READING LINK33 DATA CENTRE

Everest Data Centres
Unit 2, Smallmead Road, Reading, RG2 0QS
e [email protected] w www.everestdc.com
t +44 (0)118 3800 599
READING
LINK33 DATA CENTRE
Link33 (Reading) includes four data halls totalling over 1,000 racks
of data centre white space, with an average power density of 1.5 kW
per square metre. Tier 4 aligned specifications delivering 2N power
distribution with 2(N+1) resilient components to achieve the highest
uptime for mission-critical environments.
LOCATION
BY RAIL
•
Jct 11 M4
< 2 miles
•
Reading Station
< 3 miles
•
London Heathrow
28 miles
•
Central London
42 miles
•
London Paddington 31 minutes
FACILITY
AIR CONDITIONING & COOLING
•
66,180 sq ft including plant area
•
•
24/7/365 manned NOC
•
•
4 dedicated data halls
•
Halls available in Tier 3+ or Tier 4 specification
•
N+1 CRAC air conditioning units per data hall
•
Standard Racks – 48U
•
N+1 External chillers and heat rejection
•
N+1 Chilled water ring mains
•
N+1 Hydraulic pumps
POWER
•
All cooling is dual fed with power (A & B)
•
6.5 MVa power supply
•
High efficiency G4 particulate filtration
•
11kV grid connection with dual diverse feeds
•
Private on site HV network
•
2N (A&B) HV-LV transformers
FIRE/ENVIRONMENTAL
•
2N (A&B) switchgear
•
Fully addressable zoned detection system
2(N+1) (A&B) UPS with 10 minute autonomy
•
Inert gas IG55 fire suppressant
2N (A&B) distribution to racks
•
All chilled water kept away from data floors
N+1 standby diesel generators with 120 hours run time at full load and
•
Leak detection system
priority fuel resupply contract
•
BMS monitoring all critical services
•
•
•
Hot aisle containment via ‘chimney rack’ design
Full recirculation air conditioning avoiding air quality issues with external
‘fresh’ air systems
CONNECTIVITY
CLIENT SERVICES
•
Carrier neutral site
•
Bookable meeting rooms
•
In-house IP transit mix available
•
Goods-in team
•
Carriers on site/with ducts to site:
•
On-site build room
–– BT
•
Client portal with extensive functionality:
–– Colt
–– Book remote hands
–– KCom
–– Arrange permanent/temporary access
–– Level3
–– Review access logs
–– Openreach
–– View bandwidth and power usage
–– SSE Telecoms
–– Telia
–– Virgin Media
GREEN CREDENTIALS
–– Vodafone
•
Design PUE < 1.2
Diverse fibre entry points to site
•
Using 100% Renewable Energy
•
Exempt from Climate Charge Levy
•
Designed to BREEAM ‘Excellent’
SECURITY
•
EC Fans on CRACs and chillers for part-load efficiency
•
24/7/365 on-site security team
•
Client server packaging recycling facilities
•
Secure perimeter fence
•
Internal fencing inside perimeter for plant areas
•
HD digital CCTV with 90 day retention
•
Full access control with audit trail
•