Everest Data Centres Unit 2, Smallmead Road, Reading, RG2 0QS e [email protected] w www.everestdc.com t +44 (0)118 3800 599 READING LINK33 DATA CENTRE Link33 (Reading) includes four data halls totalling over 1,000 racks of data centre white space, with an average power density of 1.5 kW per square metre. Tier 4 aligned specifications delivering 2N power distribution with 2(N+1) resilient components to achieve the highest uptime for mission-critical environments. LOCATION BY RAIL • Jct 11 M4 < 2 miles • Reading Station < 3 miles • London Heathrow 28 miles • Central London 42 miles • London Paddington 31 minutes FACILITY AIR CONDITIONING & COOLING • 66,180 sq ft including plant area • • 24/7/365 manned NOC • • 4 dedicated data halls • Halls available in Tier 3+ or Tier 4 specification • N+1 CRAC air conditioning units per data hall • Standard Racks – 48U • N+1 External chillers and heat rejection • N+1 Chilled water ring mains • N+1 Hydraulic pumps POWER • All cooling is dual fed with power (A & B) • 6.5 MVa power supply • High efficiency G4 particulate filtration • 11kV grid connection with dual diverse feeds • Private on site HV network • 2N (A&B) HV-LV transformers FIRE/ENVIRONMENTAL • 2N (A&B) switchgear • Fully addressable zoned detection system 2(N+1) (A&B) UPS with 10 minute autonomy • Inert gas IG55 fire suppressant 2N (A&B) distribution to racks • All chilled water kept away from data floors N+1 standby diesel generators with 120 hours run time at full load and • Leak detection system priority fuel resupply contract • BMS monitoring all critical services • • • Hot aisle containment via ‘chimney rack’ design Full recirculation air conditioning avoiding air quality issues with external ‘fresh’ air systems CONNECTIVITY CLIENT SERVICES • Carrier neutral site • Bookable meeting rooms • In-house IP transit mix available • Goods-in team • Carriers on site/with ducts to site: • On-site build room –– BT • Client portal with extensive functionality: –– Colt –– Book remote hands –– KCom –– Arrange permanent/temporary access –– Level3 –– Review access logs –– Openreach –– View bandwidth and power usage –– SSE Telecoms –– Telia –– Virgin Media GREEN CREDENTIALS –– Vodafone • Design PUE < 1.2 Diverse fibre entry points to site • Using 100% Renewable Energy • Exempt from Climate Charge Levy • Designed to BREEAM ‘Excellent’ SECURITY • EC Fans on CRACs and chillers for part-load efficiency • 24/7/365 on-site security team • Client server packaging recycling facilities • Secure perimeter fence • Internal fencing inside perimeter for plant areas • HD digital CCTV with 90 day retention • Full access control with audit trail •
© Copyright 2026 Paperzz