M1, Melbourne, VIC MANAGED FREEWAYS A Holistic Approach for Fully Controlling Freeway Operations Managed Freeways provides a comprehensive approach to fully control freeway operations Managed Freeways rethinks the way we manage freeways Builds upon ITS, ATM, ICM and dynamic demand management tools of managed lanes. Provides a comprehensive package of strategies to fully control freeway access to manage demand and optimize traffic flows. M1, Melbourne, VIC Source: VicRoads Integrated Corridor Management shares some common elements with Managed Freeways ICM provides a framework for coordinating various ITS elements Incident management, adaptive ramp metering, arterial system integration and traveler information are integral elements of ICM Source: Alameda County Transportation Commission Integrated Corridor Management provides coordinated corridor management ICM can provide enhanced traveler information and facilitates coordinated response to congestion and incidents ICM does not typically synchronize freeway traffic flows to accomplish full control of corridor traffic operations Source: Caltrans Highly precise data and advanced system management tools are key to Managed Freeways Managed freeways synchronizes the flow of vehicles entering and exiting the freeway to those already on the freeway. Provides real time demand management to control traffic and optimize overall freeway efficiency STREAMS Interface Source: Transmax VicRoads Managed Motorways is the only proven strategy to reliably control freeway operations Managed freeways have minimized instability in traffic flows on M1: Integrated system ensures components work together to sustain traffic flows. Bottlenecks have been substantially eliminated. M1 Managed Motorway Speed Contour Plot (PM Peak Period Monash Motorway Outbound) Before Managed Freeways (2007) After Managed Freeways (2010) Legend Speed Ranges (km/h) M Source: VicRoads VicRoads Managed Motorways is the only proven strategy to reliably control freeway operations VicRoads M1 Managed Motorway has proven results M1 West Gate Freeway Traffic Flows (OctoberFlows 24,- 2014) WGF & PFW IB - Carriageway Wed 22/Oct/14 MMS 14821 EB - Werribee Main Rd On Ramp (ib) & Duncans Rd On Ramp (ib) 14494IB_L_P0 - Duncans Rd On Ramp (ib) & Princes Hwy Off Ramp (ib) MMS 14820 EB - Duncans Rd On Ramp (ib) & Princes Hwy Off Ramp (ib) up to 25% additional throughput MMS 14819 EB - Duncans Rd On Ramp (ib) & Princes Hwy Off Ramp (ib) MMS 14818 EB - Duncans Rd On Ramp (ib) & Princes Hwy Off Ramp (ib) MMS 14817 EB - Duncans Rd On Ramp (ib) & Princes Hwy Off Ramp (ib) MMS 14816 EB - Princes Hwy Off Ramp (ib) & Princes Hwy On Ramp (ib) MMS 14815 EB - Princes Hwy Off Ramp (ib) & Princes Hwy On Ramp (ib) MMS 14814 EB - Princes Hwy On Ramp (ib) & Forsyth Rd Off Ramp (ib) 14493IB_L_P0 - Princes Hwy On Ramp (ib) & Forsyth Rd Off Ramp (ib) MMS 14813 EB - Princes Hwy On Ramp (ib) & Forsyth Rd Off Ramp (ib) MMS 14811 EB - Forsyth Rd Off Ramp (ib) & Forsyth Rd On Ramp (ib) 14492IB_L_P0 - Princes Fwy West And Forsyth Rd On Ramp (ib) & Palmers Rd 14830IB_P0 - Princes Fwy West And Forsyth Rd On Ramp (ib) & Palmers Rd 14491IB_L_P0 - Palmers Rd Ramp & Princes Fwy West And Aviation Rd Off Ra MMS 14809 EB - Aviation Rd Off Ramp (ib) & Aviation Rd On Ramp (ib) MMS 14808 EB - Aviation Rd Off Ramp (ib) & Aviation Rd On Ramp (ib) MMS 14807 EB - Aviation Rd On Ramp (ib) & High St Off Ramp (ib) MMS 14806 EB - High St Off Ramp (ib) & High St On Ramp (ib) 14490IB_L_P0 - High St Off Ramp (ib) & High St On Ramp (ib) MMS 14805 EB - High St On Ramp (ib) & Old Geelong Rd Off Ramp (ib) MMS 14804 EB - High St On Ramp (ib) & Old Geelong Rd Off Ramp (ib) MMS 14803 EB - Old Geelong Rd Off Ramp (ib) & Kororoit Ck Rd Off Ramp ( MMS 14802 EB - Kororoit Ck Rd Off Ramp (ib) & Kororoit Ck Rd On Ramp (i MMS 14801 EB - Kororoit Ck Rd Off Ramp (ib) & Kororoit Ck Rd On Ramp (i MMS 14800 EB - Kororoit Ck Rd On Ramp (ib) & Split to WRR MMS 14105 EB - Kororoit Ck Rd On Ramp (ib) & Split to WRR MMS 14104 EB - Kororoit Ck Rd On Ramp (ib) & Split to WRR 7859IB_L_P0 - Join From Pfw And Wrr & Grieve Pde On Ramp (IB) 7857IB_L_P0 - Join From Pfw And Wrr & Grieve Pde On Ramp (IB) 7855IB_L_P0 - Grieve Pde On Ramp (ib) & Millers Rd Off Ramp (ib) 7854IB_L_P0 - Millers Rd Off Ramp (ib) & Millers Rd On Ramp (ib) 7853IB_L_P0 - Millers Rd Off Ramp (ib) & Millers Rd On Ramp (ib) 7852IB_L_P0 - Millers Rd On Ramp (ib) & Williamstown Rd Off Ramp (ib) 7851IB_L_P0 - Millers Rd On Ramp (ib) & Williamstown Rd Off Ramp (ib) 7850IB_L_P0 - Millers Rd On Ramp (ib) & Williamstown Rd Off Ramp (ib) 7781IB_L_P0 - Williamstown Rd Off Ramp (ib) & Williamstown Rd On Ramp (ib) 7782IB_L_P0 - Williamstown Rd Off Ramp (ib) & Williamstown Rd On Ramp (ib) 14429EB_P0 - Williamstown Rd On Ramp (ib) & Cook St Off Ramp (IB) 14428EB_P0 - Williamstown Rd On Ramp (ib) & Cook St Off Ramp (IB) 14427EB_P0 - Williamstown Rd On Ramp (ib) & Cook St Off Ramp (IB) 14426EB_P0 - Williamstown Rd On Ramp (ib) & Cook St Off Ramp (IB) 14408EB_L_P0 - Williamstown Rd On Ramp (ib) & Cook St Off Ramp (IB) 14427IB_P0 - Williamstown Rd On Ramp (ib) & Cook St Off Ramp (IB) 14409EB_L_P0 - West Gate Fwy And Cook St Off Ramp (ib) & Wgf Ln Add At Tod 14413EB_L_P0 - Western Link Tollway On Ramp & Ingles St Western Link Tollwa 14414EB_L_P0 - Western Link Tollway On Ramp & Ingles St Western Link Tollwa 14416EB_L_P0 - West Gate Fwy West Gate Fwy Off Ramp 14417EB_L_P0 - West Gate Fwy West Gate Fwy Off Ramp 14419EB_L_P0 - West Gate Fwy On Ramp West Gate Fwy 2 & West Gate Fwy 2 14421EB_L_P0 - W 14763OB_P0 - Power St On Ramp (eb) & Burnley St Off Ramp (eb - Fr 14764OB_P0 - Power St On Ramp (eb) & Burnley St Off Ramp (eb - Fr 14765OB_P0 - Power St On Ramp (eb) & Burnley St Off Ramp (eb - Fr 14766OB_P0 - Power St On Ramp (eb) & Burnley St Off Ramp (eb - Fr 14767OB_P0 - Power St On Ramp (eb) & Burnley St Off Ramp (eb - Fr 14768OB_P0 - Power St On Ramp (eb) & Burnley St Off Ramp (eb - Fr 14769OB_P0 - Power St On Ramp (eb) & Burnley St Off Ramp (eb - Fr #N/A #N/A during peak periods shorter overall travel times with delays reduced by up to 50% Improved travel reliability Improved safety with crashes Source: VicRoads 19:45 19:30 19:15 19:00 18:45 18:30 18:15 18:00 17:45 17:30 17:15 17:00 16:45 16:30 16:15 16:00 15:45 15:30 15:15 15:00 14:45 14:30 14:15 14:00 13:45 13:30 13:15 13:00 12:45 12:30 12:15 12:00 11:45 11:30 11:15 11:00 10:45 10:30 10:15 10:00 09:45 09:30 09:15 09:00 08:45 08:30 08:15 08:00 07:45 07:30 07:15 07:00 06:45 06:30 06:15 06:00 05:45 05:30 05:15 05:00 04:45 04:30 04:15 reduced by 20 to 50% 04:00 0-200 200-400 400-600 600-800 800-1000 1000-1200 1200-1400 1400-1600 1600-1800 1800-2000 2000-2200 2200-2400 2400-2600 2600-2800 2800-3000 3000-3200 3200-3400 3400-3600 3600-3800 3800-4000 4000-4200 4200-4400 4400-4600 4600-4800 4800-5000 5000-5200 5200-5400 5400-5600 5600-5800 5800-6000 6000-6200 6200-6400 6400-6600 6600-6800 6800-7000 7000-7200 7200-7400 7400-7600 7600-7800 7800-8000 8000-8200 8200-8400 8400-8600 8600-8800 8800-9000 9000-9200 9200-9400 9400-9600 9600-9800 9800-10000 10000-10200 Managed Freeways is getting growing interest in the United States Colorado and Utah DOT’s have undertaken initial feasibility assessments Managed freeways has been identified as a viable strategy for both candidate corridors I-25, Denver, CO Both agencies are seeking funding for initial deployments I-15, Salt Lake City, UT Initial evaluation shows great potential for Managed Freeways in the United States Preliminary results show the potential for managed freeways to effectively eliminate recurring congestion on I-15 Total trip times estimated to improve 11% Total delay estimated to be reduced 37% I-15 Managed Motorways Study Managed Freeways requires a paradigm shift in how we plan and manage freeways Managed freeways requires prioritization of the roadway hierarchy to maximize performance M80, Melbourne, VIC Freeways are our highest value and most productive roadway assets and should be prioritized as such A congested freeway is not a productive freeway Source: VicRoads Managed Freeways requires a paradigm shift in how we plan and manage freeways Freeway planning has typically been based on hourly corridor volumes Traffic flows are very volatile and can fluctuate greatly in very short periods of time Managed freeways optimizes traffic flows to match these fluctuations and avoid traffic flow breakdown 2400 2000 1600 Traffic flow (vphpl) 1200 800 400 0 0:00 2:00 4:00 6:00 8:00 10:00 1 minute 12:00 14:00 Hourly average 16:00 18:00 20:00 22:00 Managed Freeways requires a paradigm shift in how we plan and manage freeways 2500 2000 Flow (veh/h/lane) Uncontrolled freeways may achieve optimal flow rates for very short periods of time before breaking down Coordinated ramp metering controls the amount of traffic entering the freeway to prevent breakdown ATM elements help further fine tune traffic flows, especially during incidents 1500 1000 500 Managed freeways maintain flow rates at near optimal levels continuously Uncontrolled Freeway 0 0 10 20 30 40 50 60 70 Occupancy (% ) 2500 2000 Flow (veh/h/lane) 1500 1000 500 Managed Freeway 0 0 10 20 30 40 Occupancy (%) 50 60 70 Source: VicRoads “Managed Motorways is not a trivial matter” Markos Papageorgiou 2007 • Managed freeways is not a small stepwise change to existing ramp metering systems • It will require a commitment to a new paradigm • Managed freeways is a multi-faceted solution that involves new skill sets, communication systems, control systems, control engineering & optimization • These skills are not typically associated with DOT’s traditional functions • Unless you commit to all the critical elements of managed freeways you cannot achieve the full benefits Questions Darren Henderson WSP | Parsons Brinckerhoff (951) 833-7763 [email protected] M1, Melbourne, VIC Source: VicRoads
© Copyright 2026 Paperzz