Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location Ward Promoter Bell Street (between Victoria Street and Mander Centre service basement car park) Type of work Start date Estimated completion date Delivery access 01 Feb 2016 April 2017 Type of traffic control Lane restrictions Temp. signals Temp. Times of closure restrictions 24 hrs Comments / diversion route Lane restriction. Vehicular diversion route for access to Mander Centre car park: Skinner Street, School Street, Salop Street, Cleveland Street, Bell Street. St. Peter’s Private Construction works 06 August 07 August 24 hrs Bell Street between the Mander Centre car park and its junction with Cleveland Street will be made two way to provide access to the Mander Centre service basement and car park. 3-way temporary traffic signals will operate at the jct of Cleveland Street, Bell Street and Summer Row. Birmingham New Road (jct of Shaw Road) Birmingham New Road (jct of Shaw Road) Bradley Lane (between the humpback bridge / Wilkinson Street) WCC Trial holes 18 July 29 July Spring Vale WCC Highway construction works 01 August March 2017 Bilston East National Grid Gas Gas main replacement 01 April 02 Sept Spring Vale The Cleveland Street bus lane will not be in operation during the closure to permit access to the Mander Centre car park. Lane restrictions in operation. 9.30 am – Weekdays only. 3.30 pm 9.30 am – 3.30 pm Lane restrictions in operation. Rolling temporary traffic signals. NETWORK IMPACT: HIGH MEDIUM LOW 24 hrs Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location Bradmore Road (jct of Jeffcock Road) Bridgnorth Road (closed (both sides) between Wightwick Bank and The Holloway) Broad Lanes / Ladymoor Road (jct of Highfields Road) Broad Lane South (between Pool Hayes Lane / Thirston Close) Bushbury Lane / Elston Hall Lane / Kempthorne Avenue Island Ward Promoter Type of work Start date Estimated completion date Graiseley / Park Western Power Distribution Essential electrical works 31 July 31 July Tettenhall Wightwick Lane restrictions Temp. signals Temp. Times of closure restrictions Comments / diversion route 3-way temporary traffic signals. Carriageway resurfacing works WCC Type of traffic control 08 August 19 August Sunday only Vehicular diversion route: Bridgnorth Road, Jenny Walkers Lane, Wrottesley Park Road, Holyhead Road, Wergs Road, 9.30 am – The Rock, Henwood Road and 3.30 pm vice versa. Monday – Friday restricted working hours only. 3-way temporary traffic signals. Bilston East WCC Highway construction works 08 July 08 August Wednesfield South Severn Trent Water Short comm pipe repair 27 July 27 July 31 July 31 July 07 August 07 August 24 hrs 9.30 am 3.30 pm Signals in intermittent use. 2-way temporary traffic signals. Bushbury South & Low Hill Bushbury Lane Bushbury (between Elston Hall South & Low Lane and Fordhouse Hill Road) Cable Street (outside unit 4-5) Ettingshall NETWORK IMPACT: HIGH Carriageway resurfacing works WCC WCC Carriageway resurfacing works 01 August 12 August Severn Trent Water Install fire hydrant 03 August 05 August MEDIUM LOW 7 am – 6 pm Vehicular diversion route: Bushbury Lane, Underhill Lane, Cannock Road, Stafford Street, Stafford Road, Three Tuns Lane, Elston Hall Lane and vice versa. Sunday only. Vehicular diversion route: 9.30 am – Fordhouse Road, Elston Hall 3.30 pm Lane and vice versa. 2-way temporary traffic signals. 24 hrs Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location Carder Crescent (outside no.6) Church Hill (closed (both directions) between its jct with Lea Manor Drive and Vicarage Road) Coppice Road (jct of Fir Tree Road) Fir Tree Road Ward Bilston East Penn Promoter Type of work Start date Estimated completion date Kier Drainage diversion of existing foul/storm sewer 01 August 01 September National Grid Gas Type of traffic control Lane restrictions Temp. signals Temp. Times of closure restrictions Comments / diversion route 2-way temporary traffic signals. Gas main replacement 15 August 31 August 24 hrs 24 hrs Vehicular diversion route: Vicarage Road, Penn Road, Church Hill and vice versa. Multi-way temporary traffic signals. Merry Hill Uplands Avenue (jct of Fir Tree Road / Highlands Road) Corn Hill (closed Mill Street Bridge to Network Rail car park entrance) Heath Town NETWORK IMPACT: HIGH Western Power Distribution WCC Network improvement Void found in carriageway MEDIUM 28 July Dec 2015 (extension to order) LOW Sept 2016 (TBC) Jan 2017 24 hrs Rolling temporary signals will operate along Fir Tree Road starting on Coppice Road at the jct of Fir Tree Road to Uplands Avenue. Vehicular diversion route: At the jct of Sun Street/Wednesfield Road, Wednesfield Road, Ring Road St Davids, Horseley Fields to the jct of Corn Hill diversion ends. 24 hrs At the jct of Horseley Fields/Corn Hill, Horseley Fields, Middle Cross, Bilston Street Island, Ring Road St David’s, Wednesfield Road to the jct of Sun Street diversion ends. Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location Ward Promoter Type of work Start date Estimated completion date Type of traffic control Lane restrictions Temp. signals Temp. Times of closure restrictions Coseley Road (between Millfields Road / Black Country Route) Coseley Rd/Black Country Route Island Black Country Route (between Springvale Way / Bankfield Road) Dickens Road (outside no. 48) Gloucester Street (jct of Chester Street) Lane restrictions in place as part of a phased scheme of works. Speed restrictions in operation. Ettingshall / Bilston East Highway construction works WCC 11 Jan 2016 30 Oct 2016 9.30 am – 3.30 pm 27 July 29 July 24 hrs Fallings Park Severn Trent Water Long comm pipe repair 03 August 05 August St. Peter’s National Grid Gas Gas main replacement 18 July 12 August 24 hour lane restrictions in operation. 2-way temporary traffic signals. 3-way temporary traffic signals. 24 hrs Green Park Avenue (jct of Lime Grove) Green Park Avenue (jct of Wolseley Road) Hazel Road (closed (both sides) outside no. 33 Hazel Road to its jct with Victoria Road) Comments / diversion route 3-way temporary traffic signals. Bilston North Graiseley NETWORK IMPACT: HIGH National Grid Gas National Grid Gas Gas main replacement 28 July Gas main replacement MEDIUM 21 July LOW 26 August 04 August 24 hrs The signals will operate in two separate phases. 24 hrs Vehicular diversion route: Oxbarn Avenue, Victoria Road and vice versa. Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location High Street, Wednesfield (pedestrian zone) Hordern Road (at canal bridge) Ward Promoter Type of work Start date Estimated completion date Wednesfield South Severn Trent Water New clean water connection 07 August 14 August 07 August 14 August WCC Highway construction works 01 Aug 28 Oct Severn Trent Water Short comm pipe repair 01 August 01 August Severn Trent Water Defective reinstatement 27 July 27 July Park / St. Peter's / Tettenhall Regis Lower Villiers Street Blakenhall (between Mason St / Milford Rd) Mount Road (between Belmont Penn Road / Westbourne Road - outside no. 4) Old Heath Road (railway bridge East Park between Ashbourne Road / Brickheath Road) Oxford Street/High Street Bilston East (jct of Great Bridge Road) Oxley Moor Road (closed at the railway bridge) Oxley / Tettenhall Regis Paget Road (jct of Hatton Road) Park NETWORK IMPACT: HIGH Type of traffic control Lane restrictions Temp. signals Temp. Times of closure restrictions Sunday only Comments / diversion route Vehicular diversion route: Neachells Lane, Alfred Squire Road and vice versa. 2-way temporary traffic signals. 9 am – 3 pm Monday – Saturday 9 am – 3 pm Stop/Go boards 1 day 9.30 am – 3.30 pm 2-way temporary traffic signals. 2-way temporary traffic signals. Network Rail Bridge examination 31 July 31 July Western Power Distribution Emergency works repair to high voltage cable 24 July 27 July 7.30 am – 3.30 pm 3-way temporary traffic signals. 24 hrs WCC Demolition works 25 July 31 July 24 hrs National Grid Gas Low pressure gas main replacement 28 July 26 August 24 hrs MEDIUM LOW Vehicular diversion route: Aldersley Road, Lower Street, Tettenhall Road, Chapel Ash, Chapel Ash Island, Ring Road St Andrews, Ring Road St Peters, Stafford Street, Stafford Road, Oxley Moor Road and vice versa. 3-way temporary traffic signals. Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location Penn Road (between Hollybush Lane / Church Hill – inbound and outbound Piper Road / Bhylls Crescent (closed (both sides) between the jct of The Avenue / no. 56, Bhylls Crescent) Stirling Road (at the jct of Bradley Lane) Sutherland Place (closed at its junction with Vicarage Road) The Avenue (closed (both sides) between the jct of Castlecroft Road to Piper Road) Ward Penn Merry Hill Promoter Western Power Distribution Type of work Start date Estimated completion date Type of traffic control Lane restrictions Temp. signals Temp. Times of closure restrictions Comments / diversion route Lane restrictions inbound and outbound. Install new cable 30 July 31 July 24 hrs Weekend working only. Please also see The Avenue, Penn Vehicular diversion route: The Avenue, Bhylls Lane and vice versa. Severn Trent Replace and install Water new sewer 13 June* 02 Oct* 24 hrs Bilston East National Grid Gas Gas main replacement 01 August 14 August 24 hrs Ettingshall Private Safety zone 06 August 2016 06 February 2018 24 hrs *The scheme will operate in three separate phases, please see: 1) Castlecroft Road/The Avenue COMPLETE 2) The Avenue – currently in operation 3) Piper Road/Bhylls Crescent Vehicular diversion route: Bradley Lane, Wallace Road, Stirling Road and vice versa. Vehicular diversion route: Castlecroft Road, Bhylls Lane and vice versa. Merry Hill NETWORK IMPACT: HIGH Severn Trent Replace and install Water new sewer MEDIUM LOW 13 June* 02 Oct* 24 hrs *The scheme will operate in three separate phases, please see: 1) Castlecroft Road/The Avenue COMPLETE 2) The Avenue – currently in operation 3) Piper Road/Bhylls Crescent Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location Ward Promoter Type of work Start date Estimated completion date Type of traffic control Lane restrictions Temp. signals Temp. Times of closure restrictions The Avenue will be made one way only to permit vehicles to be driven on the following length of road one way: The Avenue Penn Trysull Road (jct of Trysull Gardens) Vicarage Road (closed (both sides) between its junction with The Avenue and Wheathill Close) Walsall Street / Lower Walsall Street (between Commercial Road / Lower Horseley Fields) Wood Road (jct of Foley Avenue) Comments / diversion route Merry Hill Penn Western Power Distribution Severn Trent Water National Grid Gas Install new cable New connection Gas main replacement 30 July 26 July 25 July 31 July 01 August 08 August 24 hrs · The Avenue from its jct with Penn Road to its jct with Vicarage Road in a southern direction. No right turn from Penn Road (north/east direction) to The Avenue – traffic diverted Penn Road, Penn Road Island, Penn Road to access The Avenue. 3-way temporary traffic signals. 24 hrs 24 hrs Vehicular diversion route: Church Hill, Penn Road, Vicarage Road and vice versa. Rolling temporary traffic signals. East Park Tettenhall Wightwick Western Power Distribution Install new electricity cable National Grid Low pressure gas Gas mains replacement EVENTS: NETWORK IMPACT: HIGH MEDIUM LOW 25 July September 2016 24 hrs 04 August 04 September 24 hrs 3-way temporary traffic signals. Wolverhampton City Council: Planned restrictions to traffic movements (update 26/07/16) Location Dickinson Avenue (closed (both sides) between Low Hill Crescent and Whitgreave Avenue/Leacroft Avenue roundabout) Ward Promoter Bushbury South & Low Hill Type of work NETWORK IMPACT: HIGH 27 July EVENT PUBLIC RIGHT OF WAY – FOOTPATH CLOSURES Parkview Road, Cherrywood Green, Church Green Bilston North Private Public Right of Way footpath closure Reedham Gardens Public Right of Way footpath closure Penn Start date WCC Utility service works Engineering works for proposed residential development MEDIUM Estimated completion date LOW 25 July 29 June Type of traffic control Lane restrictions 25 Jan 2017 29 Dec 2016 Temp. signals Temp. Times of closure restrictions am – 8.304 pm 24 hrs 24 hrs Comments / diversion route Vehicular diversion route: Leacroft Avenue, Hammond Avenue and vice versa. Pedestrians diverted via Parkview Road, Church Green, Green Park Drive, Cherrywood Green and vice versa. Access will be maintained from Reedham Gardens along the footpath for approximately 51 meters. From this point the remaining length of footpath will be closed for approximately 107 meters. Pedestrians will be diverted onto an alternative pedestrian route on the site during the footpath closure.
© Copyright 2026 Paperzz