Application Form - Attachment - E1

EPA Export 25-07-2013:16:08:42
Co
to
f c Fo
op r i
yr ns
ig pe
ht ct
ow ion
ne pu
r r rp
eq os
ui es
re o
d nl
fo y.
ra
ny
ns
en
se
ru
he
ot
.
ATTACHMENT
E.l- EMISSIONS TO ATMOSPHERE
E.l.A Details of all Point Emissions to Atmosphere
The summary list of emission points are detailed in Table 1 below.
ru
se
.
Each of the emissions to atmosphere,detailed in table 1 below can be identified on the accompanying drawings included in attachment
E.l. 1. These drawings have the EPA Emission Points depicted in large red text. The keyplan location in the top right hand comer
indicates the building within the site that the specific drawing reflects.
Description
Al-2
Boiler Stack 05-HT07-BOO2
Elase Chem. Weigh Room No. 169
Extract EF5/1
Dispensary Single Pass Booth Discharge
A2-1
83-3
Co
Al-l
Boiler Stack 05-HT07-BOO1
1 RnnmNn
lW”lll
EI
--.L
A3-1
A3-2
A3-3
A3-4
A3-5
A3-6
I-“.
A7
-.a
Boiler Stack 47 - Main Boiler House
Boiler Stack 48 - Main Boiler House
CHP Generator Exhaust
Plant Room Diesel Generator
1 MW Diesel Generator Exhaust
Extract from Diesel Fire Pump
Building
Ackmpanied
Drawing
Reference
Note on Emission Point
CUE3
OS/H.GA/IPPCOl
CUB
OS/H.GA/IPPCOl
Prod Building 1
OlIH.GA/IPPCOl
Part of Expansion Project.
Not installed to date
Part of Expansion Project.
Not installed to date
ns
en
Emission
Point Number
to
f c Fo
op r i
yr ns
ig pe
ht ct
ow ion
ne pu
r r rp
eq os
ui es
re o
d nl
fo y.
ra
ny
ot
he
Table 1: Emissions to Atmosphere from the Pfizer Ireland Pharmaceuticals Facility
1 Pr,yj
Rllildinp
-_---I------
Prod Building
Prod Building
Prod Building
Prod Building
Prod Building
Pump House
1-
I fI1
/U
“A,IA.“IUAA
/*,A/TPPt7ll
I
VVI
I
Th ic nnint
I
LYY
will
he rmmnvwl
in r)7.-3.l)Mi
1 Ol/H.GA/IPPCOl
1 Ol/H.GA/IPPCOl
*esent
1 Ol/H.GA/IPPCOl
Not in use
1 Ol/H.GA/IPPCOl
H.GAITPPCOl
1 -Ol/ _____
- ___ - _- 1, Not in use at mesent
Ol/H.GA/IPPCOl 1
I
EPA Export 25-07-2013:16:08:42
ATTACHMENT
E.l
IPPC Application 750
Emission
Point Number
Description
Building
Accompanied
Drawing
Reference
Note on Emission Point
Ol/H.GA/IPPCOl
Prod Building 1
Ol/H.GA/IPPCOl
Prod Building 1
Ol/H.GA/IPPCOl
A3-10
Biotech Lab Bio-Safety Cabinet
Prod Building 1
Ol/H.GA/IPPCOl
A3-11
Biotech Lab Bio-Safety Cabinet
Prod Building 1
Ol/H.GA/IPPCOl
A3-12
A3-13
A3-14
Ol/H.GA/IPPCOl
Ol/H.GA/IPPCOl
Ol/H.GA/IPPCOl
OlIH.GA/IPPCOl
Ol/H.GA/IPPCOl
Not in use at present
This point will be removed in Q2-2006
A3-17
Prod Building 1
Biotech Lab Bio-Safety Cabinet
Prod Building 1
Powder Containment Room Suite 3
Fume Extract ‘La Calhene’ Room 222
Prod Building 1
Buffer Pren Vessel Extract Room 23 Suite
Prod Building 1
ampling Booth Discharge QCI
Prod Building 1
Elase ProcessRoom No 165 Extract
Prod Building 1
EF5/2
Ol/H.GA/IPPCOl
A3-18
Diesel 850kva Generator exhaust
Prod Building 1
Ol/H.GA/IPPCOl
A3-19
Dispensary Fume Hood AC 1%FA02
Warehouse
03/H.GA/IPPCOl
A3-20
QC Sampling Fume Hood Exh AC (tbc)
03/H.GA/IPPC02
A3-21
Gas Boiler Stack HTl I-BROl
Warehouse
Personnel
Support
Facility
Not in use at present
Part of Expansion Project.
Not installed to date
Part of Expansion Project.
Not installed to date
Part of Expansion Project.
Not installed to date
Part of Expansion Project.
Not installed to date
se
ru
to
f c Fo
op r i
yr ns
ig pe
ht ct
ow ion
ne pu
r r rp
eq os
ui es
re o
d nl
fo y.
ra
ny
Co
ns
en
I
A3-15
A3-16
ot
he
A3-8
.
Prod Building 1
A3-9
Fume Cupboard in HPLC Lab Room No.
218
Bio Chem Lab Fume Cupboards(3 No.)
Room No. 224
Tech Services Lab Fume Cupboard Room
No. 219
A3-7
04/H.GAIIPPCOl
Not in use at present
To be modified for use as Fume Hood in the
new Pegylation Process
To be modified for use as Fume Hood in the
new Pegylation Process
To be modified for use as Fume Hood in the
new Pegylation Process
This point will be removed in Q2-2006
EPA Export 25-07-2013:16:08:42
ATTACHMENT
E.1
IPPC Application 750
A3-26
HPLC Cart Box Fume Ext AC25-FA03
A3-27
Bio-Safety Cabinet Ext AC24-FA04
A3-28
Stabilitv Lab Fume Hood AC26-FA02
.
A3-25
Gas Fire Calorifier WSO1-WHO2
HPLC Lab Fume Cupboard Ext AC25FA02
se
A3-24
Part of Expansion Project.
04/H.GA/IPPCOl Not installed to date
Part of Expansion Project.
OLC/H.GA/IPPCOl Not installed to date
Part of Expansion Project.
04/H,GA/IPPCOl Not installed to date
Part of Expansion Project.
04/H,GA/IPPCOl Not installed to date
Part of Expansion Project.
04/H.GA/IPPCOl Not installed to date
Part of Expansion Project.
Not installed to date
04/H.GMPPCOl
Part of Expansion Project.
04/H.GA/IPPCOl Not installed to date
ru
Gas Boiler Stack HTl l-BR03
Personnel
Support Facility
Personnel
Support Facility
Personnel
Support Facility
Personnel
Support Facility
Personnel
Support Facility
Personnel
Support Facility
Personnel
Support Facility
he
A3-23
Note on EmissionPoint
ot
Gas Boiler Stack HTl l-BR02
Accompanied
Drawing
Reference
ns
en
A3-22
Building
to
f c Fo
op r i
yr ns
ig pe
ht ct
ow ion
ne pu
r r rp
eq os
ui es
re o
d nl
fo y.
ra
ny
Emission
Description
Point Number
Co
Please note that the existing 2 x Boiler emission points (Boiler 47 and Boiler 48), emission points A3-1 and A3-2 respectively, which
operate on a duty and standby basis are classified as minor emissions as the boilers are less than 5 MW and their monitored emissions,
as reported in the Pfizer Ireland Pharmaceuticals AER Report 2005, were less than 20% of the BAT Guidance Note for the Chemical
Sector threshold.
EPA Export 25-07-2013:16:08:42
ATTACHMENT
E.1
IPPC Application 750
The following drawings listed in Table 2 are also included in attachment E.1.2 to detail the emission elevations and relevant roof
heights. As with previously, the keyplan location in the top right hand comer indicates the building within the site that the specific
drawing reflects.
Table 2: Emission elevations and Roof Heights of Air Emission Points
1Building
he
ru
se
.
CUB
Prod Building 1
Warehouse
Warehouse
Warehouse
PSF
to
f c Fo
op r i
yr ns
ig pe
ht ct
ow ion
ne pu
r r rp
eq os
ui es
re o
d nl
fo y.
ra
ny
CUB North and East Elevations
Existing Building - Admin South and East Elevations
WarehouseNorth Elevation
WarehouseEast & West Elevation
WarehouseCross Section B-B
Personnel Support Facilitv
ot
1Description
E.l.B Fugitive Emissions
1Accompanied
Drawing Reference
05/A.EL/OOO1
Ol/A.EL/OOOl
03/A.EL/OOOl
03/A.EL/OOO1
03/A.EL/OOO1
04/A.EL/OOO1
ns
en
The summary list of fugitive and possible air emission points are listed in Table 3 below.
Co
Each of these emission could result from leaks from valve seals/pump seals/flanges,loading operations or working and breathing
losses. The emissions have not been quantified in kg/hr or mgMn3 concentrations in Table E.l(v): Emissions to atmosphere Potential atmospheric emissions emissions to atmosphere of the IPPC Licence application as this data was not available. However the
worst case scenario in each case is the release of the headspacecontained in the tank, therefore in this table I have included the
capacity of the specific tanks/ containers and the substancescontained within them.
Each of the potential and fugitive emission points detailed in table 3 below can be identified on the accompanying drawing
OO/H.GA/IPPC05 included in attachment E.1.3. These drawings have the EPA Emission Points depicted in large red text. The
keyplan location in the top right hand corner indicates the building within the site that the specific drawing reflects.
EPA Export 25-07-2013:16:08:42
ATTACHMENT E.l
IPPC Application 750
Table 3: Fugitive and Potential Emissions to Atmosphere from the Pfizer Ireland Pharmaceuticals Facility
Building
Accompanied
Drawing
Reference
Effluent Dosing
Hut
Effluent Dosing
Hut
External Diesel
Bunded Tanks stored internally in the
Effluent Dosing Hut
Bunded Tanks stored internally in the
Effluent Dosing Hut
Part of Expansion Project.
Not installed to date
Bunded 1OOOLIBC stored internally in the
Plant Room ( Production Buildingl)
Bunded 1OOOLIBC stored internally in the
Plant Room ( Production Buildingl)
Part of Expansion Project.
OO/H.GA/IPPCO5
Not installed to date
Part of Expansion Project.
Not installed to date
Part of Expansion Project.
Not installed to date
Part of Expansion Project.
Not installed to date
I
Caustic Tank (Effluent Dosing)
A4-2
Acid Tank (Effluent Dosing)
A4-3
Diesel Tank (Existing)
A4-4
Caustic Tank CD1Water Svstem)
to
f c Fo
op r i
yr ns
ig pe
ht ct
ow ion
ne pu
r r rp
eq os
ui es
re o
d nl
fo y.
ra
ny
Production
Production
A4-7
Acid Tank (Effluent Dosing)
A4-8
Caustic Tank (DI Water System)
A4-9
A4-10
A4-11
Acid Tank (DI Water System)
Diesel Tank (New facility - Generator
Back-up)
Diesel Tank(New facility - Boiler
1Back-up)
m
-1
ns
en
A4-6
Acid Tank (DI Water System)
Caustic Tank (Effluent Dosing New
Facility)
Co
A4-5
he
ru
se
A4-1
Note on Emission Point
.
Description
ot
Emission
Point Number
Dosing Tanks
External Diesel
Tank
External Diesel
Tank
l
EPA Export 25-07-2013:16:08:42