A1 B1 B2 B3 C1 C2 A2 - North West Coast Connections

NWCC ROUTE LEGEND
A69
A
Carlisle 6 9
EN
SP
SP
EN
ZV
9
A5
Maryport
BD
Penrith
Workington
A66
Egremont
Windermere
Kendal
A5
9
5
90
A5
Solway
Coast
AONB
Millom
Kirkby
Stephen
M6
Proposed Harker 400kV
Substation Extension
FW
6
A6
Keswick
Whitehaven
Upper Solway Flats
and Marshes Ramsar and
SPA Solway Firth SAC
5
Sedbergh
Kirkby
Lonsdale
Ulverston
Barrow-In-Furness
XB
Carnforth
Morecambe
Heysham
BV
Legend
DS
S
Existing Infrastructure
G
Frontiers of the
Roman Empire
(Hadrian's Wall)
Existing 400kV Overhead Line
Existing 275kV Overhead Line
Existing 400kV Substation
Existing 132kV Overhead Line
Existing 132kV Underground Cable
Frontiers of the
Roman Empire
(Hadrian's Wall)
C2
Existing 132kV Substation
Proposed Infrastructure
Proposed ZV Diversion Overhead Line
FT
S
Proposed 400kV Overhead Line
River
Eden SAC
C1
Proposed Substation
River
Eden SAC
Proposed Moorside Substation (Not Part of NWCC Project)
DS
Solway
Coast
AONB
Railway Compound
Helicopter Operating Base
Site Construction Compound
B3
Moorside Site Boundary
Geographic Subsection Break
Environmental Constraints
National Park
Area of Outstanding Natural Beauty (AONB)
B2
Works to
Existing
Siddick 132kV
Substation
S
River Derwent and
Bassenthwaite
Lake SAC
ZX
Ramsar
Special Area of Conservation (SAC)
LAKE DISTRICT
NATIONAL PARK
Special Protection Area (SPA)
World Heritage Site (Core Zone)
Proposed Stainburn
132kV Substation
Extension
World Heritage Site (Buffer Zone)
YORKSHIRE DALES
NATIONAL PARK
Proposed Stainburn
400kV Switchgear
Substation
FP
River
Eden SAC
B1
Frontiers of the
Roman Empire
(Hadrian's Wall)
NOTES
Data Source:
Natural England - National Park, AONB, Ramsar, SAC, SPA Boundaries.
English Heritage - World Heritage Site Boundary.
Helicopter Operating Bases are assessed in Appendix 4B.
S
River Derwent and
Bassenthwaite
Lake SAC
A2
G
River
Ehen SAC
Master Scheme No:
Sub-Scheme No:
30029
Site:
16303780
NWCC
Scheme Name:
NORTH WEST COAST CONNECTIONS
AS
Document Title:
Proposed Moorside
400/132kV Substation (Not
Part of NWCC Project Exact Location to be
Confirmed by NuGen)
A1
FIGURE 4.2.1
PRINCIPAL ENVIRONMENTAL CONSTRAINTS
NORTH OVERVIEW
Created By:
D.FULLER
Development Eng:
Date:
Checked By:
OCTOBER
2016
Document Type:
P.BYRON
-
Date:
H.LOWTHER
Scale:
1:115,000
OCTOBER
2016
Format:
A1
National Grid Document No.
PDD-30029-REP-0026
0
5
10
Contains Ordnance Survey data © Crown c opy right and databas e right [2016]
This c opy has been m ade by or w ith the authority of the Secretary, N ational Grid Electricity
Transm is sion Ltd, pursuant to Section 47 of the Copyright, Designs and Patents Ac t 1988 ("the
ac t"). Unles s the Act provides a relevant exc eption to the copyright the copy must not be
copied w ithout the prior permiss ion of the copyright owner.
PEI_4.2.1_Principal Environmental Constraints North Overview
20
FEED Document No.
Kilometres
16303780-REP-0026
Approved By:
P.REASTON
Sheets:
Date:
OCTOBER
2016
Rev:
1 of 2
-