GENERAL BUILDING REQUIREMENTS, RULES, AND RESTRICTIONS 1. REQUIREMENTS AND RELATED INFORMATION NEEDED WHEN SUBMITTING PLANS FOR APPROVAL OF INITIAL BUILD OR EXTENSIVE EXTERNAL REMODEL. a. APPROVAL PROCESS. The ARC has 30 days to review plans once the committee has received all the required information as stated below. The ARC will notify the owner in writing once plans have been approved. If no action is taken by the ARC within 30 days after plans and required information is submitted, the owner may proceed to build without approval. (Page 4, Sec. 7, CKP covenants) b. PLANS. A complete set of Architectural plans showing rendering of house, floor plan with stated square footage, elevations of front, rear, and sides, roof plan showing pitch of roof, foundation plan, etc., shall be submitted to the Architectural Review Committee (ARC) for its records. (Page 4, Sec. 7, CKP covenants) NOTE: ANY MODIFICATIONS TO PLANS AFTER APPROVAL MUST BE RESUBMITTED FOR APPROVAL. i. SITE PLANS. Site plans will be included in the plans provided to the ARC for approval. They should show the location/orientation of the house on the lot along with setbacks. (Page 4, Sec. 7, CKP covenants) ii. SETBACKS. All structures must be at least 15’ from the side property line of any lot except that they shall be at least 20’ from the side property line abutting a street. All structures must be at least 50’ from any road. All structures must be at least 50’ from the 813’ high pool water line. These restrictions may be reduced or increased if, in the sole estimation of the ARC, strict compliance would cause a hardship to a lot owner or adjacent lot owner relative to lake view, topography or septic approvals. Setbacks shall meet or exceed Loudon County subdivision regulations. (Page 3, Sec. 3, CKP covenants) c. SITE SURVEY. Effective immediately, a property site survey must be completed and submitted to the ARC when submitting Architectural plans. Building plans will not be approved unless/until a current survey is submitted. (HOA Board Meeting Minutes 3/01/2016) d. BUILDER APPLICATION. An Owner/Builder Application is required from all Builders/Owner Builders and is provided by the ARC. The application may also be downloaded at www.conkinnonpointe.org. (CKP Architectural Standards) e. CONSTRUCTION RESPONSIBILITIES. The construction contractor is responsible for installing silt fencing along roadways and adjoining property lines at the commencement of construction. Builder is also responsible for maintaining a clean and orderly job site and ensuring the streets are kept clean at the end of each work day. (CKP Architectural Standards) f. BUILDING/LANDSCAPING DEPOSIT – INITIAL BUILD. Effective July 1, 2009, a building/landscaping deposit of $2,500.00 is required as part of the approval process. The deposit is to insure that streets/curbing is kept clean during the construction process and that all foundation plantings and grass is in place before it is refunded. (HOA Board Meeting Minutes 4/09/09) g. BUILDING/LANDSCAPING DEPOSIT – EXTENSIVE EXTERNAL REMODEL. Effective June 1, 2016, a building/landscaping deposit of $1000.00 is required as part of the approval process. The deposit is to insure that streets/curbing is kept clean during the construction process and that all foundation plantings and grass is repaired/replaced before it is refunded. (HOA Board Meeting Minutes 3/01/2016) “Extensive External Remodel” is defined as a renovation/remodel project encompassing ONE OR MORE of the following: i. ii. iii. iv. A projected cost of $100,000.00 or greater; A projected duration of 30 days or longer; An extensive exterior modification; and/or A change to the footprint of the existing home (e.g., addition). h. SQUARE FOOTAGE REQUIREMENTS. Each single-family dwelling shall have an enclosed, heated living area (exclusive of open porches, garages, and other unheated spaces) not less than TWO THOUSAND FOUR HUNDRED (2,400) square feet. Multi-story homes shall be a minimum of TWO THOUSAND (2,000) heated square feet on the main living level. The design, location, and building construction of all improvements (fences, walls, pools, outbuilding, etc.) must be approved by the ARC. (Page 3, Sec. 2, CKP covenants, along with revision by CKP Board of Directors letter, dated July 13, 2000) i. BUILDING MATERIAL. Siding material, where exterior is not either brick or stone, shall consist of either cedar or HardiPlank. Vinyl is limited to soffits only and not allowed for use as siding. Exposed exterior walls composed of the following materials shall be prohibited from ConKinnon Pointe Subdivision: concrete block, imitation asphalt brick siding, imitation asphalt stone siding and tar paper. (CKP Architectural Standards and Page 5, Sec. 12, CKP covenants) j. WINDOWS. Only wood windows are acceptable. Wood windows with exterior cladding consisting of vinyl or metal are acceptable. (CKP Architectural Standards) k. GARAGES. The garage door must not face the street on which the house is located unless on a corner lot. (revision by CKP Board of Directors letter dated July 13, 2000) l. ROOF. Roof must have a pitch of no less than 12.8. Boat dock and outbuildings roof material must match that which is on the house. (CKP Architectural Standards) m. AESTHETIC. The ARC refusal or approval of plans may be based upon purely aesthetic considerations, which in its sole discretion the ARC shall deem sufficient, but approval shall not unreasonably be withheld. (Page 4, Sec. 7, CKP covenants) n. COLOR. Falls under Aesthetic. 2. RULES AND RESTRICTIONS. a. RESIDENCE. Appearance of front yard landscaping shall be maintained, and free of excessive weeds to a degree not to distract from the rest of the neighborhood. Lawn clippings are not to be left in the street after mowing. (CKP Architectural Standards) i. All design and material for residence, boathouses, private docks and shore protection shall be subject to Architectural review and approval by the ARC. (Page 4, Sec. 10, CKP covenants) ii. Any dwelling or boathouse constructed upon a lot must be completed within one (1) year subsequent to commencement of construction. (Page 4, Sec. 9, CKP covenants) iii. New owners of waterfront lots with an existing permit for erosion control, a boat house, swim dock, or other structure, must transfer ownership of the permit through TVA within 60 days of the transfer of the title. (TVA, Section 26a, Subpart A, Subsection 1304.10) iv. Bottled gas containers and oil tanks shall be screened from public view; such containers capable of holding more than fifty (50) pounds or fifty (50) gallons of fuel shall be buried. (Page 5, Sec. 14, CKP covenants) v. AC units shall not be visible from view from all roads. Either planting or decorative fencing shall screen said AC unit. (CKP Architectural Standard) vi. Trash, garbage, or other waste shall not be kept, except in sanitary containers screened from view from all roads and all other lots. (Page 5, Sec. 15, CKP covenants) vii. There shall be no above-ground swimming pools, unless approved by the ARC. (Page 5, Sec. 14, CKP covenants) viii. Except within the building site or within 20 feet of the main dwelling, no HARDWOOD trees of any kind in excess of 6 inches in diameter at ground level may be removed from any lot without prior approval of the ARC. (Page 6, Sec. 21, CKP covenants) ix. MAILBOX. CKP approved mailboxes may be purchased from the Christmas Lumber Company (10519 Kingston Pike, Knoxville; 865-6932571). The Mailbox model number/description is “Imperial #311-6, green with a paper box below.” Mailbox units or replacement parts may also be ordered through Imperial Mailbox Systems at www.imperialmailbox.com. 1. NOTE: It may take up to three (3) weeks to receive mailbox orders in the approved color. 2. Color changes/repairs should be made using Krylon Hunter Green Spray Paint. b. VIOLATIONS/NUISANCE ACTIVITIES. All owners shall be held responsible for the acts of their builders, employees, subcontractors, suppliers, and other persons or parties involved in construction or alteration of a structure. Usage of water and electricity from adjoining properties is not permitted, nor may any vehicles be driven upon, materials stored upon, or in any other way use neighbor’s property before, during, or after any building project expressed written approval by the owner of adjoining lot and a copy of this written approval filed with the HOA. Street must be diligently kept free of mud, gravel/rocks, and other debris at all times during the construction process. All temporary access gravel driveways on any lot must be maintained. The construction site shall be kept free of debris at the end of each day. (CKP Architectural Standards) I/We have read and fully understand the General Building Requirements, Rules and Restrictions as stated and outlined above and acknowledge a receipt of same. I/We acknowledge that the intent of this document is to highlight The “General Building Guidelines of ConKinnon Pointe Subdivision,” and is not meant to replace the Covenants of ConKinnon Pointe Subdivision at any time. I/We further acknowledge and understand than any exceptions requested will be reviewed by the ARC and the ConKinnon Pointe Board of Directors before any variances or exceptions will be granted. Signed:_________________________________________________Date:__________________ (Owner/s) Signed:_________________________________________________Date:__________________ (Builder/s)
© Copyright 2026 Paperzz