Page 1 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 AMI 3724 West Vancouver St. Broken Arrow, OK, 74012 Tel: (918) 258-0707 Fax: (918) 258-0051 www.L-3com.com/AMI SUPPLIER QUALITY REQUIREMENTS 1 L-3 PROPRIETARY Page 2 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 Quality Note Title Date Revision 5/13/2014 H All Quality Requirements RevisionSummary: Revision H Updated to utilize Link document Revision Made By 2 L-3 PROPRIETARY S. Hernandez Page 3 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 QN‐10 QUALITYSYSTEMREQUIREMENTS QN‐10A QualityManagementSystem TheSellershallimplementandmaintainaqualityinspectionsystemacceptabletothe Buyer’sQualityAssuranceorganizationbaseduponISO9001.TheSellershallappointa managementrepresentativewhoshallhavedefinedauthorityandresponsibilityfor ensuringcontractrequirementsaresatisfied.Thequalityprogramshallbesubjectto reviewbytheBuyer,orBuyer’sCustomer,(bothreferredtohereafterasBuyer)atanytime duringtheexecutionofthiscontract.TheBuyerreservestherighttoaudittheSellerfor compliancewiththerequirementscontainedherein.TheBuyermayevaluate,inspect,or auditanywork,records,ordocumentationpertainingtothispurchaseorder.TheBuyer willnotifytheSeller72hoursinadvanceofavisitwithanintendedagenda. QN‐10B QualityPlanning Afterinitialreceiptoforder,theSeller’sQualityOrganizationshallreviewthecontract requirementstoensureprovisionshavebeenmadetocomplywitheachrequirement. QN‐10C QualityRecords TheSellershallmaintainasystemforidentification,collection,indexing,filing,storage,and maintenanceofqualityrecords.QualityrecordsincludereportsconductedattheSeller's incominginspection,in‐processinspection,andfinalinspection/testpoints. Qualityrecordsshallbelegibleandidentifiabletotheproductinvolved.Recordsshall includeinformationrelatingtothenature/numberofevaluationsmadealongwith informationonthetypesandquantityofanynonconformancefound.Allrecordsshallbe maintainedataminimumof5yearsafterdeliveryofthefinalproductandshallbemade availableperBuyer’srequest. QN‐10D SupplierInspectionSystem(AS9100RevisionC) SellershallbeincompliancewiththerequirementsofAS9100RevisionC,Quality ManagementSystems‐RequirementsforAviation,SpaceandDefenseOrganizations. Supplierdoesnothavematerialreviewauthorityunlessrequestedandapprovedinwriting bytheAMIQualityAssuranceDepartment. QN‐10E QualityandDeliveryRating SellerisresponsibleforcorrectinganynegativetrendsinproductQualityorDeliverythat areidentifiedbytheBuyer’sSupplierRatingSystem. SellermustmaintainaQualityRating ofatleast95percentandaDeliveryRatingofatleast90percentinamonththatthereis activity. Seller’swhofailtomaintaintheselevelsofproductandserviceperformancewill berequestedtotakethenecessaryactionsneededtoresolvetherootcauses. Selleris encouragedtoconductaninternalassessmentandimplementactionsdeemedappropriate topreventfurtherdegradationinperformanceandpossibleformalcorrectiveaction. 3 L-3 PROPRIETARY Page 4 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 QN‐10F SSOW SellershallcomplywiththeQualityAssurancerequirementsspecifiedintheSubcontractor StatementofWork(SSOW)orTaskDescriptiondocumentfortheproductorservice suppliedonthepurchaseorder INSPECTIONANDIDENTIFICATIONREQUIREMENTS QN‐20A GovernmentSourceInspection Onreceiptofthisorder,promptlynotifytheGovernmentRepresentativewhonormally servicesyourplantsothatappropriateplanningforGovernmentInspectioncanbe accomplished. TheSupplierisresponsibleforprovidingtheGovernmentInspectorwith objectiveevidencethatsuppliesmeettherequirementsofthePurchaseOrder. GovernmentsourceinspectiondoesnotconstituteacceptancebyAMIanddoesnotrelieve theSupplierofcompliancewithallrequirementsofthePurchaseOrder. QN‐20B FinalSourceInspection ArepresentativeoftheBuyer’sQualityOrganizationmayperformsourceinspectionofthe finaldeliverableProduct(s)asspecifiedinthepurchaseorderattheSupplier’sfacility. The finalsourceinspectionmaybeincremental,ifwarranted,subjecttoBuyerapproval. Seller shallnotifyBuyeraminimumoffive(5)workingdaysinadvanceofthedatewhenthe materialwillbereadyforBuyerinspection/test.Sellershallwithholdshipmentpending necessaryactionbytheBuyer’sQualityorganization.TheSuppliershallprovideallrecords, facilities,equipment,personnel,andassistancetoperformthefollowing: a. Areviewofallverificationrecordsrelatingtoallsub‐tierproduct(s)supplied onthispurchaseordertoverifythatthedeliverableproductbeingsupplied meetsthepurchaseorderrequirements. Ifthereareanyshortagesornon‐ conformances,theBuyershallmakethedeterminationifthesource inspectionwillproceed. b. Aphysicalinspectionoftheproducttodeterminecompliancewiththe workmanship,dimensionaland“as‐built”configurationrequirementsin drawingsandgoverningspecifications. Thesuppliershallrecordall dimensionalmeasurementsandinspectionattributesonthefirstarticle Productonly. TheSuppliershallhaveperformedallevaluationsnecessarytoverifythattheproduct beingsuppliedmeetsthepurchaseorderrequirementspriortonotifyingtheBuyerof readinessforsourceinspection. TheSuppliershallnotifytheBuyerQualityOrganization throughtheBuyer’sProcurementOrganizationatleastseventy‐twohoursinadvanceof theproduct’sreadinessforsourceinspection. TheSuppliershallnotshiptheproductuntil 4 L-3 PROPRIETARY Page 5 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 allinspectionsandtestshavebeensuccessfullycompletedandtheBuyer’sQuality Organizationhasgivenauthorization. SourceinspectiondoesnotconstituteacceptancebytheBuyeranddoesnotrelievethe SellerofcompliancewithalltherequirementsofthePurchaseOrder. QN‐20C FirstArticleInspection/TestReport(SDRLQA‐4) TheSellershallsubmitafirstarticleforinspectionandtestasapplicable.Allassemblies andcomponentsshallhavebeenproducedbytheSellerorfurnishedbyasub‐tierandshall havebeenmanufacturedusingthesameproductionprocesses,proceduresandequipment whichwillbeusedinfulfillingthecontract.Priortosubmission,theSellershallinspectthe componentorassemblythedegreenecessarytoensurethatitconformstothe requirementsofthecontractandsubmitarecordofthisinspectionwiththeitem,including statementsoffindingsformaterials,processesandtests. Allinspectionmeasurementsortestdataasapplicablemustberecordedonadocument normallyusedbytheSeller.Inlieuofaninspectiondocument,acopyoftheapplicable drawingcanbeusedtorecordactualdimensions.Ineithercase,thedimensionssubmitted shallbevalidatedwithanappropriateinspectionstamporsignature.Theapplicable parametersshallbedocumentedonaFirstArticleInspection/TestReport(AS9102FAI formsorsupplierequivalent).One(1)copyofthisdatawiththeBuyerpartnumberand purchaseagreement/ordernumberreferencedthereonmustaccompanythedeliveryof eachfirstarticleitemtobedeliveredhereunder.Afirstarticlesample,orportionthereof, asdirectedbyBuyer,shallalsobesubmittedwheneverthereisalapseinproductionfora periodinexcessofoneyearorwheneverachangeoccursinmanufacturingprocesses, materialused,drawingorspecification,whichsignificantlyaffectstheproductuniformity asdeterminedbyBuyer. ElectricalandElectro‐MechanicalComponents/Assemblies: TheFAIRdatashallbe comprisedofthefollowing. ATTRIBUTES,specification,test/inspection,testdataand requiredscreeningdatainaccordancewiththeapplicablespecificationshallbefurnished witheachshipmentagainstthisPO. Thetestdatashallbeartheapprovalsignatureofan authorizedrepresentativeofthesupplier. VARIABLES,testdata(readandrecord)in accordancewiththeapplicablespecificationsofeachlotcodeagainstthesubjectPO. The testdatashallbeartheapprovalsignatureofanauthorizedrepresentativeofthesupplier. CERTIFICATION,acertificateofcompliancebearingthesignatureofanauthorized representativeofthesupplierandreferencingtheAMIPO,partnumber,lotidentification (whereapplicable)shallbefurnishedwitheachshipment. Alltestdatashallberetainedin suchamannerthatitshallbeavailabletoL‐3AMIuponrequestforaminimumoffive(5) years. MechanicalComponents/Assemblies: TheFAIRdatashallincludeallsupporting documentationincludingtheoriginalmanufacturer'srawmaterialcertifications, specifications,hardwarecertificationsetc.Wherespecified,theFAIRshalldocument measurementsusingGeometricDimensioningandTolerance. 5 L-3 PROPRIETARY Page 6 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 Note:Somecommoditiesmaypertaintobothoftheprecedingcategoriesandaretobe addressedaccordingly. TheSellershallsubmittheinformationaboveinaccordancewithSDRLQA‐4concurrent withhardwaredelivery. QN‐20D CertificateofConformance(SDRLQA‐1) TheSellershallsubmitwithallshipmentsaCertificateofConformance(CofC),which indicatesallprocessesand/orrequirementsasdenotedhereinhavebeenmet.Aduly authorizedrepresentative,whosesignatureshallbeconsideredasbindingforthe company,shallsigntheCofC.Allcertificationsshallcontainafraudandfalsification statementinaccordancewiththecontracttermsandconditions.TheSellershallsubmitthe CertificateofConformanceinaccordancewithSDRLQA‐1concurrentwithhardware delivery. QN‐20E Mechanical/ElectricalInspectionData(SDRLQA‐3) MechanicalInspectionandElectricalInspectionmeasurements,whereapplicable, reflectingtherequirementsofthespecificationshallberecorded.TheInspectiondata pertinenttoeachshipmentofthesubjectcommodityagainstthisPOshallbeincludedwith theshipment.Thedatashallasaminimuminclude: • Partnumberandrevision • L‐3AMIPOnumber • Seller'stestprocedurenumberandrevision,ifapplicable • Parameterstestedorinspected • 100%mechanical*/electricalresultsofeachcomponentunlessotherwisespecified withinthePO • Dateoftestcompletion • EvidenceoftestacceptancebyauthorizedSeller'srepresentative TheSellershallsubmittheinformationaboveinaccordancewithSDRLQA‐3concurrent withhardwaredelivery QN‐20F AcceptanceTestProcedure(ATP) Thesuppliershallperformfunctionaltestandsupplydataaspertheengineeringdrawings and/orapprovedacceptancetestproceduresasspecifiedonthePurchaseOrder. Actual readingsaretobesuppliedforallquantitativemeasurements. QN‐20G CertificateofTest Adocument,signedbyanauthorizedsupplierrepresentative,statingthatallsupplier functionaltestrequirementshavebeenverifiedincomplianceofpurchasedocument requirements. 6 L-3 PROPRIETARY Page 7 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 QN‐20H SupplierTechnicalData TheSuppliershallprovidedatanecessaryforidentificationandverificationoftheitem(s) withtheshipment. Thedatamayconsistofassemblydrawings,schematics,partslistsor commercialcatalogsheetsthatcanbeusedtoverifythatthesuppliesconformtothe requirementsofthePurchaseOrder. QN‐20E Repair\FailureAnalysisReport(FAR) TheSuppliershallprovidearepairreportwitheachshipment. Thereportshallidentifythe causeofthefailure,documenttheactiontakentocorrecttheproblemandincludeactual resultsofexaminationsandteststoverifythatthefailurewascorrected. Thereportshall furtherincludethesignatureofanauthorizedcompanyrepresentative. QN‐20J GovernmentFurnishedEquipmentRepairParts Allpartsremovedasaresultofrework/repairfromtheGovernmentpropertysupplied withthisordermustbereturnedtothisfacility. Supplierdoesnothavetheauthorityto scraporotherwiseusesuchparts. TheSuppliershallplaceanidentifyingtagoneach removedpartandidentifywiththePurchaseOrdernumber,eachpieceparttakenfromthe assemblies. Therequirementisconsideredvoidiftheitemisexchangedinsteadof rework/repaired. QN‐20K CustomerFurnishedMaterial(CFM) TheSuppliershallinspect,uponreceipt,allmaterialsorpartsfurnishedbytheBuyeror Buyer’scustomer.Inspectionshallincludequantity,damage,corrosion,deterioration,and compliancetoanyapplicablepurchaseorderrequirements.TheSuppliershallprovide writtennotificationtotheBuyerthroughtheBuyer’sProcurementOrganizationofany discrepanciesfoundduringinspection.TheSuppliershallsegregateandwithholdfromuse allmaterialsandpartsfoundtobediscrepantpendingwrittendispositionfromtheBuyer. QN‐20L RadiographicInspectionReport AllradiographicfilmsaresubjecttofinalreviewandapprovalbytheBuyerandshallbe accompaniedbytheSellerscompletedradiographicreviewform.Therecordshallidentify thespecificprocedureemployed(includingprocedurenumber,dateand/orrevision number)andthespecificBuyerapprovaldocumentationwhenapplicable.TheBuyer reservestherighttoreviewthefilmonitspremisesorothersuchplacesasmaybe designated.Insuchcases,shipmentoffilmsshallberequestedoftheSellerinwritingby theBuyer.Submittaloffilmandradiographicreviewformshallbebyregisteredmail.The Buyerwillassumeresponsibilityforthefilmstotheextentofliabilityforre‐radiography, untiltheyarereturnedtotheSeller.Acopyoftheradiographicinspectionrecordand radiographictechniquesheetshallbesubmittedwiththeSeller’sdatapackagetothe Buyer,whenapplicable. 7 L-3 PROPRIETARY Page 8 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 Thesuppliershallfurnishx‐rayfilmandlaboratoryreportsforthiscommoditywitheach shipmentagainstthisPO.Thex‐rayfilmandlaboratoryreportshallrepresentthelot orderedandshallbesoidentified. QN‐20M UltrasonicTestingDocumentation UltrasonictestproceduresshallbedetailedtotheextentthattheBuyerisableto determinetheadequacyandextentofthetestingtobeperformed.Whenadditional informationsuchaspositioncharts,sketches,etc.,arepertinent,theyshallbesubmitted withtheprocedures.Objectiveevidenceofultrasonictestperformance(tapes,traces, charts,etc.)shallberetainedbytheSeller,andshallbemadeavailableforreviewbythe Buyeruponrequest.Documentationofapprovalsandqualificationshallbemaintainedin theSellersrecords.Ataminimum,thetestreportshallidentifytheSellersultrasonictest procedureemployed(includingprocedurenumber,dateand/orrevisionnumber), personnelperformingtheinspection,andtheresultsoftheultrasonictestincluding accept/rejectdispositionanddescriptionofindicationsbysizeandnumber,andbe submittedwiththeSellersdatapackagetotheBuyer. QN‐20N PartTraceability(JAN,JANTS,JANTV,JANS) ProcurementtraceabilityofJAN,JANTS,JANTVandtheJANSmarkeddevicesshallbe providedbyaccompanyingdocumentationasdescribedbelow. Whensourcesotherthan themanufacturerareinvolved,theirdocumentationshallbeinadditiontoandincludethat documentationprovidedbythemanufacturerandpreviousdistributors. ShelflifeofJAN markeddevicesshallbecontrolledinaccordancewiththelatestrevisionofMIL‐S‐38510. ACTIVEasof10/09/08,however,checkwithEngineeringbeforeflowingtosupplier. Requiredocumentation: 1. Manufacturer’sDocumentation; a. manufacturer’snameandaddress; b. devicetypeandqualityassurancelevel(JAN,JANTS,JANTV,JANS); c. lotdatecodeincludingassemblyplantcode; d. inspectiondateoflatestre‐inspectiondate; e. quantityofdevicesinshipmentfrommanufacturer; f. signatureanddateoftransaction. 2. Distributor’sDocumentation; a. distributor’snameandaddress; b. nameandaddressofcustomer; c. quantityofdevicesinshipment; d. latestre‐inspectiondate,ifapplicable; e. certificationthatthisshipmentisapartoftheshipmentcoveredbythe manufacturer’sdocumentation; f. signatureanddateoftransaction 8 L-3 PROPRIETARY Page 9 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 QN‐20O IdentificationofParts TheSellershallidentifytheproductfurnishedunderthispurchaseorderandtheindividual fabricatedassembliesmakinguptheproduct,perMIL‐STD130methodoptional.All informationshallbeidentifiedonthepartandshallbeviewablewithoutdisassemblyofthe unit. Iftheproductorassemblieshavenosuitableoradequatemarkingsurfaces,identification shallbebymeansofatagoridentificationonthecontainer.Identificationshallconsistofa minimumthefollowing: 1. 2. 3. 4. Buyer’spartnumber Partordrawingrevision MFGpartnumberand/orcagecode Engineeringordersordeviations,ifapplicable. QN‐20P MaterialAuthenticity OnlynewandauthenticmaterialsaretobeusedinproductsdeliveredtoBuyer.No counterfeitorsuspectcounterfeitpartsaretobecontainedwithinthedeliveredproduct. PartsshallbepurchaseddirectlyfromtheOCMs/OEMs,orthroughtheOCM/OEMs FranchisedDistributor.Documentationmustbeavailablethatauthenticatestraceabilityto theapplicableOCM/OEM.IndependentDistributors(Brokers)shallnotbeusedwithout writtenconsentfromBuyer(L‐3). QN‐20Q InspectionandTestRequirements TheSellershallperforminspectionsandtestsofproductstobedeliveredundertheterms ofthepurchaseorder.Inspectionandtestingshallassuretheproductstobedelivered conformtoalldrawing,specificationandpurchaseorderrequirements.Inspectionand testingshallincludematerial,parts,assembly,andend‐itemproductreceiving,processing, fabrication,assembly,andfinalproductinspectionsandtestsasrequiredherein.Exceptas otherwisespecified,theSellermayusehisownfacilitiesoranycommerciallaboratory acceptabletotheBuyer.TheBuyerreservestherighttoperformanyinspectionsortests deemednecessarytoassureproductconformstoprescribedrequirements.Final acceptanceoftheproductiscontingentuponitsdeliverytotheBuyer’sfacility,correction ofallproductdiscrepancies,andsatisfactoryinspection. QN‐20R InspectionandTestStatus Theproduct’sinspectionandteststatusshallbeaffixedtotheproduct,itsassemblies,and partsbyuseofmarkings,authorizedstamps,tags,labels,inspectionrecords,orother suitablemeanswhichidentifytheproduct’sconformanceornonconformancebasedon inspectionsandtestsperformed. 9 L-3 PROPRIETARY Page 10 of 24 Supplier Quality Requirements Rev Date F-1058 H 5/13/14 QN‐20S ReceivingInspection TheSuppliershallinspectallincomingmaterialtoensurethatthereisnodamageandthat thematerielconformstoalldrawing,specification,andpurchaseorderrequirements. QN‐20T In‐ProcessInspection TheSuppliershallperformauditsofthequalitysystemprocessesandinspectionofthe workin‐process,includingworkatLower‐TierSuppliersofcomplexormajorcomponents, ifanyarespecifiedbytheSupplier. TheSupplier’sprocessesandworkinprocessshallbe subjecttoreviewatanytimebytheBuyer’sQualityOrganization,includingworkatmajor Lower‐Tiersupplierfacilities. QN‐20U In‐ProcessInspectionSchedule TheBuyermayperformthein‐processinspectionsatanystageofSupplier’smanufacturing process. Buyerwillconfirmeachin‐processinspectionvisitthree(3)dayspriortoarrival atSupplier’sfacility. QN‐20V AcceptanceTests TheSellershallprepareandsubmitanAcceptanceTestProcedurefortheBuyer’sreview andapprovalinadvanceofstartingacceptancetestthatcomplieswiththerequirementsof thisSSOW. Thetestprocedureshalldescribetheinspections,tests,anddemonstrations necessarytoverifythatthefinalproductbeingsuppliedmeetsalltherequirementsofthe product’sspecificationanddrawings. Thetestprocedureshalllistthesequenceoftesting, environmentalconditionsduringtest,methodsoftesting,equipmentand/orsoftwaretobe usedduringtest,andthecriteriafordeterminingacceptableversusunacceptableresults. Theprocedureshallincludeadatasheetforcollectingandrecordingallmeasurementsand observationsmadeduringtest. Anychangestotheproceduremadeduringtestshallbe incorporatedintoafinalsubmittal. TheSellershallperformaqualificationtestofallfinalproduct(s)IAWtheapprovedATPto verifytheperformancerequirements. TheSellershallhavesuccessfullycompletedthe followingcriteriabeforestartoftheATP: a. TheSellershallhavecompletedallinspectionsandconfigurationvalidations asspecified. b. Allhardwareshallbefreeofshortagesandhavenoknownnon‐ conformances. Ifthereareanyshortagesornon‐conformances,theBuyer shallmakethedeterminationifthetestwillproceed. c. TheSellershallhaveobtainedBuyerapprovaloftheATP. d. Burn‐Inhasbeencompletedasrequired. ResultsofthesetestsshallbedocumentedandsubmittedtotheBuyer. Completionofthe testsshallnotconstitutefinalacceptancebytheBuyer. Number 10 L-3 PROPRIETARY Page 11 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 QN‐20W FinalAcceptance Finalacceptanceofproduct(s)suppliedunderthispurchaseordershallbeattheBuyer’s facility. FinalsourceinspectionshallnotrelievetheSupplieroftheresponsibilityof furnishingacceptableproduct. Alldiscrepanciesencounteredduringfinalsourceinspectionthathavenotbeen successfullycorrectedbeforeshipmenttotheBuyer’sfacilityshallbedocumentedina closureplanthatisapprovedbytheBuyer. BuyerQualityOrganizationapprovalofthe closureplanshallbeconsideredconditionalacceptanceoftheproductandgroundsfor shippingtheproducttotheBuyer’sfacility. Finalacceptanceshallbegrantedwhenallproduct(s)suppliedunderthispurchaseorder havebeenreceivedattheBuyer’sfacilityundamagedandtheSupplierhasfullysatisfiedall actionsintheclosureplantotheBuyer’ssatisfaction. QN‐20X ItemReturnedtoVendorforReworkorRepair Sellerisrequestedtoincludewiththereturneditemresultsofanyfailureanalysisthey electtoperformtodeterminecause. PleaseNote: 1)WhenthereturneditemfailureisdocumentedonaNonconformance MaterialReportthathasbeenassignedastheSeller'sresponsibility,thatfailurewill negativelyaffecttheSeller’squalityapprovalrating. Sellerfailureanalysesthatidentify therootcauseofthefailurewasnotcausedbytheSellerwillhavetheresponsibilityre‐ assigned,therebyimprovingtheSeller'squalityrating. 2)PartrevisionsstatedinthePO areforreferenceonly,unlessotherwisespecified. 3) Anyreworkorrepairofthereturneditemthatwouldchangetheas‐built/received configurationmustbeapprovedinadvance. QN‐20Y ItemsContainingSoftwareorFirmware WhensoftwareorfirmwareiscontainedinahardwaredeliverablelineitemofthePO,it shallclearlybeidentifiedonthepackinglistandCertificateofConformance,includingits versionorrevision. QN‐20Z QualityEngineerNotification(ForinternalusebyAMIonly) InspectorshallnotifytheprogramQualityEngineerviae‐mailwhenproducthas completedReceivingInspection. QN‐20AA ConfigurationManagement The Seller shall maintain a configuration management program that ensures configuration indexing, change management, change control and configuration auditing is applied to all products delivered for further integration at the Buyer’s facility. The Seller shall conduct a Physical Configuration Audit (PCA) prior to the Buyer’s initial acceptance of each device. This shall occur at the Seller’s facility. The PCA shall be performed to verify that the trainer design configuration and as-built configuration conform to the 11 L-3 PROPRIETARY Page 12 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 contractually required product configuration. Successful completion of the PCA establishes the Customer Product Baseline. QN‐30 WORKMANSHIPREQUIREMENTS QN‐30A 001) PreparationandSolderingofElectricalConnections(ANSI/IPC/J‐STD‐ RequirementsforSolderedElectricalandElectronicAssemblies: appliestothisPurchase OrderandtheSuppliershallcomplywiththelatestrevisionineffectonthedateofthis order. TheSuppliermusthavedocumentationandwrittenprocessestoimplementthis specification. ClassificationlevelwillbeunderstoodtoClass3unlessotherwisespecified inthePurchaseOrder. QN‐30B WorkmanshipControl TheSellershallestablish,implement,andmaintaincontroloverallworkperformedon productssuppliedunderthispurchaseorderinaccordancewithcurrentrevisionofClass3 requirementsof: • IPC‐A‐610AcceptabilityofElectronicAssemblies • IPC‐A‐620RequirementsandAcceptanceforCableandWireHarnessesAssemblies • J‐STD‐001RequirementsforSolderElectricalandElectronicAssemblies TheBuyerencouragestheuseofBestCommercialPractices(BCP)andinvitestheSellerto identifyandsubmitforBuyer’sreviewandapprovalpracticesemployedbytheSellerthat couldbeusedinlieuoftheabovelisteddocuments. In the event of conflicts in referenced Buyer documentation or interpretation of requirements, the Seller shall obtain clarification from the Buyer’s Quality organization. Seller’scompliancewith theaboverequirementsshallbesubjecttotheBuyer’sQualityOrganizationauditand approval. QN‐30C PrintedWiringBoardRequirementsforHotAirSolderLeveledBoards Solderthicknessshallbeaminimumof.0003inchesatfive(5)samplelocationsacrossthe boardsurface. Measurementdatashallbeprovidedforeachsample.Ioniccontamination mustbecheckedandadataprintoutsuppliedwitheachlot.Eachboardshallbe individuallypackagedinaself‐sealingantistaticbagwithadesiccantinaccordancewith MIL‐D‐3464andhumidityindicatorinaccordancewithMIL‐I‐8835. Thehumidity indicatorshallbevisibleforinspectionwithoutopeningthepackage. Inaddition,datafor solderthicknessinthebarrelistobesuppliedwitheachlotshipped. QN‐30D RequirementsforWeldingandBrazingProcedureandPerformance Qualification(SDRLQA‐5) AllweldingproceduresandweldersshallbequalifiedtothelatestreleaseofNAVSEA S9074‐AQ‐GIB‐010/248,ortheirreplacementorcommercialequivalent.Allinspections andworkcriteriashallbeperthistechnicalspecificationandtheprovideddrawings. 12 L-3 PROPRIETARY Page 13 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 Workperformedunderthisworkscopeshallexhibitgoodworkmanship.Surfacestobe joinedshallbeuniformandfreeofcracks.Surfacesadjacenttoajointshallbefreeofloose scale,rust,orforeignmaterial. Inspectionsofallweldsshallbevisualwithoutaidofmagnification.TheSellershall conductperiodicinspectionstoassureconformancetotheacceptancecriteriaofNAVSEA S9074‐AQ‐GIB‐010/248,ortheirreplacementorcommercialequivalent.TheBuyershall havetheoptiontoperformaninspectionofcomponents,subassemblies,panels,orgage boardspriortopainting,attheSeller’sfacilitytoassureconformancetothesame acceptancecriteria.Theresultsoftheseinspectionsandanycertificationshallbe documentedandkeptonfileforreviewbytheBuyer. Controlsonsurfacefinishingtools,handtools,andhandlingequipmentshallbecleanprior touse,andshallnotbepreviouslyusedonlowmeltingpointmetals.Carbon,lowalloy,or tollsteelsmaycontactcorrosionresistanthardwareprovidedtheyarehardenedandfree ofrustpriortouseandtheiruseisfollowedbyavisualinspectiontoverifynotransferof materialfromthetoolorhandlingequipmenttothehardware.Anindependentinspection isnotrequired.Iftransferisdetected,itshallberemovedbyasuitablemeanswhichwill notresultintheviolationofsurfaceroughnessrdimensionalrequirements.Wirebrushes madefromcarbon,lowallow,ortollsteelshallnotbeusedoncorrosionresistant hardware.TheSellerandtheirsubcontractorsshallmaintainpositivecontroltopreclude theuseoftoolsandhandlingequipmentthatwerepreviouslyusedonlowmeltingpoints listedbelow: • Antimony • Bismuth • Cadmium • Lead • Tin • Zinc TheSellershallsubmittheinformationaboveinaccordancewithSDRLQA‐5concurrent withhardwaredelivery QN‐30E HydrostaticTesting The Seller shall submit required hydrostatic test procedures for approval. Each procedure shall identify the applicable code/standard used to prepare the procedure. The documentation shall be submitted at least 30 days prior to the performance of any actual work. Hydrostatic testing may not be performed unless waived by the Buyer. The results of hydrostatic testing for compliance with acceptance criteria shall be submitted to the Buyer for information within 60 days following completion of testing. 13 L-3 PROPRIETARY Page 14 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 QN‐30F NondestructiveTesting(NDT)andQualificationofNondestructive ExaminationPersonnel Certified NDT procedures and NDT qualification criteria shall be submitted for Buyer approval. Each procedure shall identify the applicable code/standard used to prepare and certify the procedure. The documentation shall be submitted at least 30 days prior t the performance of any actual work. Pressure equipment NDT may not be performed until Buyer approval has been obtained unless waived by the Buyer. NDT qualification and certification records for all manufacturer personnel required to perform NDT and examine the results NDT shall be submitted to the Buyer for information. The results of NDT for compliance with qualifications criteria shall be submitted to the Buyer for information with 60 days following completion of NDT inspection or prior to performance of any required hydrostatic testing, whichever occurs earlier. Hydrostatic testing shall not be performed until the Buyer acknowledges receipt of NDT unless waived by the Buyer. The following reporting requirements are additionally applicable to the specific type of NDT testing performed. Other nondestructive testing and examination required prior Buyer approval. QN‐40 MATERIAL,TOOLING,CALIBRATION,DOCUMENTATION,SUPPLIER PROCESSCONTROL QN‐40A MaterialSafetyDataSheet MaterialSafetyDataSheets(MSDS)arerequiredforeachshipmentonthisorder.The MSDSmustreferencethisPurchaseOrdernumber. QN‐40B Tooling Anyspecialtoolingdevelopedunderthisprocurementshallbesubjecttofirstarticle verificationforcompliancewiththedrawingrequirementsandacceptabilityforproducing acceptablefinishedparts. QN‐40C CertificateofAnalysis/ChemicalandPhysicalTestReports Sellermusthaveonfile,athisplantorhissupplier’splant,certificate(s)of analysis/physicalandchemicaltestreportscoveringmaterialusedonthisorder. Records substantiatingtheforegoingshallbeavailableforexaminationbyBuyerQualityAssurance. QN‐40D CalibrationandControlofMeasuringandTestEquipment Calibratedequipmentandtoolsshallbeusedforallinspectionsandtestusedtodetermine theacceptabilityoftheproduct.Equipmentandtoolsshallhaveanaccuracyandrange suitablefortheintendeduse.Toensurevalidresults,QualityAssurancemaintainsasystem forthecalibration,verificationorboth,ofallmeasuringandtestequipmentand measurementstandardsusedinthefulfillmentofcontractualrequirements.Equipment andtoolsshallbecalibratedagainstreferencestandardstraceabletotheNationalInstitute 14 L-3 PROPRIETARY Page 15 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 ofStandardsandTechnology;obtainedfromindependentreproduciblestandards;derived fromtheratiotypeofself‐calibrationtechniques;oranindustryconsensusstandard, wherenosuitablestandardexists.Equipmentandtoolsshallbecalibratedatestablished intervals. QN‐40E CalibrationCertificateofConformance(SDRLQA‐2) Acertificate,report,ordatasheetattestingtothedate,accuracyofthestandardsused,and theenvironmentalconditionunderwhichtheresultsfurnishedwereobtainedshallbe suppliedforeachitemcalibratedunderthispurchaseorder.Thisreportorcertificatemust attesttothefactthattheaccuracyofthestandardsusedinobtainingtheresultshasbeen comparedatplannedintervalswiththeNIST,WWVB,hasbeenderivedfromaccepted valuedofNaturalPhysicalConstants,orhasbeenderivedbytheratio‐typeofself‐ calibrationtechniques.Theaccuracyofthestandardsmustbeatleastfourtimesthe accuracyoftheequipmentbeingcalibrated. TheSellershallsubmittheCalibration CertificateofConformanceinaccordancewithSDRLQA‐2concurrentwithhardware delivery. QN‐40F ElectrostaticDischargeProtection Selleragreesthatallstatic‐sensitiveelectricalandelectronicparts,assembliesand equipmentshallbehandledandprotectedtoeffectivelypreventdamagefromelectrostatic dischargeusinganElectrostaticDischarge(ESD)controlsystemwhichencompasses protectedareas,handlingprocedures,protectivecovering,qualityprecautions,auditand review,trainingofemployees,andpackingandpackagingfordelivery. QN‐40G AgeSensitive/ShelfLifeMaterial MaterialidentifiedonthisPurchaseOrderisconsideredagesensitive. Suppliershall providethefollowingdataupondelivery: QN‐40H a. b. c. d. manufacturingdate; shelflifeand/orexpiration date; rubbercuredatefor gasket material; materialshallhaveat least 3/4 (75%)of its shelf liferemainingatthe shipment CertificationofMercuryExclusion EachshipmentmadeagainstthisPurchaseOrdermustcontainastatementcertifyingthe following: “Theitemfurnishedunderthisordercontainsnometallicmercuryormercury compoundsandI,asaSupplier,havetakenreasonablestepstoensurethatthe suppliesfurnishedunderthisorderarenotcontaminatedwithmetallicmercuryor mercurycompounds.” ThiscertificationmustreferencethePurchaseOrdernumber,partnumber,descriptionand quantityoftheshipment. 15 L-3 PROPRIETARY Page 16 of 24 Supplier Quality Requirements QN‐40I Number Rev Date F-1058 H 5/13/14 Lower‐Tier‐Suppliers TheSellerisresponsiblefortheperformanceofhislower‐tiersuppliersandshallmaintain asystemtoassurethatallpurchasedmaterials,equipment,andservicesconformtoorder requirements,including: a. Selectionofqualifiedsuppliers b. Passdownoforderrequirements c. Qualitysurveillanceprocessandproductverificationprocureditemsandservices, includingdetailreviewofallmaterialtestreports,inspectionandtestdata,and personnelandprocedurequalificationdocumentationreceivedfromalllower‐tier supplierstoassurethatallapplicablecodes,specificationsandstandardsinvokedin thepurchaseorderrequirementshavebeenfullymetfortheproductsandservices providedbythelower‐tiersuppliers Effectiveinformationfeedbackandcorrectionofnon‐conformances QN‐40J BuyerAccesstoSeller’sFacility TheSeller’s(andSeller’slowertiersuppliers)systems,facilities,personnel,equipmentand documentationassociatedwiththeproductorservicebeingprocuredshallbesubjectto audit,in‐processsurveillance,and/orsourceinspectionbytheBuyerand/orGovernment Representativesatnoadditionalcost.TheSellerwillreceiveadvancenotificationofthe dateplannedforaudit. QN‐40K MaterialReviewBoard(MRB)Authority TheSupplierisnotauthorizedMRBauthorityfornonconformancethataffectsspecific Buyerrequirements. Onlyshipmentsofproductconformingtotherequirementsofthispurchaseorderwillbe acceptedunlessauthorizedinwritingbytheBuyer’sQualityOrganization.Any nonconformingmaterials,parts,orproductsaffectingspecificBuyerrequirementsimposed bythepurchaseorder,Buyer’sdrawing,oranyotherapplicablespecificationshallbe submittedtotheBuyer’sProcurementOrganizationforBuyer’sMRBdisposition.Thisshall beaccomplishedattheearliestpossibletimeandmustbepriortoshipment.Sellershall includethereasonforthediscrepancyandthecorrectiveactiontakentoprevent recurrence.IftheSellerisuncertainastotheeffectofthenonconformanceonspecific requirements,theconcurrenceofarepresentativeoftheBuyer’sQualityOrganizationshall beobtained. QN‐40L WorkinProcessHandling,Storage,andPackaging TheSellershallmaintainproceduresforhandling,storage,andpackagingduringthe manufacturingprocessthatpreventsdamageordegradationoftheproduct. Appropriatemethodsforauthorizedreceiptanddispatchofproductsintheareashallbe established. 16 L-3 PROPRIETARY Page 17 of 24 Supplier Quality Requirements QN‐40M Number Rev Date F-1058 H 5/13/14 SpecialProcesses AqualityplanshallbeestablishedbytheSellertodefinethespecificactionsthatwillbe takentomeetthequalityrequirementsrelatedtospecialprocesses(e.g.,welding,brazing, plating,cleanliness,detrimentalmaterialcontrols,heattreating,hardfacing, nondestructivetest(NDT),electricdischargemachining,electromechanicalmachining, anodization,chem.film,coating,electrostaticdischarge(ESD),bonding)containedinthis order.Theplanshallinclude,asaminimum,thefollowing: Identificationofproductorservicestobeobtainedfromalower‐tiersupplierandthe identificationofthelower‐tiersupplier Adescriptionoftheinspectionsandteststhatwillbeperformedtocontrolandevaluatethe involvedspecialprocesses Adescriptionofthepersonnelandprocedurequalificationprogramtoassurecompliance withapplicablecodes,specifications,andstandards AlldocumentationshallbeavailabletotheBuyeruponrequest. QN‐40N SellerProcessChangeControl TheSellershallobtaintheBuyer'sapprovalpriortoeither: • Relocationofworktoanotherproductionfacility; • Changingthedesign,manufacturingprocesses,materialsoractivitiesthataffectfit, formorfunction. Ananalysisshallbeperformed,documented,andincludedwithanyrequestforchange.A documentedprocessshallbeinplacetoreview,identifyandsubmitarequestforchangeto theBuyer.Thisrequestshallbesubmitted14dayspriortotheplannedimplementation. ThechangewillnotbeimplementedunlessapprovedbytheBuyer. QN‐40O DocumentControl TheSellershallmaintainproceduresforcontrolofalldocumentsanddatarelatingtothe requirementsofthiscontract. Documentsshallbereviewedandapprovedpriortorelease toensuretheiradequacy. Subsequentchangesormodificationsshallalsobecontrolledina similarmanner. Drawingand/orspecificationsshallbemaintainedforcustomdesignedproducts. These drawings/specificationsshallprovidesufficientdetailtoensuresuccessfulprocurementof additionalunits. ThesedesigndocumentsshallbesubjecttotheBuyer’sreview. QN‐40P Purchasing TheSuppliershallensurethatallpurchasedproductsconformtotherequirementsofthis contract.Suppliers/subcontractorsshallbeselectedforusebasedontheirabilityto performinaccordancewithestablishedrequirements. 17 L-3 PROPRIETARY Page 18 of 24 Supplier Quality Requirements QN‐40Q Number Rev Date F-1058 H 5/13/14 ProductChanges TheSuppliershallobtainBuyer’sconcurrenceinwritingpriortoincorporatinganydesign, material,process,ortechnicaldocumentationchanges(s)onitemsdeveloped. QN‐40R MaterialControl TheSupplierisresponsibleforassuringthatallsuppliesandservicesprocuredfromtheir suppliersconformtothecontractrequirements. QN‐40S ControlofNonconformingProducts TheSuppliershallmaintainproceduresforidentification,control,anddispositionof nonconformingproducts. QN‐40T ProcessImprovement TheSuppliershallnotifytheBuyerofanymodificationsthatcouldbemadetothe requirementsofthisorder,whichresultinsignificantcostsavings,schedulereduction,or productqualityenhancement. QN‐50 SOFTWARE/SYSTEMREQUIREMENTS QN‐50A GovernmentSoftwareQualityEvaluation TheSupplier’ssoftwarequalityprogramshallcomplywiththe“SoftwareQuality EvaluationRequirements”ofparagraph5.8ofDOD‐STD‐2167. DORMANT‐document,as of10/09/08wasultimatelysupersededbyIEEE12207. CheckwithEngineeringbefore flowingtosupplier QN‐50B GovernmentSoftwareQualityProgram TheSupplier’ssoftwarequalityprogramshallcomplywiththe“DefenseSystemSoftware QualityProgramRequirements”ofDOD‐STD‐2168. ACTIVEASOF10/09/08. QN‐50C CommercialSoftwareQualityProgram TheSupplier’ssoftwarequalityprogramshallcomplywiththerequirementsofIEEE StandardforSoftwareQualityAssuranceIEEEStandard730. ACTIVEasof10/09/08 QN‐50D CorrectiveAction TheSuppliershallmaintainproceduresforsecuringeffectiveandtimelycorrectiveactions fornonconformance. Thisincludesnonconformancefoundduringincominginspection,in processorfinalinspection,sourceacceptance,andfieldreturns. 18 L-3 PROPRIETARY Page 19 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 Correctiveactionsshalladdressthefollowing: a. Identificationoftheprimarycauseofthenonconformance. b. Analysisofprocessing,workoperations,qualityrecords,andcustomer complaints,todetectandeliminatepotentialcausesofnonconforming products. c. Initiationofpreventativeactionstoresolveproblemsatalevelconsistent withtheriskencountered. d. Applicationofcontrolstoensurethatcorrectiveactionstakenareeffective. Implementationandrecordingofchangesrequiredasaresultofthe correctiveaction. QN‐50E BuyerRequestedCorrectiveAction Whenproductspecifiedonthispurchaseorderarefoundtobenonconformingbythe Buyer,aCorrectiveActionRequest(CAR)willbesenttotheSupplier. TheCARshallbecompletedandreturnedwithin15workingdays. Unauthorizeddelaysin theSupplier’sresponseshallbecauseforremovalfromtheBuyer’sApprovedSupplierList. TheSupplier’scorrectiveactionmustbeeffectiveandpermanentineliminatingtheroot causeofthenonconformance. QN‐50F PackagingRequirements All material shall be packaged in accordance to industry standards unless otherwise stated in the Purchase Order Cable,ConduitandHarnessPackaging–Allcableassemblies,conduits,andharness assembliesshallbepackagedtopreventdeformationofconductorinsulationanddamage toconnectorsandconnectorpins.Allconnectorsshallbeindividuallywrapped. BoardPreservationandPackaging–Sellershallindividuallypackageeachprintedcircuit, printedwiring,multi‐wireorwirewrapboardfurnishedonthispurchaseorderinanESD shieldedbag. 19 L-3 PROPRIETARY Page 20 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 QAITR APPENDIX-1 CERTIFICATE OF CONFORMANCE DATE: COMPANY NAME: ADDRESS: PO NUMBER: PO LINE(S): PART NUMBER: REVISION: QUANTITY: SERIAL NUMBER(S): LOT NUMBER (If Applicable): DESCRIPTION: Seller hereby certifies all items (material, components, parts, assemblies, and/or final product(s)) furnished in this shipment of the Purchase Order meet the following requirements: a. Items shall be in full compliance with the requirements of the Purchase Order, drawing(s), specification(s), and other applicable documents as specified in the L-3 Communications GENERAL TERMS AND CONDITIONS For Supply and Services Subcontracts, unless otherwise specified in the Purchase Order. b. Items shall use only new and authentic components, parts, and materials that have been procured from the original component/equipment manufacturer (OCM/OEM), or through an OCM/OEM Franchised distributor. c. Items shall use no component, part, or material that has been procured from an Independent Distributor (Broker), unless approved in writing by the Buyer. d. Items shall have been inspected and tested to the current revisions of the standard. (Mark all that apply) IPC-A-610 IPC-A-620 J-STD-001 f. Items shall have applicable supporting inspection records, test data, and certificates of conformance on file and available for Buyer review upon request. CERTIFIED BY (An Authorized Company Official): TITLE: DATE: 20 L-3 PROPRIETARY Page 21 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 1. SDRL Number: 2. Title of Data Item: Certificate of Conformance QA-1 3. SSOW Reference: Certificate of Conformance 4. Buyer Approval: Required Information Only 5. Buyer Review Time: 6. Initial Submittal: N/A working days Must be submitted with all shipments 7. Seller Incorporation Time: 8. Subsequent Submittals: N/A working days Must be submitted with all shipments 9. Submission Requirements: a. Seller may use format defined in QAITR Appendix-1. b. Provide one hard copy with hardware delivery. 21 L-3 PROPRIETARY X Page 22 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 1. SDRL Number: QA-3 2. Title of Data Item: Mechanical/Electrical Inspection 3. SSOW Reference: Data Mechanical/Electrical Inspection Data 4. Buyer Approval: Required Information Only X 5. Buyer Review Time: 6. Initial Submittal: N/A working days Must be submitted with all shipments 7. Seller Incorporation Time: 8. Subsequent Submittals: N/A working days Must be submitted with all shipments 9. Submission Requirements: a. Part number and revision b. L-3 AMI PO number c. Seller's test procedure number and revision, if applicable d. Parameters tested or inspected e. 100% mechanical*/electrical results of each component unless otherwise specified within the PO f. Date of test completion g. Evidence of test acceptance by authorized Seller's representative h. Provide one hard copy of the Mechanical/Electrical Inspection with hardware delivery. 22 L-3 PROPRIETARY Page 23 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 1. SDRL Number: QA-4 2. Title of Data Item: First Article 3. SSOW Reference: Inspection First Article Inspection 4. Buyer Approval: Required Information Only 5. Buyer Review Time: 6. Initial Submittal: N/A working days Must be submitted with first shipment 7. Seller Incorporation Time: 8. Subsequent Submittals: N/A working days Whenever there is a lapse in production for a period in excess of one year or whenever a change occurs in manufacturing processes, material used, drawing or specification, which significantly affects the product uniformity as determined by Buyer 9. Submission Requirements: a. X Provide one hard copy with hardware delivery. 23 L-3 PROPRIETARY Page 24 of 24 Supplier Quality Requirements Number Rev Date F-1058 H 5/13/14 1. SDRL Number: QA-5 2. Title of Data Item: Qualification and Acceptance Welding Procedures 3. SSOW Reference: Qualification and Acceptance Welding Procedures 4. Buyer Approval: Required X Information Only 5. Buyer Review Time: 6. Initial Submittal: 10 working days 30 days before welding 7. Seller Incorporation Time: 8. Subsequent Submittals: 5 working days Whenever there is a lapse in production for a period in excess of one year or whenever a change occurs in manufacturing processes, material used, drawing or specification, which significantly affects the product uniformity as determined by Buyer 9. Submission Requirements: a. All welding procedures and welders shall be qualified to NAVSEA S9074-AQ-GIB-010/248, or their replacement or commercial equivalent. All inspections and work criteria shall be per this technical specification and the provided drawing and are required to demonstrate compliance with the SSOW and Specification. b. The Acceptance Welding Procedures and qualifications shall be subject to Buyer approval. c. The Acceptance Procedures and qualifications shall be delivered d. Provide one electronic copy. 24 L-3 PROPRIETARY
© Copyright 2026 Paperzz