Eagle Ford Shale: Accelerated® Increasing

CASE STUDY
Eagle Ford Shale: Accelerated® Increasing Production
UNDERSTANDING THE CHALLENGE
IDENTIFYING THE RIGHT SOLUTION
Rod Pump Challenges in The Eagle Ford Shale:
• Deviation caused wear and tear on tubing
• Paraffin and H2S increased chemical expense
• Pad drilling and workovers
• Capital Intensive Program: AFE 350K
Accelerated artificial lift team was asked to evaluate and
make recommendations for hydraulic jet pumps that
may replace the operator’s current form of artificial lift.
After reviewing all of the wells, Accelerated selected 165
HP Natural Gas Drive Power Fluid Pumping Units with
2.375” jet pumps to be installed. Other components were
chosen based on each well’s individual characteristics and
problems. By varying each well’s downhole equipment
configuration, all of the challenges faced were addressed.
Gas Lift Challenges in The Eagle Ford Shale:
• Paraffin: Cooling effect due to gas injection
• Chemical was not reaching the bottom
• Compressor run times were short
• High tubing pressures
DELIVERING RESULTS
•
•
•
•
No wear and tear on tubing because the jet pump has no moving parts
Easy port for chemical application of corrosion inhibitor or H2S applications
Temperature on wells was maintained to prevent paraffin deposition
Multiple wells (jets) powered by a single pumping unit, which reduced capital needs
DURATION OF DAYS FLOWING
Eagle Ford Well #
AVERAGE PRODUCTION IN BPD
Previous Artifical Lift Hydraulic Jet Pump
Previous Artifical Lift Hydraulic Jet Pump
Increase %
H-RU #10H
301
67
242
310
28%
P-12
307
61
213
256
20%
GRAU #10H
313
55
118
188
59%
GSHU-12
320
48
138
200
45%
PHZU-10
340
28
167
247
48%
GU-12
356
12
130
242
86%
P-11
359
9
130
253
95%
About Dover Artificial Lift
Dover Artificial Lift, part of Dover Energy, offers a comprehensive line of artificial lift equipment, accessories and
services strategically designed to drive the operational excellence of each of our clients. We provide industry-leading
systems and components engineered to enhance the profitably of gas, plunger, rod lift, progressing cavity pump
applications and surface production, as well as state-of-the-art software and products in the well automation, analysis,
and optimization space.
As an organization dedicated to the needs of our clients, we place a consultative service and support approach at
the forefront of our operations. Driven by a team of veteran artificial lift experts, our mission is to deeply understand
the complex production challenges faced by well operators on a daily basis, and provide them the exact set of tools
needed to meet them as efficiently and effectively as possible.
Strengthened by the vast global footprint and tradition of excellence of our parent company, the Dover Corporation,
we are able to ensure that the products we provide – and more importantly – the people who make up our
organization, are the best the artificial lift industry.
doverals.com