Earthwork Quantity Unit Unit Price Item Cost Section Cost Roadway

Earthwork
Roadway Excavation
Imported Borrow
Clearing and Grubbing
Develop Water Supply
Top Soil Reapplication
Stepped Slopes and Slope Retainign wall
Quantity
Pavement Structural
PCC PAVEMENT(__DEPTH)
PCC PAVEMENT(__DEPTH)
ASPHALT CONCRETE
LEAN CONCRETE BASE
CEMENT-TREATED BASE
AGGREGATE BASE
TREATED PERMEABLE BASE
AGGREGATE SUB BASE
PAVEMENT REINFORCING FABRIC
EDGE DRAINS
Quantity
798288
500000
1
1
0
4455
0
0
1227
0
1604
0
0
SPECIALTY ITEMS
Quantity
RETAINING WALLS
NOISE BARRIERS
BARRIERS AND GAURDRAILS
EQUIPMENT/ANIMAL
WATER POLLUTION CONTROL
HAZARDOUS WASTE INVESTIGATION AND/OR MITIGATION WORK
ENVIRONMENTAL
RESIDENT ENGINEER OFFICE SPACE
TRAFFIC ITEMS
LIGHTING
TRAFFIC DELINEATION
TRAFFIC SIGNALS
OVERHEAD SIGN
ROADSIDE SIGN
TRAFFIC CONTROL SYSTEMS
TRANSPORTATION MANAGEMENT PLAN
TEMPORARY DETECTION SYSTEM STAGING
Quantity
ROADSIDE MANAGEMENT AND SAFTEY SECTION
VEGETATION CONTROL TREATMENTS
GORE AREA PAVEMENT
PAVEMENT BEYOND THE GORE AREA
MISCELLANEOUS PAVING
EROSION CONTROL
SLOPE PROTECTION
Quantity
Unit
CY
CY
LS
LS
?
?
Unit Price
$
$
$
$
$
$
16.80
16.40
38,828.00
100,000.00
16.80
16.80
Unit
CY
Unit Price
$
$
$
$
$
$
$
$
$
$
160.00
2.00
40.00
52.00
-
SQYD
CY
CY
??
??
Unit
CY
0
LF
0
1 LS
?
?
?
Unit
36
4
24
4
1
1
Unit
Unit Price
$
$
$
$
$
?
?
?
Unit Price
$
$
$
$
$
$
$
$
Unit Price
$
$
$
$
$
$
Item Cost
$
13,411,238.40
$
8,200,000.00
$
38,828.00
$
100,000.00
$
$
0
0
Item Cost
$
$
$
8,910.00
$
$
$
49,080.00
$
$
83,408.00
$
$
-
Section Cost
$
UNIT PRICE SET
COULD NOT FIND UNIT PRICE
NEED TO UPDATE UNIT PRICE
Section Cost
$
Item Cost
Section Cost
328.00 $
$
$
27.00 $
$
2,000.00 $
2,000.00
#VALUE!
#VALUE!
#VALUE!
100,000.00
16.80
250,000.00
15.00
200.00
110,000.00
3,000.00
30,000.00
16.80
16.80
16.80
16.80
16.80
16.80
Item Cost
Section Cost
$
3,600,000.00 $
$
$
1,000,000.00
$
$
4,800.00
$
440,000.00
$
3,000.00
$
30,000.00
Item Cost
``
$
$
$
$
$
Section Cost
$
-
21,750,066.40
141,398.00
2,355.00
5,077,800.00
184.80
SIDE SLOPES/EMBANKMENT
MAINTENANCE VEHICLE PULL OUTS
OFF-FREEWAY ACCESS
ROADSIDE FACILITIES
RELOCATING ROADSIDE
$
$
$
$
$
16.80
16.80
16.80
16.80
16.80
Minor Items
-
$
26,971,804.20
Total Minor Items
$
$
29,668,984.62
Total Roadway mobilization
$
2,966,898.46
ROADWAY MOBILIZATION
ROADWAY ADDITIONS
$
$
$
$
$
2,697,180.42
Total Roadway Additions
$
2,966,898.46
CONTIGENCIES
$
$
593,379.69
Total Roadway Item
36,196,161.24