Formula: (Road Length in Meters X Road Width = Total m2) X

CALCIUM CHLORIDE DUST CONTROL APPLICATION CHART
ROADWAY LENGTHS
ROADWAY WIDTH TOTAL m2
Miles
0.0625
0.1250
0.1875
0.2500
0.3125
0.3750
0.4375
0.5000
0.5625
0.6250
Kilometres
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Meters
100
200
300
400
500
600
700
800
900
1000
MILES
KILOMETRES
LITRES PER m2
0.0625
0.1250
0.1875
0.2500
0.3125
0.3750
0.4375
0.5000
0.5625
0.6250
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
MILES
KILOMETRES
LITRES PER m2
0.0625
0.1250
0.1875
0.2500
0.3125
0.3750
0.4375
0.5000
0.5625
0.6250
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
5m (16.4 ft)
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
6m (19.7 ft)
600
1200
1800
2400
3000
3600
4200
4800
5400
6000
7m (23 ft)
700
1400
2100
2800
3500
4200
4900
5600
6300
7000
8m (26.2 ft)
800
1600
2400
3200
4000
4800
5600
6400
7200
8000
9m (29.5 ft)
900
1800
2700
3600
4500
5400
6300
7200
8100
9000
10m (32.8 ft)
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
APPLICATION RATE OF 1.5 LITRES PER m2
750
1500
2250
3000
3750
4500
5250
6000
6750
7500
900
1800
2700
3600
4500
5400
6300
7200
8100
9000
1050
2100
3150
4200
5250
6300
7350
8400
9450
10500
1200
2400
3600
4800
6000
7200
8400
9600
10800
12000
1350
2700
4050
5400
6750
8100
9450
10800
12150
13500
1500
3000
4500
6000
7500
9000
10500
12000
13500
15000
APPLICATION RATE OF 2.0 LITRES PER m2
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1200
2400
3600
4800
6000
7200
8400
9600
10800
12000
1400
2800
4200
5600
7000
8400
9800
11200
12600
14000
1600
3200
4800
6400
8000
9600
11200
12800
14400
16000
1800
3600
5400
7200
9000
10800
12600
14400
16200
18000
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
Formula: (Road Length in Meters X Road Width = Total m2) X (Application Rate) = Total Litres Required
CALCIUM CHLORIDE DUST CONTROL APPLICATION CHART
ROADWAY LENGTHS
ROADWAY WIDTH TOTAL m2
Miles
0.0625
0.1250
0.1875
0.2500
0.3125
0.3750
0.4375
0.5000
0.5625
0.6250
Kilometres
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Meters
100
200
300
400
500
600
700
800
900
1000
MILES
KILOMETRES
LITRES PER m2
0.0625
0.1250
0.1875
0.2500
0.3125
0.3750
0.4375
0.5000
0.5625
0.6250
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
MILES
KILOMETRES
LITRES PER m2
0.0625
0.1250
0.1875
0.2500
0.3125
0.3750
0.4375
0.5000
0.5625
0.6250
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
5m (16.4 ft)
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
6m (19.7 ft)
600
1200
1800
2400
3000
3600
4200
4800
5400
6000
7m (23 ft)
700
1400
2100
2800
3500
4200
4900
5600
6300
7000
8m (26.2 ft)
800
1600
2400
3200
4000
4800
5600
6400
7200
8000
9m (29.5 ft)
900
1800
2700
3600
4500
5400
6300
7200
8100
9000
10m (32.8 ft)
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
APPLICATION RATE OF 2.5 LITRES PER m2
1250
2500
3750
5000
6250
7500
8750
10000
11250
12500
1500
3000
4500
6000
7500
9000
10500
12000
13500
15000
1750
3500
5250
7000
8750
10500
12250
14000
15750
17500
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
2250
4500
6750
9000
11250
13500
15750
18000
20250
22500
2500
5000
7500
10000
12500
15000
17500
20000
22500
25000
APPLICATION RATE OF 3.0 LITRES PER m2
1500
3000
4500
6000
7500
9000
10500
12000
13500
15000
1800
3600
5400
7200
9000
10800
12600
14400
16200
18000
2100
4200
6300
8400
10500
12600
14700
16800
18900
21000
2400
4800
7200
9600
12000
14400
16800
19200
21600
24000
2700
5400
8100
10800
13500
16200
18900
21600
24300
27000
3000
6000
9000
12000
15000
18000
21000
24000
27000
30000
Formula: (Road Length in Meters X Road Width) = Total m2 X (Application Rate) = Total Litres Required