list of addendum items notice to bidders: this addendum #1 forms a

Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
LIST OF ADDENDUM ITEMS
NOTICE TO BIDDERS: THIS ADDENDUM #1 FORMS A PART OF THE INVITATION
FOR BID 16-008, STREETSCAPE PROJECT – NEW MACLAND RD, MARIETTA ST,
AND POWDER SPRINGS RD, AND MODIFIES THE ORIGINAL VERSION AS
FOLLOWS:
ITEM 1
Questions and Answer (Q & A)
1. Please clarify the 12' callout for the hatching striping at station 214+00. page C8?
Answer: Added pay item for 12 In. Thermo.
2. What is the width for the double yellow, thermoplastic striping at Station 202+50
,Page C6?
Answer: 5 Inch.
3. Will the stamped concrete need to be integral or a concrete color hardener?
Answer: Integral
4. Regarding Line Item #999-0000, Replace mailbox with decorative mailbox, Qty,8
No. No any details found.,
Answer: Replace with like kind.
5. How many pedestrian lights will be installed by Georgia Power?
Answer: Approximately 86
6. On the sheet 16, sidewalk plan, the detail of the section A is missing.
Answer: See addendum 1 added section A.
7. Is there a cross section of the thermoplastic crosswalk?
Answer: No
8. For the curb and gutter, how the asphalt topping, pavement reinforcement fabric,
class B concrete and GAB is going to be pay?
Answer: The detail calling for this has been deleted. The asphalt will be sawcut
and the curb poured to the existing asphalt. There is a pay item for GAB
IFB# 16‐008 Addendum #1 Initial _________ Page 1 of 9 Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
9. On powder springs sd. The pressure wash and graffiti treatment is referring to
the parapet walls over the bridge or to the modular block walls under the bridge?
Answer: The parapet walls not the modular walls.
10. Regarding Line Item #999-00000, Cross Walks (Thermoprint HT), Qty, 674
SY.No any Cross Sectional Details found. Can you favor me to provide Sectional
details?
Answer: There are no cross section detail for this and none is needed.
11. On Drg#C16-Design Details Plan, Sidewalk Plan Details, describes, Metromont
Pavers 6 CM Holland Stone Red.Is it Brick Pavers or Concrete Paver? How it will
be paid?
Answer: Include in the square yard price for sidewalk.
12. Const Drg# C3, C7 & C10, describes, Stamped Color Conc 6” Thick. Bid
Schedule Line Item#439-0018, Concrete Ped Island 8 In Stamped Red. Which
one is correct?
Answer: 6 inch.
13. Our concrete sidewalk takeoff is 500sy under the bid item quantity. (sidewalk)
Answer: Quantity will remain as is.
14. Pay item 610-2700 states: Remove and dispose of existing sidewalk, topsoil, ect.
To 4" depth. What does etc. include?
Answer: Everything to a depth of 4 inches.
15. No demo of curb on typicals
Answer: Not needed. Will be done as directed by the engineer.
16. The bid item description for the concrete pedestrian island states that it is 8". Thw
drawings state that they are 6".
Answer: 6 Inch
17. Any specs on the decorative mailboxes?
Answer: Replace with like kind.
18. Pole at 106.5 is not addressed on Plans
Answer: Pole will remain. Sidewalk will be installed to avoid the pole as directed
by the engineer.
IFB# 16‐008 Addendum #1 Initial _________ Page 2 of 9 Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
19. Do ADA tiles have to be placed the full length of type 3 Ramps
Answer: Yes
20. Can cast-in-place ADA tiles be used?
Answer: Yes
21. Driveway concrete not shown on plans
Answer: Will be done as directed by the engineer.
22. Please clarify Remove & Dispose of existing curb & gutter & where?
Answer: Will be done as directed by the engineer.
23. Please clarify 24" L-Back curb & gutter & where
Answer: See plans at Old Austell Road and will be as directed by the engineer.
24. Does Curb go around pedestrian islands And if so is this a separate pay item.
Answer: No
25. Please clarify the location of item 999-0000 500 LF
Answer: Will be as directed by the engineer.
26. Can not find Hollandstone red for colored concrete is tile red suitable.
Answer: No
27. Can rings & cover be reused or does Powder Springs have special covers.
Answer: reuse ring and covers.
28. The callouts for the pedestrian islands in the drawings calls for 6 inches while the
bid item 439-0018 calls for 8 inches. Please clarify.
Answer: 6 Inch
29. Will the sidewalks north between stations 201+50 to 202+50 and north between
stations and between stations 208+00 to 212+00 and south between stations
IFB# 16‐008 Addendum #1 Initial _________ Page 3 of 9 Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
214+50 to 217+00 have the 2' wide stamped concrete strip. There are callouts
but it is not shown on the drawings. Please clarify.
Answer: There will be a 2 ft wide stamped concrete strip in these areas.
30. There is hatching striping on station 214+00 page C8 but there is not a line item
for Hatching in the bid form. Where is the contractor to allocate this cost?
Answer: Line item has been added.
31. There is a line item for Driveway Concrete 6 in thick but there are not any new
driveways in the drawings? Please clarify where the new driveways will be
installed
Answer: Will be as directed by the engineer.
32. Where is the contractor to install details - "Standard Concrete Curb With Street
Patch Detail" , "Sidewalk Plan" , "Concrete Paving Section" , "Typical Sidewalk
Section "B"" , "Typical Sidewalk Section "C" Through Paver Band" .
Answer: Standard concrete curb with street patch detail has been deleted. Typical
sidewalk section B and C as shown on plans.
33. Who is the manufacturer or brand for the ADA pavers?
Answer: Not specified use GDOT approved manufacturer.
34. GDOT Standard crosswalks usually require 8in striping while the detail on page
calls for 12" striping. Please advise contractor which width to install
Answer: 8 Inch.
35. Regarding the Bid # 16-008 Streetscape Project New Macland Rd, Marietta St
and Powder Springs Rd, we would like to know if a specific form for the bid bond
is required or what forms are accepted for this bid?
Answer: AIA form is acceptable.
36. The note on page C9 says "Existing bridge parapet walls to be pressure
washed," while the callout points to the modular block wall. The modular block
wall is dirtier than the parapet walls. Please clarify which wall the contractor
should pressure wash.
Answer: Parapet walls not modular walls.
IFB# 16‐008 Addendum #1 Initial _________ Page 4 of 9 Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
37. Is the Substrate for the ThermoPrintHT concrete or asphalt?
Answer: Asphalt
38. Regarding Line Item 441-0016-Driveway Concrete 6 In Thick, Qty, 250 SY. No
locations shown on plans. At which Locations, Driveway Concrete needs to be
constructed? Please, describe the locations on Plans.
Answer: Will be done at the direction of the engineer.
39. Regarding Line Item Pressure wash parapet walls & paint with anti-graffiti
treatment. Qty 1 LS. There are two Locations described. Second Location On
Sht#C9-Sht#9, Existing two Modular Block Walls needs to be Pressure wash &
paint with anti-graffiti treatment? Or Exist Bridge Parapet wall w/Decorative
Fence on either side of Bridge, needs to be done above treatment?. Please,
Clarify which walls needs to be done above treatment?
Answer: Parapet walls does not include modular walls.
40. For pay Item 999-000 "Pressure wash parapet walls & paint with anti-graffiti
treatment", the plans call out parapet walls on New Macland road, and modular
wall below road at Powder Springs road. Please confirm the extent of areas to
be treated.
Answer: Parapet walls does not include modular walls.
41. Do we have a preferred manufacturer for the decorative mailboxes.
Answer: Replace mailboxes with like kind.
42. Based on the detail it shows the entire sidewalk having a concrete base topped
with pavers. Is this the case? If not could you provide a new sidewalk detail..
Answer: See Addendum 1 sidewalk section A
43. Could you provide a detail for the 6 In. concrete island?
Answer: No detail. 6 inch island according to plan doweled into existing pavement.
44. Is the GAB under the 24 inch curb and gutter? If so what is the depth?
Answer: Yes 6 inches.
45. The bid schedule calls for an 8 inch concrete pedestrian island, stamped red.
However the plans call for a 6 inch concrete pedestrian island, stamped red, .
Would you please specify the depth of the island?
Answer: 6 Inch.
46. The bid schedule calls for 250 sy of 6 inch driveway concrete, this does not
reflect on the plans. Could you specify which driveways are in the scope?
Answer: As directed by the engineer.
IFB# 16‐008 Addendum #1 Initial _________ Page 5 of 9 Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
47. The bid schedule has all thermoplastic striping as one pay item. Could you break
this down into the different colors and sizes?
Answer: See revised bid form addendum 1.
IFB# 16‐008 Addendum #1 Initial _________ Page 6 of 9 Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
ITEM 2
Pre Bid Meeting Minutes
IFB# 16‐008 Addendum #1 Initial _________ Page 7 of 9 Streetscape Project
New Macland Rd, Marietta St and Powder Springs Rd
IFB 16-008
December 28, 2016
10:00 a.m.
Pre-Bid Agenda
1. Introductions
2. Project Description
3. Contract Documents
Bid Package
1. Bid Opening – January 11th, 2017 @ 10:00 a.m. City Hall at 4484 Marietta
Street
2. Contract time - 180 days
3. Bid Inquiries must be submitted by 5 PM, Thursday, January 05, 2017
Submit to [email protected]
4. General Requirements
 GDOT prequalified Contractors
 Contractor to self-perform at least 50 percent of the work
5. Bid Proposal Docs
6. Construction Plans – Available at City of Powder Springs website
4. Addendums
Addenda will be available on City of Powder Springs website
5. Q&A
1. DBE requirements? None
2. Start time? Projected in March
3. When will Addendum #1 be released? First of next week
4. Is GDOT Prequalified required? Yes
5. Are the quantities correct? Some are larger then take off
6. Will the estimate be released? No
7. Bonding requirements? Follow instructions in the IFB 16-008 Documents
8. What are the work hours? (M-F 7:00 AM – 6:00 PM) (Saturday 9:00 AM – 6:00 PM with
permission. Must be requested by Thursday at noon.) Lane closures are only allowed from
9:00 AM until 4:00 PM
9. Bid requirements? Follow IFB 16-008 Documentation fully when submitting the bid
Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
ITEM 3
Revised Bid Proposal Form
See Attached
IFB# 16‐008 Addendum #1 Initial _________ Page 8 of 9 BID PROPOSAL FORM
CONTRACTOR NAME: ___________________________________________
1.
DATE: ____________________
BASE BID:
Pursuant to and in compliance with the Advertisement for Bids and the Specifications relating to:
PROJECT NAME: Streetscape Project – New Macland Rd, Marietta St and Powder Springs Rd.
BID NUMBER: 16-008
including Addenda (list addenda, if any)
, the undersigned, having become thoroughly familiar with terms and
conditions of the specifications and with local conditions affecting the performance, progress and cost of the work that is to be completed, hereby proposes
and agrees to fully perform the work within the one hundred eighty (180) days timeframe stated and in accordance with the specifications including
furnishing any or all services, labor, materials, and equipment authorized by the City and to do all the work required to complete said work in accordance
with the specifications for the following unit prices:
Item Number 150‐1000 210‐0100 441‐6216 610‐2700 999‐0000 653‐1804 653‐1502 653‐1504 439‐0010 439‐0014 IFB #16-008
Description Traffic control Grading, all inclusive of clearing, grubbing, removal of all obstructions, excavation, borrow, adjust existing valves and meters to grade, incl. all materials, equipment, and labor Remove and dispose of existing 24" concrete curb and gutter Remove and dispose of existing concrete sidewalk, topsoil, ect to 4" depth Crosswalks (Thermoprint HT) Thermoplastic striping 8 In. (crosswalks, stop bars) Thermoplastic striping 5 In. solid yellow Thermoplastic striping 12 In. solid white Stamped Concrete 2 Ft Wide x 4 In Thick Stamped Red Concrete Pedestrian Island 6 In. Stamped Red Quantity Unit 1 LS Unit Price Bid Price 1 LS 335 LF 4675 674 1470 300 60 1560 270 SY SY LF LF LF SY SY Initial _________
Page 1 of 3
Item Number 441‐0104 441‐6216 310‐5060 999‐0000 999‐0000 999‐0000 444‐1000 165‐0010 163‐0550 163‐0240 999‐0000 999‐0000 999‐0000 999‐0000 441‐0016 700‐9300 999‐0000 Description 4" thick concrete sidewalk (width varies, see plans) 24" L‐Back concrete curb and gutter Graded Agg. Base 6 in. under curb and gutter Remove and Replace 24 " Concrete Curb & Gutter Handicap‐accessible sidewalk ramp Pressure wash parapet walls & paint with anti‐graffiti treatment Sawcut existing pavement Type A silt fence (including all materials, labor, equipment, and maintenance of silt fence throughout the project) Inlet sediment trap Sd2 (curb inlet protection) Mulch (including all materials, labor, equipment, and maintenance) Relocate street sign Replace mailbox with inkind mailbox Replace Double Wing Conc. Catch Basin Lids Replace Single Wing Conc. Catch Basin Lids Driveway Concrete 6 In. Thick Placement of Sod on all disturbed areas Construction Contingency Total Base Bid Price
IFB #16-008
Quantity Unit 4300 SY 365 LF 350 SY 500 LF 63 EA Unit Price Bid Price 1 1776 LS LF 8600 38 LF EA 5 17 8 4 18 250 24650 TN EA EA EA EA SY SF 100,000.00
$_____________________________________
Initial _________
Page 2 of 3
Bidder __________________________________________________________
Name ___________________________________________________________
Signature ________________________________________________________
Titles ____________________________________________________________
Date _____________________________________________________________
Enclosed is a bid bond in the amount of 5% of the total bid price or ($___________________________) IFB #16-008
Initial _________
Page 3 of 3
Streetscape Project
New Macland Rd, Marietta St, and Powder Springs Rd
Addendum #1
IFB 16-008
ITEM 4
Revised Detail Sheet
See Attached IFB# 16‐008 Addendum #1 Initial _________ Page 9 of 9 REVISION REFERENCE
FE
DRAWN BY
SHEET 16
AL
O
GSWCC CERT #58037
SHEET TITLE
DESIGN DETAILS
CHECKED BY
PTL
SCALE
ISSUE DATE
N.T.S.
1/5/17
PROJECT NUMBER
1476.03
DRAWING NUMBER
C16
of
26
Drawing Location: A:\1476.03 Powder Spring Streetscape\02-Engineering\Design\1476.03 Design.dwg
PR
NO.
DATE
SEAL
SS I O
N
NOT ISSUED FOR CONSTRUCTION
LAND LOT(S) 830, 871, 872, 873, 904, 905
OF THE 19TH DISTRICT, 2ND SECTION
CITY OF POWDER SPRINGS, COBB COUNTY COUNTY, GA
NEW MACLAND & POWDER SPRING ROAD
POWDER SPRINGS STREETSCAPE
Plot Scale: 1"=###', Drawing Rotation: ###
Design.ctb, Plotted By: Phillip Krause on 1/5/2017, 11:16 AM
THESE PLANS AND DRAWINGS ARE NOT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT FIRST OBTAINING THE EXPRESS
WRITTEN PERMISSION AND CONSENT OF CROY ENGINEERING, LLC, NOR ARE THEY TO BE ASSIGNED TO ANY PARTY WITHOUT WRITTEN PERMISSION AND CONSENT.