The coming of Europe’s offshore wind energy industry Anne-Bénédicte Genachte Regulatory Affairs Advisor – Offshore Wind Power European Wind Energy Association 06 December 2011 Presentation outline • • • • • Offshore wind installed capacity Market shares Future growth Trends Supply chain First offshore wind farm Vindeby (DK), online in 1991 Tech. specs.: - 11 WT of 450 kW (0.45 MW) - Distance to shore 1.5 km to 3 km - Water depth 2m to 6m - Distance between turbines 500m - Total area 3km² - Hub height 35m above sea level - Rotor diameter 35m Largest offshore wind farm (to date) Thanet (UK), online in 2010 Tech. specs.: - 11 WT of 450 kW (0.45 MW) - Distance to shore 1.5 km to 3 km - Water depth 2m to 6m - Distance between turbines 500m - Total area 3km² Production 11.2 GWh per year Capacity factor 21.1% Hub height 35m above sea level Rotor diameter 35m Tech. specs.: - 100 WT of 3MW - Distance to shore 7km to 8.5km - Water depth 20m to 25m - Distance between turbines 800m - Total area 35km² - Hub height 70m above sea - Rotor diameter 90m Installed capacity Global cumulative installed capacity Donghai Daquiao (China) Vindeby Tech. specs.: - 100 WT of 3MW - Distance to shore 7km to 8.5km - Water depth 20m to 25m - Distance between turbines 800m - Total area 35km² - Hub height 70m above sea - Rotor diameter 90m Thanet Installed capacity Share of new offshore capacity and share of new onshore capacity Tech. specs.: - 100 WT of 3MW - Distance to shore 7km to 8.5km - Water depth 20m to 25m - Distance between turbines 800m - Total area 35km² - Hub height 70m above sea - Rotor diameter 90m Presentation outline • • • • • Offshore wind installed capacity Market shares Future growth Trends Supply chain Market shares 1991 total 4.95 MW 1995 total 11.95 MW 0% 0% 0% DK 100 % 0% DK 83% 2000 total 35.5 MW 0% NL 17% 2005 total 695 MW SE 8% UK 0% 0% DE NL SE 1% 3% 3% EI 3% 11% NL 53% DK 28% DK 59% UK 31% Market shares 2010 total 2,946 MW NO 0% 2011 (30 June) total 3,295 MW IE FI DE 1% 1% 3% NO IE FI 0% 1% 1% SE 5% DE 6% SE 6% BE 7% UK 45% NL 8% DK 29% UK 48% BE 6% NL 7% DK 26% Presentation outline • • • • • Offshore wind installed capacity Market shares Future growth Trends Supply chain Future growth EU cumulative installations onshore/offshore to 2030 Tech. specs.: - 100 WT of 3MW - Distance to shore 7km to 8.5km - Water depth 20m to 25m - Distance between turbines40GW 800m - Total area 35km² - Hub height 70m above sea - Rotor diameter 90m 150GW EWEA SCENARIOS FOR 2020 & 2030 Summary of offshore wind energy in 2020 • 40GW offshore installed capacity • Meeting 4% of EU electricity demand • Offshore wind energy’s share of EU wind energy production increasing to 25.5% • Annual installations of 6.9 GW (28% of wind installations) • Annual investments of €10.4 bn (39.1% of wind investments) Future growth Historical onshore growth compared to EWEA offshore projection Tech. specs.: - 100 WT of 3MW - Distance to shore 7km to 8.5km - Water depth 20m to 25m - Distance between turbines 800m - Total area 35km² - Hub height 70m above sea - Rotor diameter 90m Summary of offshore wind energy in 2030 • 150GW offshore installed capacity • Meeting between 12.8% and 16.7% of EU electricity demand • Annual installations of 13.7 GW (58% of wind installations) • Annual investments of €17.1 bn offshore (67% of wind investments) Total offshore wind capacity installed, under construction, consented, planned at 30 June 2011 and per sea basin in MW Presentation outline • • • • • Offshore wind installed capacity Market shares Future growth Trends Supply chain Trends Distance and water depth of wind farms BARD 1 (DE) Alpha Ventus (DE) Thanet Vindeby East Anglia Array (UK) Tech. specs.: - 100 WT of 3MW - Distance to shore 7km to 8.5km - WaterBeatrice depth 20m to 25m (UK) - Distance between turbines 800m Prinses Amalia (NL) - Total area 35km² - Hub height 70m above sea - Rotor diameter 90m Trends Distance and water depth of wind farms H2-20 (DE) Hornsea (UK) Tech. specs.: - 100 WT of 3MW Palamos (ES) - Distance to shore 7km to 8.5km Dogger Bank- (UK) Water depth 20m to 25m - Distance between turbines 800m - Total area 35km² - Hub height 70m above sea - Rotor diameter 90m Roses (ES) Presentation outline • • • • • Offshore wind installed capacity Market shares Future growth Trends Supply chain Supply chain – Wind in our Sails – key elements • Supply chain is dynamic and responding to challenges through investments in innovation: – – – – – Turbines Substructures Electrical infrastructure Vessels Ports KEY MESSAGES • The European Union leads the world in offshore wind power with 4,000MW already installed • This major industrial development will bring a significant number of jobs and create development opportunities for European companies • However, there are still challenges ahead and support is needed: – Favourable national framework conditions: NREAPs, licensing and permitting procedures, maritime spatial planning, reinforcement of onshore networks – Support from the EU: stable post-2020 legislative framework, offshore grid Thank you for your attention www.ewea.org EWEA 80 RUE D’ARLON B-1040 BRUSSELS T: +32 2 213 1865 E: [email protected]
© Copyright 2026 Paperzz