Earthwork Roadway Excavation Imported Borrow Clearing and Grubbing Develop Water Supply Top Soil Reapplication Stepped Slopes and Slope Retainign wall Quantity Pavement Structural PCC PAVEMENT(__DEPTH) PCC PAVEMENT(__DEPTH) ASPHALT CONCRETE LEAN CONCRETE BASE CEMENT-TREATED BASE AGGREGATE BASE TREATED PERMEABLE BASE AGGREGATE SUB BASE PAVEMENT REINFORCING FABRIC EDGE DRAINS Quantity 798288 500000 1 1 0 4455 0 0 1227 0 1604 0 0 SPECIALTY ITEMS Quantity RETAINING WALLS NOISE BARRIERS BARRIERS AND GAURDRAILS EQUIPMENT/ANIMAL WATER POLLUTION CONTROL HAZARDOUS WASTE INVESTIGATION AND/OR MITIGATION WORK ENVIRONMENTAL RESIDENT ENGINEER OFFICE SPACE TRAFFIC ITEMS LIGHTING TRAFFIC DELINEATION TRAFFIC SIGNALS OVERHEAD SIGN ROADSIDE SIGN TRAFFIC CONTROL SYSTEMS TRANSPORTATION MANAGEMENT PLAN TEMPORARY DETECTION SYSTEM STAGING Quantity ROADSIDE MANAGEMENT AND SAFTEY SECTION VEGETATION CONTROL TREATMENTS GORE AREA PAVEMENT PAVEMENT BEYOND THE GORE AREA MISCELLANEOUS PAVING EROSION CONTROL SLOPE PROTECTION Quantity Unit CY CY LS LS ? ? Unit Price $ $ $ $ $ $ 16.80 16.40 38,828.00 100,000.00 16.80 16.80 Unit CY Unit Price $ $ $ $ $ $ $ $ $ $ 160.00 2.00 40.00 52.00 - SQYD CY CY ?? ?? Unit CY 0 LF 0 1 LS ? ? ? Unit 36 4 24 4 1 1 Unit Unit Price $ $ $ $ $ ? ? ? Unit Price $ $ $ $ $ $ $ $ Unit Price $ $ $ $ $ $ Item Cost $ 13,411,238.40 $ 8,200,000.00 $ 38,828.00 $ 100,000.00 $ $ 0 0 Item Cost $ $ $ 8,910.00 $ $ $ 49,080.00 $ $ 83,408.00 $ $ - Section Cost $ UNIT PRICE SET COULD NOT FIND UNIT PRICE NEED TO UPDATE UNIT PRICE Section Cost $ Item Cost Section Cost 328.00 $ $ $ 27.00 $ $ 2,000.00 $ 2,000.00 #VALUE! #VALUE! #VALUE! 100,000.00 16.80 250,000.00 15.00 200.00 110,000.00 3,000.00 30,000.00 16.80 16.80 16.80 16.80 16.80 16.80 Item Cost Section Cost $ 3,600,000.00 $ $ $ 1,000,000.00 $ $ 4,800.00 $ 440,000.00 $ 3,000.00 $ 30,000.00 Item Cost `` $ $ $ $ $ Section Cost $ - 21,750,066.40 141,398.00 2,355.00 5,077,800.00 184.80 SIDE SLOPES/EMBANKMENT MAINTENANCE VEHICLE PULL OUTS OFF-FREEWAY ACCESS ROADSIDE FACILITIES RELOCATING ROADSIDE $ $ $ $ $ 16.80 16.80 16.80 16.80 16.80 Minor Items - $ 26,971,804.20 Total Minor Items $ $ 29,668,984.62 Total Roadway mobilization $ 2,966,898.46 ROADWAY MOBILIZATION ROADWAY ADDITIONS $ $ $ $ $ 2,697,180.42 Total Roadway Additions $ 2,966,898.46 CONTIGENCIES $ $ 593,379.69 Total Roadway Item 36,196,161.24
© Copyright 2026 Paperzz