Agenda
• Multi‐Agency Collaboration – Recent Initiatives
• Highlighted Projects
• Recent Accomplishments
• Tools for Agency use
• Looking Ahead – Projects and Opportunities
www.i95coalition.org
2
Multi‐Agency Collaboration:
Recent Initiatives
• Using Archived Operations Data to Support I‐95 Reconstruction in Philadelphia
• Jesse Buerk, Delaware Valley Regional Planning Commission
• Amtrak Derailment in Philadelphia
• Jesse Buerk, Delaware Valley Regional Planning Commission
• Using VPP for Travel Times on “Fortify” Construction Project
• Kevin Lacy, North Carolina DOT
• RITIS Meeting: Supporting Transportation Coordination & Collaboration during the Papal Visit in Philadelphia, PA
• John Allen, University of Maryland/Center for Advanced Transportation Technology
• Tolling Interoperability and Enforcement Reciprocity
• George Schoener, I‐95 Corridor Coalition
www.i95coalition.org
3
• Using Archived Operations Data to Support I‐95 Reconstruction in Philadelphia
• Amtrak Derailment in Philadelphia
• Jesse Buerk, Delaware Valley Regional Planning Commission
I‐95 Corridor Coalition Executive Board
September 25, 2015
www.i95coalition.org
4
Using Archived Operations Data to Support I‐95 Reconstruction in Philadelphia
Photos source:
www.i95coalition.org
5
Background: I‐95 Sector A Reconstruction/Widening Project
Approximate area under construction.
• Approximately 9 miles in Philadelphia from Center City (I‐676) to far North Philadelphia (Cottman Ave.) • Investment of $2 billion+ federal and state funds
• Multiple sections under construction now and for the next 10+ years
• Used heavily as interstate, freight, and daily commuter route
• DVRPC providing planning assistance to PennDOT
• Using archived speed data from the Vehicle Probe Project Suite to help understand conditions, plan, justify, and refine strategies to mitigate congestion
www.i95coalition.org
6
I‐95 Project Areas
These five projects will widen I‐95 for approximately nine miles and improve five major interchanges
Cottman‐Princeton Interchange Levick St. to Bridge St.
Reconstruct & widen 1.4 mi, including the Cottman Ave. interchange
Reconstruct & widen 2.1 mi, including the Bridge St. interchange
Bridge St. to Betsy Ross Bridge
Betsy Ross Bridge to Girard Ave.
Girard Ave. Interchange
Reconstruct & widen about 1 mi, including Reconstruct & widen 1.5 mi, including Reconstruct & widen 3 mi, including the Betsy Ross Bridge interchange
reconstruction and reconfiguration of the the Girard Ave. interchange
Allegheny/Castor Ave. interchange
www.i95coalition.org
7
Using the Vehicle Probe Project Suite Congestion Scan to Understand the Impacts of Construction
2013 & 2014: Increased congestion during Northbound AM & PM peak hours
• Construction began late 2011; multiple sections underway starting late 2012
• Graphic instantly communicates spatial and temporal impacts to wide variety of audiences
• Great starting point for analysis of changes/issues
www.i95coalition.org
8
Using the Vehicle Probe Project Suite Congestion Scan to Understand the Impacts of Incidents
Fatal accident at approximately 4:00 AM on 2/18/24 took over 6 hours to clear and caused significant congestion • DVRPC coordinates meetings of I‐95 Incident Management Task Force
• Congestion scan communicates severe impact crashes have on congestion
www.i95coalition.org
9
Using the Vehicle Probe Project Suite Performance Charts to Justify Project‐supporting Transit Investments to Relieve Congestion on I‐95
• 2013 & 2014: • Southbound AM Peak Travel Time increased 20%; Planning Time increased almost 30%
• Northbound PM Peak Travel Time increased 45%; Planning Time increased over 40%
Significant increase in weekday peak hour travel and planning times helped justify $41 million flex to SEPTA for purchase of bi‐
level rail cars on parallel Trenton Rail Line
www.i95coalition.org
• Helped local PennDOT
District 6 make the case to PennDOT Central Office and FHWA of need for major transit investments
10
For More Information…
Go to…
www.95revive.com
Coming Soon:
Customized travel time comparisons to encourage Transportation Demand Management (TDM) strategies
Jesse Buerk
Senior Transportation Planner Delaware Valley Regional Planning Commission
Vehicle Probe Project Suite User Group Co‐Chair
www.i95coalition.org
11
Amtrak Derailment in Philadelphia
Photo source:
Jesse Buerk (DVRPC)
www.i95coalition.org
12
Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line
• Amtrak NE Regional Train #188 derailed shortly after 9:00 PM, Tuesday, May 12th, 2015
www.i95coalition.org
13
Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line
• Due to accident investigation, tracks were closed, affecting local rail service as well as Amtrak
• SEPTA’s Trenton Line was shut down
• Wednesday, May 15th
• Thursday, May 16th
• Friday, May 17th
www.i95coalition.org
14
Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line
• As a result of SEPTA’s Trenton Line being shut down
• Wednesday, May 15th
• Thursday, May 16th
• Friday, May 17th
• Over 1,300 peak transit trips had to be shifted each day (from 8:00‐9:00 AM)
www.i95coalition.org
15
Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line
• West Trenton Line saw +16% ridership (about 280 extra passengers)
• Over 1,000 commuters who normally ride the train between 8:00 –
9:00 AM had to find another way
www.i95coalition.org
16
Impact of the Amtrak Derailment & Suspension of SEPTA’s Trenton Line
• Significant AM peak travel time increases on I‐95 Wednesday and Thursday • Likely that most Trenton Line riders ended up driving
• Still working on analysis of hourly volumes
• Preliminary results indicate at least +500 vehicles from 8‐9 AM
(Using Vehicle Probe Project Suite Congestion Scan and Performance Charts)
www.i95coalition.org
17
Using VPP for Travel Times on
“Fortify” Construction Project
J. Kevin Lacy, PE CPM
State Traffic Engineer
North Carolina DOT
“Fortify”
•
•
•
Rebuilding I-40
in Raleigh area
Lane closures
and traffic shifts
Significant traffic
impact on
heavily travelled
Interstate and
surrounding
areas
19
Fortify Travel Time Monitoring
• Daily report of previous day’s peak period travel times (4
pages of data +3 page appendix )
• Sent to: State Traffic Engineer, Work Zone Traffic
Control, Communications Office, construction firms,
news agencies, researchers, etc.
• First project with this type of reporting
• Hope to do this for all large construction projects in
future
20
•
•
•
Travel times monitored on 14 “Trips”
Trips 1 and 6 are I-40 through the
entirety of Wake County
Other trips are smaller sections of Trips
1 and 6
Line representing Trip 6
Map Key with addition information on Trips
21
•
•
Trips 11 and 12 start and end at
same points as 1 and 6, but use
the alternate route of I-440
Trips 13 and 14 are a small
section of US 1 that were added
by request
22
Daily Travel Times
Delay compared to baseline average
23
•
•
•
Trip 2, if began at 5:10 PM, took approximately 42 minutes to complete,
which was 32 minutes longer than the baseline
Trip 1, if began at 5:25 PM, took approximately 63 minutes to complete,
which was 31 minutes longer than the baseline
Baseline calculated based on 8 weeks of weekday, non-holiday data
24
25
Questions?
J. Kevin Lacy, PE CPM
State Traffic Engineer
North Carolina DOT
Executive Board Meeting
September 25, 2015
Chicago, IL
Supporting Transportation Coordination & Collaboration during the Papal Visit in Philadelphia, PA
Presented by: John C. Allen ● Faculty Assistant, CATT Lab www.cattlab.umd.edu
What is RITIS Meeting?
• It’s a virtual meeting platform
‒ Anytime/anywhere
‒ PC, laptop or mobile device, such as iPad®
• It’s collaborative decision‐making
‒
‒
‒
‒
Leverage multiple layers of data Share documents
Discuss ideas & recommendations
Conduct attendee polling
• It’s situational awareness
‒
‒
‒
‒
Weather (radar, alerts, road surface condition)
Events/Incidents (construction, crashes, etc.)
Probe speed data/DMS messages
Evacuation support
• It’s multi‐faceted
‒ Multi‐agency/multi‐user
‒ Plan, respond to, follow‐up on
‒ Extreme weather, special events, incident management
• It’s fast and easy
‒
‒
‒
‒
Simple set‐up of meetings, creating agendas
One‐click e‐links to send to attendees
Intuitive & user‐friendly
Instant follow‐up email with an automatically generated Meeting Log (MOR)
2
Why was it Chosen for the Papal Visit?
• It had most of the features & functions PennDOT was looking for…
‒ More on that in a minute
• There was an easy‐to‐use Quick Reference Guide
‒
‒
‒
‒
‒
Graphically‐oriented, little text Easy to read & understand
Covers all the bases
For both Host and Participant Gets folks up to speed quickly
• Unparalleled Support
‒ 100+ professional engineers, developers, researchers, and students at the CATT Lab
‒ Ultra‐responsive to customer’s needs
• Nothing else came close!
‒ Not Adobe Connect®
‒ Not MS SharePoint®
3
How Will it be Used?
• Clickable links for sharing Situation Reports (Primary Use)
‒ Additional functionality recently deployed:


Added the ability to upload pdf documents
New “clickable links” functionality for SIT Report access (download and viewing)
‒ Upload multi‐agency report compilations every hour, during the entire event
‒ These features will benefit all other users of RITIS Meeting
• Situational Awareness Layers (Secondary Use)
‒ Probe Speed Data
‒ Weather Radar
‒ Papal Visit Routes (added just for this event):



Can quickly look at roadway conditions around the Safety Zone for any necessary Traffic/Incident Management
Keep an eye on Alternative Routes operations
Keep an eye on the weather
• Meeting Notes/Polling (Low to Moderate Use)
‒ Document the management of, decision‐making for the event
‒ Poll meeting participants as necessary (e.g.; road closure timeline changes due to extreme weather)
4
So, Let’s See RITIS Meeting in Action!
5
• Tolling Interoperability & Enforcement Reciprocity
• George Schoener, I‐95 Corridor Coalition
www.i95coalition.org
28
Activities and Accomplishments (Highlights)
June – September 2015
Facilitating Communications Across Borders & Modes
• Regional Integrated Transportation Information System (RITIS) – Demo
• Collaborative Decision Tool
• Papal Visit Support
• Funding Working Group
• I‐95 Corridor Coalition Website Enhancements
• TrafficView
• Vehicle Probe Project Suite User Group Forum
• ITS Calendar
• Papal Visit Information
www.i95coalition.org
29
Activities and Accomplishments (Highlights)
June – September 2015
Developing Advanced/Connecting Technologies, and Enhancing Operations & Planning
• Vehicle Probe Project & Suite
• Ongoing Data Validation
• Webcasts for Enhancement Updates and User Exchange
• Tolling Interoperability Conference Calls
• Bus Rapid Transit Workshop
• USDOT & New York State DOT; October 21‐22
• Truck Parking Pilot • Two sites: Virginia and Maryland
www.i95coalition.org
30
Activities and Accomplishments (Highlights)
June – September 2015
Developing Advanced/Connecting Technologies, and Enhancing Operations & Planning (cont’d)
• Member Support & Peer‐to‐Peer Exchange:
•
•
•
•
Regional HOGs Meeting
CIM Presentation at ITS Carolinas
Intermodal Committee Chairs Monthly Calls
Travel Information Services Committee Chairs Calls (and planning for meeting in November)
Training for Consistent & Progressive Practices
• Freight Academy 2015 – Capstone Projects
• FHWA/SHRP2 Training Workshop – Charleston, SC (July)
• Operations Academy 2015 • November 3‐13
• Representing Coalition States: PA, NJ, NC, NH, ME, MD, MA, FL, VA
www.i95coalition.org
31
• New Tools for I‐95 Agencies
• Michael Pack, University of Maryland Center for Advanced Transportation Technology
www.i95coalition.org
32
• Looking Ahead
• Positioned for Authorization
• 2016 Coalition Conference
• Executive Director Search
www.i95coalition.org
33
Positioned for Authorization
Surface Transportation Bill – Potential Opportunities:
• Freight Corridors
• Alternative Funding Sources
• Mileage Based User Fees
• Tolling
• Major Projects Program with Multistate Groups Eligibility
• Electric Vehicle and Natural Gas Fueling Corridors
• MAP‐21 Policy Expansion
• Truck Parking Program
• Performance Measures Planning & Data
www.i95coalition.org
34
2015 Coalition Conference: Significant Events Coordination
Proposed Follow‐up: Conduct a series of Webinars and Coalition Committee Meeting Discussions about Conference Outcomes, with potential topics being:
• Getting on the Same Page – coordinating approvals and obtaining decisions (internal administration and external transmission); for example, bridge/highway/facility closures, public announcements, information gaps, multimodal coordination, toll waivers, etc.
• Advancing Coordinated and Prepared Operations and Response – streamlining communications and agreements (e.g., trucking prohibitions and allowances), scheduling resources, coordinating traffic incident management response and responders, flood/evacuation plans and routes, FEMA coordination, GIS for disaster response, etc. • Coordinating Regional Communications to the Traveling Public – social media, coordinated ITS messaging, V2V and V2I communications, auto vs. truck messages, transit information, etc.
• Connected‐Autonomous Vehicles and Significant Events – vulnerable security points in vehicles and systems.
• Disaster Recovery – private sector involvement (e.g., electrical restoration), expediting movement of repair vehicles, resource planning, coordination/involvement with disaster relief agencies (e.g., American Red Cross).
www.i95coalition.org
35
2016 Coalition Conference:
Connected and Autonomous Vehicles –
Public Agency & Multistate Perspective
• Examine issues, with Connected and Autonomous Vehicles, that haven’t been fully explored
• Focus on regional issues and solutions, and safety
• Draft Topics:
•
•
•
•
•
Connected and Autonomous Vehicles 101
Interoperability and Standards
Safety and Security (including tracking and hacking issues)
Operations and Emergency Response (TIM in a mixed vehicle world)
Practical Applications (past/potential events – weather, planned, unplanned)
• Current Status:
• Draft agenda complete
• Planning Committee members invited to participate (first meeting early Oct)
• Conference date May/June 2016
www.i95coalition.org
36
Executive Director Search
www.i95coalition.org
37
Next I‐95CC Executive Board Meeting
• May/Jun 2016
• Washington, DC www.i95coalition.org
38