Planned Restrictions to Traffic Movement 15 July 2016 update

Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
Ward
Promoter
Bell Street
(between Victoria
Street and Mander
Centre service
basement car park)
Type of work
Start date
Estimated
completion
date
Delivery access
01
Feb
2016
April
2017
Type of traffic control
Lane
restrictions
Temp.
signals


Temp.
Times of
closure restrictions

24 hrs
Comments / diversion route
Lane restriction.
Vehicular diversion route for
access to Mander Centre car
park: Skinner Street, School
Street, Salop Street, Cleveland
Street, Bell Street.
St. Peter’s
Private
Construction
works
06
August
07
August

 
24 hrs
Bell Street between the Mander
Centre car park and its junction
with Cleveland Street will be
made two way to provide access
to the Mander Centre service
basement and car park.
3-way temporary traffic signals
will operate at the jct of
Cleveland Street, Bell Street and
Summer Row.
Birmingham New
Road
(jct of Shaw Road)
Birmingham New
Road
(jct of Shaw Road)
Bradley Lane
(between the
humpback bridge /
Wilkinson Street)
WCC
Trial holes
18
July
29
July
Spring Vale
WCC
Highway
construction
works
01
August
March
2017
Bilston East
National Grid
Gas
Gas main
replacement
01
April
02
Sept
Spring Vale



The Cleveland Street bus lane
will not be in operation during
the closure to permit access to
the Mander Centre car park.
Lane restrictions in operation.
9.30 am – Weekdays only.
3.30 pm

9.30 am –
3.30 pm
Lane restrictions in operation.


Rolling temporary traffic signals.
NETWORK IMPACT:
HIGH
MEDIUM
LOW



24 hrs
Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
Bradmore Road
(jct of Jeffcock
Road)
Bridgnorth Road
(closed (both sides)
between Wightwick
Bank and The
Holloway)
Broad Lanes /
Ladymoor Road
(jct of Highfields
Road)
Broad Lane South
(between Pool
Hayes Lane /
Thirston Close)
Bushbury Lane /
Elston Hall Lane /
Kempthorne
Avenue Island
Ward
Promoter
Type of work
Start date
Estimated
completion
date
Graiseley /
Park
Western
Power
Distribution
Essential electrical
works
31
July
31
July
Tettenhall
Wightwick
Lane
restrictions
Temp.
signals
Temp.
Times of
closure restrictions
Comments / diversion route
3-way temporary traffic signals.
Carriageway
resurfacing works
WCC
Type of traffic control
08
August
19
August






Sunday
only
Vehicular diversion route:
Bridgnorth Road, Jenny Walkers
Lane, Wrottesley Park Road,
Holyhead Road, Wergs Road,
9.30 am –
The Rock, Henwood Road and
3.30 pm
vice versa.
Monday – Friday restricted
working hours only.
3-way temporary traffic signals.
Bilston East
WCC
Highway
construction
works
08
July
08
August
Wednesfield
South
Severn Trent
Water
Short comm pipe
repair
27
July
27
July
31
July
31
July
07
August
07
August



24 hrs

9.30 am 3.30 pm
Signals in intermittent use.
2-way temporary traffic signals.
Bushbury
South & Low
Hill
Bushbury Lane
Bushbury
(between Elston Hall
South & Low
Lane and Fordhouse
Hill
Road)
Cable Street
(outside unit 4-5)
Ettingshall
NETWORK IMPACT:
HIGH
Carriageway
resurfacing works
WCC





WCC
Carriageway
resurfacing works
01
August
12
August



Severn Trent
Water
Install fire hydrant
03
August
05
August



MEDIUM
LOW
7 am –
6 pm
Vehicular diversion route:
Bushbury Lane, Underhill Lane,
Cannock Road, Stafford Street,
Stafford Road, Three Tuns Lane,
Elston Hall Lane and vice versa.
Sunday only.
Vehicular diversion route:
9.30 am – Fordhouse Road, Elston Hall
3.30 pm Lane and vice versa.
2-way temporary traffic signals.
24 hrs
Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
Carder Crescent
(outside no.6)
Church Hill
(closed (both
directions) between
its jct with Lea
Manor Drive and
Vicarage Road)
Coppice Road
(jct of Fir Tree Road)
Fir Tree Road
Ward
Bilston East
Penn
Promoter
Type of work
Start date
Estimated
completion
date
Kier
Drainage diversion
of existing
foul/storm sewer
01
August
01
September
National Grid
Gas
Type of traffic control
Lane
restrictions
Temp.
signals
Temp.
Times of
closure restrictions
Comments / diversion route
2-way temporary traffic signals.
Gas main
replacement
15
August
31
August






24 hrs
24 hrs
Vehicular diversion route:
Vicarage Road, Penn Road,
Church Hill and vice versa.
Multi-way temporary traffic
signals.
Merry Hill
Uplands Avenue
(jct of Fir Tree Road
/ Highlands Road)
Corn Hill
(closed Mill Street
Bridge to Network
Rail car park
entrance)
Heath Town
NETWORK IMPACT:
HIGH
Western
Power
Distribution
WCC
Network
improvement
Void found in
carriageway
MEDIUM
28
July
Dec
2015
(extension
to order)
LOW
Sept
2016
(TBC)
Jan
2017






24 hrs
Rolling temporary signals will
operate along Fir Tree Road
starting on Coppice Road at the
jct of Fir Tree Road to Uplands
Avenue.
Vehicular diversion route: At the
jct of Sun Street/Wednesfield
Road, Wednesfield Road, Ring
Road St Davids, Horseley Fields
to the jct of Corn Hill diversion
ends.
24 hrs
At the jct of Horseley Fields/Corn
Hill, Horseley Fields, Middle
Cross, Bilston Street Island, Ring
Road St David’s, Wednesfield
Road to the jct of Sun Street
diversion ends.
Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
Ward
Promoter
Type of work
Start date
Estimated
completion
date
Type of traffic control
Lane
restrictions
Temp.
signals
Temp.
Times of
closure restrictions
Coseley Road
(between Millfields
Road / Black
Country Route)
Coseley Rd/Black
Country Route
Island
Black Country
Route (between
Springvale Way /
Bankfield Road)
Dickens Road
(outside no. 48)
Gloucester Street
(jct of Chester
Street)
Lane restrictions in place as part
of a phased scheme of works.
Speed restrictions in operation.
Ettingshall /
Bilston East
Highway
construction
works
WCC
11
Jan
2016
30
Oct
2016



9.30 am –
3.30 pm
27
July
29
July



24 hrs
Fallings Park
Severn Trent
Water
Long comm pipe
repair
03
August
05
August



St. Peter’s
National Grid
Gas
Gas main
replacement
18
July
12
August



24 hour lane restrictions in
operation.
2-way temporary traffic signals.
3-way temporary traffic signals.
24 hrs
Green Park Avenue
(jct of Lime Grove)
Green Park Avenue
(jct of Wolseley
Road)
Hazel Road
(closed (both sides)
outside no. 33 Hazel
Road to its jct with
Victoria Road)
Comments / diversion route
3-way temporary traffic signals.
Bilston North
Graiseley
NETWORK IMPACT:
HIGH
National Grid
Gas
National Grid
Gas
Gas main
replacement
28
July
Gas main
replacement
MEDIUM
21
July
LOW
26
August
04
August






24 hrs
The signals will operate in two
separate phases.
24 hrs
Vehicular diversion route:
Oxbarn Avenue, Victoria Road
and vice versa.
Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
High Street,
Wednesfield
(pedestrian zone)
Hordern Road
(at canal bridge)
Ward
Promoter
Type of work
Start date
Estimated
completion
date
Wednesfield
South
Severn Trent
Water
New clean water
connection
07
August
14
August
07
August
14
August
WCC
Highway
construction
works
01
Aug
28
Oct
Severn Trent
Water
Short comm pipe
repair
01
August
01
August
Severn Trent
Water
Defective
reinstatement
27
July
27
July
Park / St.
Peter's /
Tettenhall
Regis
Lower Villiers
Street
Blakenhall
(between Mason St /
Milford Rd)
Mount Road
(between Belmont
Penn
Road / Westbourne
Road - outside no. 4)
Old Heath Road
(railway bridge
East Park
between Ashbourne
Road / Brickheath
Road)
Oxford Street/High
Street
Bilston East
(jct of Great Bridge
Road)
Oxley Moor Road
(closed at the
railway bridge)
Oxley /
Tettenhall
Regis
Paget Road
(jct of Hatton Road)
Park
NETWORK IMPACT:
HIGH
Type of traffic control
Lane
restrictions

Temp.
signals

Temp.
Times of
closure restrictions

Sunday
only
Comments / diversion route
Vehicular diversion route:
Neachells Lane, Alfred Squire
Road and vice versa.
2-way temporary traffic signals.



9 am –
3 pm
Monday – Saturday 9 am – 3 pm
Stop/Go boards



1 day

9.30 am –
3.30 pm
2-way temporary traffic signals.


2-way temporary traffic signals.
Network Rail
Bridge
examination
31
July
31
July
Western
Power
Distribution
Emergency works
repair to high
voltage cable
24
July
27
July



7.30 am –
3.30 pm
3-way temporary traffic signals.



24 hrs
WCC
Demolition works
25
July
31
July



24 hrs
National Grid
Gas
Low pressure gas
main replacement
28
July
26
August



24 hrs
MEDIUM
LOW
Vehicular diversion route:
Aldersley Road, Lower Street,
Tettenhall Road, Chapel Ash,
Chapel Ash Island, Ring Road
St Andrews, Ring Road St
Peters, Stafford Street, Stafford
Road, Oxley Moor Road and vice
versa.
3-way temporary traffic signals.
Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
Penn Road
(between Hollybush
Lane / Church Hill –
inbound and
outbound
Piper Road / Bhylls
Crescent
(closed (both sides)
between the jct of
The Avenue / no. 56,
Bhylls Crescent)
Stirling Road
(at the jct of Bradley
Lane)
Sutherland Place
(closed at its junction
with Vicarage Road)
The Avenue
(closed (both sides)
between the jct of
Castlecroft Road to
Piper Road)
Ward
Penn
Merry Hill
Promoter
Western
Power
Distribution
Type of work
Start date
Estimated
completion
date
Type of traffic control
Lane
restrictions
Temp.
signals
Temp.
Times of
closure restrictions
Comments / diversion route
Lane restrictions inbound and
outbound.
Install new cable
30
July
31
July



24 hrs
Weekend working only.
Please also see The Avenue,
Penn
Vehicular diversion route: The
Avenue, Bhylls Lane and vice
versa.
Severn Trent Replace and install
Water
new sewer
13
June*
02
Oct*



24 hrs
Bilston East
National Grid
Gas
Gas main
replacement
01
August
14
August



24 hrs
Ettingshall
Private
Safety zone
06
August
2016
06
February
2018



24 hrs
*The scheme will operate in three
separate phases, please see:
1) Castlecroft Road/The Avenue COMPLETE
2) The Avenue – currently in
operation
3) Piper Road/Bhylls Crescent
Vehicular diversion route:
Bradley Lane, Wallace Road,
Stirling Road and vice versa.
Vehicular diversion route:
Castlecroft Road, Bhylls Lane
and vice versa.
Merry Hill
NETWORK IMPACT:
HIGH
Severn Trent Replace and install
Water
new sewer
MEDIUM
LOW
13
June*
02
Oct*



24 hrs
*The scheme will operate in three
separate phases, please see:
1) Castlecroft Road/The Avenue COMPLETE
2) The Avenue – currently in
operation
3) Piper Road/Bhylls Crescent
Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
Ward
Promoter
Type of work
Start date
Estimated
completion
date
Type of traffic control
Lane
restrictions
Temp.
signals
Temp.
Times of
closure restrictions
The Avenue will be made
one way only to permit vehicles
to be driven on the following
length of road one way:
The Avenue
Penn
Trysull Road
(jct of Trysull
Gardens)
Vicarage Road
(closed (both sides)
between its junction
with The Avenue
and Wheathill Close)
Walsall Street /
Lower Walsall
Street
(between
Commercial Road /
Lower Horseley
Fields)
Wood Road
(jct of Foley Avenue)
Comments / diversion route
Merry Hill
Penn
Western
Power
Distribution
Severn Trent
Water
National Grid
Gas
Install new cable
New connection
Gas main
replacement
30
July
26
July
25
July
31
July
01
August
08
August









24 hrs
· The Avenue from its jct with
Penn Road to its jct with
Vicarage Road in a southern
direction.
No right turn from Penn Road
(north/east direction) to The
Avenue – traffic diverted Penn
Road, Penn Road Island, Penn
Road to access The Avenue.
3-way temporary traffic signals.
24 hrs
24 hrs
Vehicular diversion route:
Church Hill, Penn Road, Vicarage
Road and vice versa.
Rolling temporary traffic signals.
East Park
Tettenhall
Wightwick
Western
Power
Distribution
Install new
electricity cable
National Grid Low pressure gas
Gas
mains replacement
EVENTS:
NETWORK IMPACT:
HIGH
MEDIUM
LOW
25
July
September
2016



24 hrs
04
August
04
September



24 hrs
3-way temporary traffic signals.
Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16)
Location
Dickinson Avenue
(closed (both sides)
between Low Hill
Crescent and
Whitgreave
Avenue/Leacroft
Avenue roundabout)
Ward
Promoter
Bushbury
South & Low
Hill
Type of work
NETWORK IMPACT:
HIGH
27
July
EVENT
PUBLIC RIGHT OF WAY – FOOTPATH CLOSURES
Parkview Road,
Cherrywood Green,
Church Green
Bilston North
Private
Public Right of Way
footpath closure
Reedham Gardens
Public Right of Way
footpath closure
Penn
Start date
WCC
Utility service
works
Engineering works
for proposed
residential
development
MEDIUM
Estimated
completion
date
LOW
25
July
29
June
Type of traffic control
Lane
restrictions

25
Jan
2017
29
Dec
2016


Temp.
signals



Temp.
Times of
closure restrictions
am –
 8.304 pm


24 hrs
24 hrs
Comments / diversion route
Vehicular diversion route:
Leacroft Avenue, Hammond
Avenue and vice versa.
Pedestrians diverted via
Parkview Road, Church Green,
Green Park Drive, Cherrywood
Green and vice versa.
Access will be maintained from
Reedham Gardens along the
footpath for approximately 51
meters. From this point the
remaining length of footpath will
be closed for approximately 107
meters.
Pedestrians will be diverted onto
an alternative pedestrian route
on the site during the footpath
closure.