Status: • Draft agenda complete • Planning Committee members invited to participate (first meeting early Oct) • Conference date May/June 2016 www.i95coalition.org 36 Executive Director Search www.i95coalition.org 37 Next I‐95CC Executive Board Meeting • May/Jun 2016 • Washington, DC www.i95coalition.org 38 Thank You! www.i95coalition.org 39
© Copyright 2026 Paperzz