00 EZ Shed™ PLEASE READ ALL INSTRUCTIONS AND HELPFUL HINTS CAREFULLY BEFORE CONSTRUCTION Tool eeded Quick Framer - Gambrel Roof ST MER SER I E 203 591-9032 - 30 -5 30 INSTRUCTIONS 1. Separate and stack all parts included in kit. STUD BRACKETS (12 pieces), “A” ANGLE BRACKETS (24 pieces) and “B” ANGLE BRACKETS (16 pieces) . Please refer to “A” or “B” stamped into each ANGLE BRACKET. Cut and mark all lumber to identify as stated in CUT LIST that corresponds to your structure size. Stack all lumber in separate areas. 2. In accordance with your size structure, nail BASE PLATE boards together overlapping ends to form structure base frame. (Picture #1) Use the pressure treated lumber for the bottom of the base frame to prevent rotting. Make sure base frame is square by measuring from corner to corner diagonally. 3. Using screws, attach STUD BRACKETS to outside of top base frame boards (Picture #2) using measurements listed on SIDE VIEW drawing of plans in accordance with your size structure. Measurements are to center of STUD BRACKETS. 4. 3(A-D) NOTE:STUD In orderBRACKETS to make sure each arch is built theto same, stand short 2”using x 4” scrap boards into RIDGE of each ANGLE BRACKET assembly. (Picture #3) . Attach (Picture #2) base frame measurements onBOARD plans.slotsMeasurements are toduring center of brackets Begin arch assembly by sliding two UPPER2RAFTER boards into toptop ANGLE BRACKET “A” and secure with screwswith through SQUARE Attach holes (for other proper screw alignment) 4(A.) . Begin arch assembly by sliding RAFTERS into ANGLE BRACKET and secure screws. 2 in bracket. ANGLE to RAFTERS secure In order to make surethrough each square arch is built the same, stand 2x4 (B.) AttachBRACKETS two more “A” ANGLE BRACKETSand to ends of eachwith UPPERscrews. RAFTER board and secure with screws holes. (C.) Slidein LOWER RAFTER boardsslots into ends of each “A” and secure withassemble screws through square holes. the 2x4’s as alignment devices. RIDGE BOARD (Picture 3).ANGLE StackBRACKET the arches as you them using scraps (D.) Attach ANGLE BRACKET “B” to ends of each LOWER RAFTER boards and secure with screws through square holes. 5. After the ANGLE BRACKETS have been attached to one side of all arches, carefully turn arches over and attach 5. After ANGLE BRACKETS have been attached to one side of arch assembly, carefully turn arch over, leaving scrap boards in place in RIDGE BOARD slots. ANGLE BRACKETS to other side while using the alignment devices mentioned in step 4. Then attach left and right 6. Repeat steps # 4 (A) through (D) attaching ANGLE BRACKETS to other side of arch and secure using screws through the ROUND holes (for proper screw alignment) in STUDS to RAFTERS and secure ANGLE BRACKETS. Continue assembling theusing requiredscrews. number of arches according to your structure size. 7. Slide left and right STUDS into end of each ANGLE BRACKET “B” and secure using screws through ROUND holes. Carefully turn arch assembly over and secure ANGLE BRACKET “B” to STUDS using screws through SQUARE holes. Repeat this step on all arch assemblies. 8. Nail COLLAR TIE to LOWER RAFTER board of each arch assembly, making sure that the top corner of the COLLAR TIE is flush with the outside edge of LOWER RAFTER board. Be sure to attach the COLLAR TIES facing inside on the two end arches. 9. After all arch assemblies are complete, using two people carefully lift each arch onto the assembled base frame and secure to STUD BRACKETS using screws. Arches should be perpendicular to base frame (use a square). To hold the arches in a perpendicular position, use 1” x 4” temporary bracing inside of structure and leave in position until sheathing is in place, as shown in SIDE VIEW drawing. Leave nail heads slightly raised so they can be easily pulled out. The end arch assemblies should set flush with the base frame corners. Bend STUD BRACKETS around each corner of base frame and secure using screws. 10. After arch assemblies are set into place, remove scrap boards from “B” ANGLE BRACKET slots on one side of structure and place RIDGE BOARD into slots in “B” brackets. You may need to tap boards into place using a hammer. Repeat on opposite side of structure. Move up to lower ANGLE BRACKET “A” remove scrap boards and place RIDGE BOARD into slots in lower “A” brackets. Repeat on opposite side of structure. Remove scrap boards from top ANGLE BRACKET “A” and place RIDGE BOARD into slots in top “A” angle brackets. Make sure all arch assemblies are in correct positioning and adjust if needed. Secure all RIDGE BOARDS using screws through bottom holes in ANGLE BRACKETS. (For 10’ x 22’ structures, see #4 of Helpful Hints) 11. Install DOOR JAMBS as shown in FRONT VIEW drawings in accordance with your building size. Nail top of DOOR JAMBS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each DOOR JAMB. Attaching to outside of top BASE PLATE. 12. Install two VERTICAL STUDS in back wall. (Same layout as Step 11) Nail top of VERTICAL STUDS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each VERTICAL STUD. Attaching to outside of top BASE PLATE. 13. Your frame is now complete and ready to sheathe with materials of your choice. (See Helpful Hints) HELPFUL HINTS (ALL SIZES) 1. Install wall sheathing horizontally on sides of 7’X8’ building. Install wall sheathing vertically on ends of 7’X8’ building. Install all wall sheathing vertically on larger size buildings. Install roof sheathing horizontally on all building sizes. Save the pieces of sheathing that you cut off and use them elsewhere (such as the other side of the roof). Use completed arch as pattern to trace cut lines on sheathing for ends of building. 2. Roofing material may be metal, corrugated fiberglass, rolled roofing or shingles. 3. Doors can be cut from plywood sheathing. Outline each half with 1X4 boards to make them rigid. Screw hinges to door jambs. On larger buildings, full sheets of plywood may be used to construct 8’doors. 4. On 10’ x 22’ structures, stagger ridge board seams as follows: Start at front end of structure and place 16’ ridge board into slot in “B” brackets. (you may need to tap into place using a hammer) Move to back end of structure and place 6’ ridge board into slot in remaining “B” angle brackets. Repeat on opposite side of structure. At front end of structure, move up to lower angle bracket “A” and place the 6’ ridge board into slots in lower “A” angle brackets. Move to back end of structure and place 16’ ridge board into slots in remaining lower “A” angle brackets. Repeat on opposite side. At front end of structure, move up to top “A” angle bracket and place the 16’ ridge board into slots of top “A” angle brackets. Move to back end of structure and place the 6’ ridge board into slots in remaining top “A” angle bracket. Make sure all arch assemblies are in correct positioning and adjust if needed. Secure all ridge boards using screws through bottom holes in angle brackets. 5. Optional 1X4’s may be used as corner trim. 6. Sheathing may be installed above pressure treated base plates to prevent moisture damage. ST MT MER59937 SER •I1-406-253-5138 E 203 591-9032 30 1-800-880-3178 -5 30 415 Reservoir Road • Whitefish, or 1-406-250-7054 • Fax U.S. Patent #5,524,397 Canadian Patent #2,227,540 Stud Brackets /8" 4' 7-1 2' 1" cut to rs cut to 4" tuds to 2' Rafte X4 S 8 - 2 4 Lower fters cut ' 6-1/4" 5 ra X 8-2 pper ut to -1/2" X4 U llar ties c ut to 6' 3 -1/2" 8-2 o bs c o 6' 3 m t X4 C 4 - 2 4 Door ja tuds cut g X on ls 2-2 s 8' l ertica x4 V dge board ' long 2-2 i 8 6' 4" er lates X4 R " 5 - 2 4 Base p tes cut to or stiffen ut to 7’5 " 1 X la do sc 2-2 o 6' 1 ase p plate ing / x4 B mp. brac ted base ates cut t 2-2 a e pl X4 T essure tre ted base 4-1 r e trea X4 P 2 - 2 4 Pressur X 2-2 ') 4 -10 from -10') 2 (Cut from 0') (Cut rom 2 - 1 ') f 2 2-1 (Cut from ') (Cut rom 2 - 8 f ') (Cut rom 2 - 8 f (Cut ') 5-8 (Use - 8') 2 ') (Use rom 2 - 8 f (Cut ') 4 - 8 - 16') 1 (Use ') from (Cut rom 1 -16 f (Cut (6’ 4” long) g) ildin 8’ Bu (7’X LIST CUT Pictu re #1 Picture #2 Picture #3 (6’ 4” long) (6’ 4” long) Picture #2 Picture #2 /4" 6" to 5' 2' 8-1 s cut rs cut to ' 6" e Stud 2 2X4 r raft ut to 16 Uppe rafters c 6' 5-1/4" " 2X4 er t to u 16 c 3-1/2 Low 2X4 ollar ties cut to 7' 3-1/2" 16 bs 7' o m t X4 C 8 - 2 4 Door ja tuds cut g s n X 2-2 rtical 14' lo e x4 V se plates t to 7' 4" 2-2 a cu " ong l r 5 X4 B se plates 2-2 s 14' r stiffene ut to 13' " a c o 1 x4 B board 2 - 2 4 Ridge racing/do se plates ut to 7' 1 b X ba sc 5-2 ated emp. plate X4 T essure tre ted base 6-1 r e trea X4 P 2 - 2 4 Pressur X 2-2 2' ) 8-1 from - 12') 4 (Cut from 0') (Cut rom 4 - 1 f ") 8-8 (Cut from ') (Cut rom 2 - 8 f ') 2-8 (Cut from ') (Cut 4 2-1 ') (Use rom 2 - 8 f (Cut - 14') 5 (Use ') 6 - 8 - 16') 2 (Use from 6') (Cut rom 1 - 1 f (Cut ng) uildi 14’ B (8’X LIST CUT Picture #1 CUT LIST (8’X14’ Building) 16 - 2X4 Studs cut to 5' 6" 16 - 2X4 Upper rafters cut to 2' 8-1/4" 16 - 2X4 Lower rafters cut to 2' 6" 8 - 2X4 Collar ties cut to 6' 5-1/4" 2 - 2X4 Door jambs cut to 7' 3-1/2" 2 - 2x4 Vertical studs cut to 7' 3-1/2" 2 - 2X4 Base plates 14' long 2 - 2x4 Base plates cut to 7' 4" 5 - 2X4 Ridge boards 14' long 6 -from 1X44Temp. (Cut -10') bracing/door stiffener 2 2X4 Pressure (Cut from (Cut 4 -10') from 2 -10') treated base plates cut to 13' 5" 2 2X42Pressure (Cut from (Cut 2 -10') from - 10') treated base plates cut to 7' 11" (Cut from (Cut 2 - 10') from 2 - 12') (Cut from (Cut 2 - 12') from 2 - 8') Pictu re #2 (Cut from 4 -10') (Cut fromPicture 2 -10') #1 Picture #12 - 10') (Cut from (Cut from 2 - 12') (Cut from 2 - 8') (Cut from 2 - 8') (Use 5 - 8') (Use 2 - 8') (Cut from 2 - 8') (Use 4 - 8') 8 - 2X4 Studs cut to 4' 7-1/8" (Cut 1 8- 16') 8 - from 2X4 Studs cut to 4' 7-1/8" - 2X4 Lower Rafters cut to 2' 1" (Cut from 1 8 - 2X4 Lower Rafters cutrafters to 2' 1" 8-16') - 2X4 Upper cut to 2' 4" 8 - 2X4 Upper rafters cut ties to 2'cut 4" to 5' 6-1/4" 4 - 2X4 Collar 4 - 2X4 Collar tiesDoor cut tojambs 5' 6-1/4" 2 - 2X4 cut to 6' 3-1/2" CUT LIST (7’X8’ Building) CUT LIST (7’X8’ Building) ) 8 - 2X4 Studs cut to 4' 7-1/8" 8 - 2X4 Lower Rafters cut to 2' 1" 8 - 2X4 Upper rafters cut to 2' 4" 4 - 2X4 Collar ties cut to 5' 6-1/4" 2 - 2X4 Door jambs cut to 6' 3-1/2" 2 - 2x4 Vertical studs cut to 6' 3-1/2" 5 - 2X4 Ridge boards 8' long 2 - 2X4 Base plates 8' long 2 - 2x4 Base plates cut to 6' 4" 4 - 1X4 Temp. bracing / door stiffener 2 - 2X4 Pressure treated base plates cut to 7’5" 2 - 2X4 Pressure treated base plates cut to 6' 11" g ” lon (6’ 4 CUT LIST (7’X8’ Building) (Cut from 8 - 12') (Cut from 4 - 12') (Cut from 4 - 10') (Cut from 8 - 8") (Cut from 2 - 8') (Cut from 2 - 8') (Use 2 - 14') (Cut from 2 - 8') (Use 5 - 14') (Use 6 - 8')16 - 2X4 Studs cut to 5' 6" (Cut fromStuds 2 - -16') 16 - 2X4 cut to 5' 6"rafters cut to 2' 8-1/4" 16 2X4 Upper (Cut from 1 16 - 2X4 Upper rafters cut rafters to 2' 8-1/4" 16- -16') 2X4 Lower cut to 2' 6" 16 - 2X4 Lower rafters cutties to 2'cut 6"to 6' 5-1/4" 8 - 2X4 Collar 8 - 2X4 Collar tiesDoor cut tojambs 6' 5-1/4" 2 - 2X4 cut to 7' 3-1/2" CUT MATERIALS LIST Quick Framer - Gambrel Roof MATERIALS LIST (7’X8’ Building) GRADE #2 OR BETTER LUMBER IS RECOMMENDED 1— EZ Shed Instant Framing Kit 13 — 8’ 2X4’s 8— 10’ 2X4’s 2— 12’ 2X4’s 2— 16’ Pressure Treated 2X4’s 4— 8’ 1X4’s 9— 4X8 Sheets of sheathing material of your choice (plywood, waferwood, T-111 etc. ) 86 square feet of roofing material of your choice (metal, fiberglass, rolled roofing, shingles, etc.) 2# — 3” Nails (16d) 2# — 1-1/4” Deck screws MATERIALS LIST (8’X14’ Building) GRADE #2 OR BETTER LUMBER IS RECOMMENDED 2— EZ Shed Instant Framing Kits 14 — 8’ 2X4’s 4— 10’ 2X4’s 12 — 12’ 2X4’s 7— 14’ 2X4’s 3— 16’ Pressure Treated 2x4’s 6— 8’ 1X4’s 16 — 4X8 Sheets of sheathing material of your choice (plywood, waferwood, T-111 etc. ) 170 square feet of roofing material of your choice (metal, fiberglass, rolled roofing, shingles, etc.) 2# — 3” Nails (16d) 3# — 1-1/4” Deck screws MATERIALS LIST (10’X22’ Building) GRADE #2 OR BETTER LUMBER IS RECOMMENDED 3— EZ Shed Instant Framing Kits 49 — 8’ 2X4’s 18 — 10’ 2X4’s 3— 12’ 2X4’s 7— 16’ 2X4’ 4— 16’ Pressure Treated 2x4’s 10 — 8’ 1X4’s 28 — 4X8 Sheets of sheathing material of your choice (plywood, waferwood, T-111 etc. ) 330 square feet of roofing material of your choice (metal, fiberglass, rolled roofing, shingles, etc.) 4# — 3” Nails (16d) 5# — 1-1/4” Deck screws ST MER SER I E 203 591-9032 - 30 -5 30 Stud Brackets /8" 4' 7-1 2' 1" cut to rs cut to 4" tuds to 2' Rafte X4 S 8 - 2 4 Lower fters cut ' 6-1/4" 5 ra X 8-2 pper ut to -1/2" X4 U llar ties c ut to 6' 3 -1/2" 8-2 o bs c o 6' 3 m t X4 C 4 - 2 4 Door ja tuds cut g X on ls 2-2 s 8' l ertica x4 V dge board ' long 2-2 i 8 6' 4" er lates X4 R " 5 - 2 4 Base p tes cut to or stiffen ut to 7’5 " 1 X la do sc 2-2 o 6' 1 ase p plate ing / x4 B mp. brac ted base ates cut t 2-2 a e pl X4 T essure tre ted base 4-1 r e trea X4 P 2 - 2 4 Pressur X 2-2 ') 4 -10 from -10') 2 (Cut from 0') (Cut rom 2 - 1 ') f 2 2-1 (Cut from ') (Cut rom 2 - 8 f ') (Cut rom 2 - 8 f (Cut ') 5-8 (Use - 8') 2 ') (Use rom 2 - 8 f (Cut ') 4 - 8 - 16') 1 (Use ') from (Cut rom 1 -16 f (Cut (6’ 4” long) g) ildin 8’ Bu (7’X LIST CUT Pictu re #1 Picture #2 Picture #3 (6’ 4” long) (6’ 4” long) Picture #2 Picture #2 /4" 6" to 5' 2' 8-1 s cut rs cut to ' 6" e Stud 2 2X4 r raft ut to 16 Uppe rafters c 6' 5-1/4" " 2X4 er t to u 16 c 3-1/2 Low 2X4 ollar ties cut to 7' 3-1/2" 16 bs 7' o m t X4 C 8 - 2 4 Door ja tuds cut g s n X 2-2 rtical 14' lo e x4 V se plates t to 7' 4" 2-2 a cu " ong l r 5 X4 B se plates 2-2 s 14' r stiffene ut to 13' " a c o 1 x4 B board 2 - 2 4 Ridge racing/do se plates ut to 7' 1 b X ba sc 5-2 ated emp. plate X4 T essure tre ted base 6-1 r e trea X4 P 2 - 2 4 Pressur X 2-2 2' ) 8-1 from - 12') 4 (Cut from 0') (Cut rom 4 - 1 f ") 8-8 (Cut from ') (Cut rom 2 - 8 f ') 2-8 (Cut from ') (Cut 4 2-1 ') (Use rom 2 - 8 f (Cut - 14') 5 (Use ') 6 - 8 - 16') 2 (Use from 6') (Cut rom 1 - 1 f (Cut ng) uildi 14’ B (8’X LIST CUT Picture #1 CUT LIST (7’X8’ Building) CUT LIST (8’X14’ Building) 16 - 2X4 Studs cut to 5' 6" 16 - 2X4 Upper rafters cut to 2' 8-1/4" 16 - 2X4 Lower rafters cut to 2' 6" 8 - 2X4 Collar ties cut to 6' 5-1/4" 2 - 2X4 Door jambs cut to 7' 3-1/2" 2 - 2x4 Vertical studs cut to 7' 3-1/2" 2 - 2X4 Base plates 14' long 2 - 2x4 Base plates cut to 7' 4" 5 - 2X4 Ridge boards 14' long (Cut -10') bracing/door stiffener 6 -from 1X44Temp. (Cut from (Cut 4 -10') from 2 -10') 2 - 2X4 Pressure treated base plates cut to 13' 5" (Cut from (Cut 2 -10') - 10') treated base plates cut to 7' 11" 2 -from 2X42Pressure (Cut from (Cut 2 - 10') from 2 - 12') (Cut from (Cut 2 - 12') from 2 - 8') Pictu re #2 CUT LIST (7’X8’ Building) CUT LIST (7’X8’ Building) ) (Cut from 4 -10') (Cut fromPicture 2 -10') #1 Picture #12 - 10') (Cut from (Cut from 2 - 12') (Cut from 2 - 8') (Cut from 2 - 8') (Use 5 - 8') (Use 2 - 8') (Cut from 2 - 8') (Use 4 - 8') 8 - 2X4 Studs cut to 4' 7-1/8" (Cut 1 8- 16') 8 - from 2X4 Studs cut to 4' 7-1/8" - 2X4 Lower Rafters cut to 2' 1" (Cut from 1 8 - 2X4 Lower Rafters cutrafters to 2' 1" 8-16') - 2X4 Upper cut to 2' 4" 8 - 2X4 Upper rafters cut ties to 2'cut 4" to 5' 6-1/4" 4 - 2X4 Collar 4 - 2X4 Collar tiesDoor cut tojambs 5' 6-1/4" 2 - 2X4 cut to 6' 3-1/2" g ” lon (6’ 4 8 - 2X4 Studs cut to 4' 7-1/8" 8 - 2X4 Lower Rafters cut to 2' 1" 8 - 2X4 Upper rafters cut to 2' 4" 4 - 2X4 Collar ties cut to 5' 6-1/4" 2 - 2X4 Door jambs cut to 6' 3-1/2" 2 - 2x4 Vertical studs cut to 6' 3-1/2" 5 - 2X4 Ridge boards 8' long 2 - 2X4 Base plates 8' long 2 - 2x4 Base plates cut to 6' 4" 4 - 1X4 Temp. bracing / door stiffener 2 - 2X4 Pressure treated base plates cut to 7’5" 2 - 2X4 Pressure treated base plates cut to 6' 11" (Cut from 8 - 12') (Cut from 4 - 12') (Cut from 4 - 10') (Cut from 8 - 8") (Cut from 2 - 8') (Cut from 2 - 8') (Use 2 - 14') (Cut from 2 - 8') (Use 5 - 14') 16 - 2X4 Studs cut to 5' 6" (Use 6 - 8') 16 - 2X4 Studs cut to 5' 6"rafters cut to 2' 8-1/4" 16 - 2X4 Upper (Cut from 2 - 16') 16 - 2X4 Upper rafters cut rafters to 2' 8-1/4" 16 - 2X4 Lower cut to 2' 6" (Cut from 1 - 16') 16 - 2X4 Lower rafters cutties to 2'cut 6"to 6' 5-1/4" 8 - 2X4 Collar 8 - 2X4 Collar tiesDoor cut tojambs 6' 5-1/4" 2 - 2X4 cut to 7' 3-1/2" CUT Quick Framer - Gambrel Roof PLEASE READ ALL INSTRUCTIONS AND HELPFUL HINTS CAREFULLY BEFORE CONSTRUCTION Quick Framer - Gambrel Roof MADE IN U.S.A. Tools needed: Hammer, Drill, Saw, Level, Square, Ladder INSTRUCTIONS 1. Separate and stack all parts included in kit. STUD BRACKETS (12 pieces), “A” ANGLE BRACKETS (24 pieces) and “B” ANGLE BRACKETS (16 pieces) . Please refer to “A” or “B” stamped into each ANGLE BRACKET. Cut and mark all lumber to identify as stated in CUT LIST that corresponds to your structure size. Stack all lumber in separate areas. 2. In accordance with your size structure, nail BASE PLATE boards together overlapping ends to form structure base frame. (Picture #1) Use the pressure treated lumber for the bottom of the base frame to prevent rotting. Make sure base frame is square by measuring from corner to corner diagonally. 3. Using screws, attach STUD BRACKETS to outside of top base frame boards (Picture #2) using measurements listed on SIDE VIEW drawing of plans in accordance with your size structure. Measurements are to center of STUD BRACKETS. 4. 3(A-D) NOTE:STUD In orderBRACKETS to make sure each arch is built theto same, stand short 2”using x 4” scrap boards into RIDGE of each ANGLE BRACKET assembly. (Picture #3) . Attach (Picture #2) base frame measurements onBOARD plans.slotsMeasurements are toduring center of brackets Begin arch assembly by sliding two UPPER2RAFTER boards into toptop ANGLE BRACKET “A” and secure with screwswith through SQUARE Attach holes (for other proper screw alignment) 4(A.) . Begin arch assembly by sliding RAFTERS into ANGLE BRACKET and secure screws. 2 in bracket. ANGLE to RAFTERS secure In order to make surethrough each square arch is built the same, stand 2x4 (B.) AttachBRACKETS two more “A” ANGLE BRACKETSand to ends of eachwith UPPERscrews. RAFTER board and secure with screws holes. (C.) Slidein LOWER RAFTER boardsslots into ends of each “A” and secure withassemble screws through square holes. the 2x4’s as alignment devices. RIDGE BOARD (Picture 3).ANGLE StackBRACKET the arches as you them using scraps (D.) Attach ANGLE BRACKET “B” to ends of each LOWER RAFTER boards and secure with screws through square holes. 5. After the ANGLE BRACKETS have been attached to one side of all arches, carefully turn arches over and attach 5. After ANGLE BRACKETS have been attached to one side of arch assembly, carefully turn arch over, leaving scrap boards in place in RIDGE BOARD slots. ANGLE BRACKETS to other side while using the alignment devices mentioned in step 4. Then attach left and right 6. Repeat steps # 4 (A) through (D) attaching ANGLE BRACKETS to other side of arch and secure using screws through the ROUND holes (for proper screw alignment) in STUDS to RAFTERS and secure ANGLE BRACKETS. Continue assembling theusing requiredscrews. number of arches according to your structure size. 7. Slide left and right STUDS into end of each ANGLE BRACKET “B” and secure using screws through ROUND holes. Carefully turn arch assembly over and secure ANGLE BRACKET “B” to STUDS using screws through SQUARE holes. Repeat this step on all arch assemblies. 8. Nail COLLAR TIE to LOWER RAFTER board of each arch assembly, making sure that the top corner of the COLLAR TIE is flush with the outside edge of LOWER RAFTER board. Be sure to attach the COLLAR TIES facing inside on the two end arches. 9. After all arch assemblies are complete, using two people carefully lift each arch onto the assembled base frame and secure to STUD BRACKETS using screws. Arches should be perpendicular to base frame (use a square). To hold the arches in a perpendicular position, use 1” x 4” temporary bracing inside of structure and leave in position until sheathing is in place, as shown in SIDE VIEW drawing. Leave nail heads slightly raised so they can be easily pulled out. The end arch assemblies should set flush with the base frame corners. Bend STUD BRACKETS around each corner of base frame and secure using screws. 10. After arch assemblies are set into place, remove scrap boards from “B” ANGLE BRACKET slots on one side of structure and place RIDGE BOARD into slots in “B” brackets. You may need to tap boards into place using a hammer. Repeat on opposite side of structure. Move up to lower ANGLE BRACKET “A” remove scrap boards and place RIDGE BOARD into slots in lower “A” brackets. Repeat on opposite side of structure. Remove scrap boards from top ANGLE BRACKET “A” and place RIDGE BOARD into slots in top “A” angle brackets. Make sure all arch assemblies are in correct positioning and adjust if needed. Secure all RIDGE BOARDS using screws through bottom holes in ANGLE BRACKETS. (For 10’ x 22’ structures, see #4 of Helpful Hints) 11. Install DOOR JAMBS as shown in FRONT VIEW drawings in accordance with your building size. Nail top of DOOR JAMBS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each DOOR JAMB. Attaching to outside of top BASE PLATE. 12. Install two VERTICAL STUDS in back wall. (Same layout as Step 11) Nail top of VERTICAL STUDS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each VERTICAL STUD. Attaching to outside of top BASE PLATE. 13. Your frame is now complete and ready to sheathe with materials of your choice. (See Helpful Hints) CUT LIST (10'X22' Building) 24 - 2X4 Studs cut to 6' 4" 24 - 2X4 Upper rafters cut to 3' 6-1/8" 24 - 2X4 Lower rafters cut to 3' 1" 12 - 2X4 Collar ties cut to 8' 3-1/2" 2 - 2x4 Door jambs cut to 8' 3-1/2" 2 - 2x4 Vertical studs cut to 8' 3-1/2" 2 - 2X4 Base plates 16' long 2 - 2X4 Base plates cut to 6' 2 - 2x4 Base Plates cut to 9' 4" 5 - 2X4 Ridge boards 16' long 5 - 2X4 Ridge boards 6' long 10 - lX4 Temp. bracing/ door stiffener 2 - 2X4 Pressure treated base plates 16' long 2 - 2X4 Pressure treated base plates cut to 9' 11" 2 - 2X4 Pressure treated base plates cut to 5'5" HELPFUL HINTS (ALL SIZES) (Cut from 24 - 8') (Cut from 12 - 8') (Cut from 12 - 8') (Cut from 12 - 10') (Cut from 2 - 10') (Cut from 2 - 10') (Use 2 - 16') (Cut from 1 - 12') (Cut from 2 - 10') (Use 5 - 16') (Cut from 2 - 12' and 1 - 8') (Use 10 - 8') (Use 2 - 16') (Cut from 2 - 16') (Cut from above 16's) ST MER SER I E 203 591-9032 - 30 1. Install wall sheathing horizontally on sides of 7’X8’ building. Install wall sheathing vertically on ends of 7’X8’ building. Install all wall sheathing vertically on larger size buildings. Install roof sheathing horizontally on all building sizes. Save the pieces of sheathing that you cut off and use them elsewhere (such as the other side of the roof). Use completed arch as pattern to trace cut lines on sheathing for ends of building. 2. Roofing material may be metal, corrugated fiberglass, rolled roofing or shingles. 3. Doors can be cut from plywood sheathing. Outline each half with 1X4 boards to make them rigid. Screw hinges to door jambs. On larger buildings, full sheets of plywood may be used to construct 8’doors. 4. On 10’ x 22’ structures, stagger ridge board seams as follows: Start at front end of structure and place 16’ ridge board into slot in “B” brackets. (you may need to tap into place using a hammer) Move to back end of structure and place 6’ ridge board into slot in remaining “B” angle brackets. Repeat on opposite side of structure. At front end of structure, move up to lower angle bracket “A” and place the 6’ ridge board into slots in lower “A” angle brackets. Move to back end of structure and place 16’ ridge board into slots in remaining lower “A” angle brackets. Repeat on opposite side. At front end of structure, move up to top “A” angle bracket and place the 16’ ridge board into slots of top “A” angle brackets. Move to back end of structure and place the 6’ ridge board into slots in remaining top “A” angle bracket. Make sure all arch assemblies are in correct positioning and adjust if needed. Secure all ridge boards using screws through bottom holes in angle brackets. 5. Optional 1X4’s may be used as corner trim. 6. Sheathing may be installed above pressure treated base plates to prevent moisture damage. -5 30 G&T SALES, Inc. 415 Reservoir Road • Whitefish, MT 59937 • 1-406-253-5138 or 1-406-250-7054 • Fax 1-800-880-3178 U.S. Patent #5,524,397 Canadian Patent #2,227,540 415 Reservoir Road • Whitefish, MT 59937 • 1-406-253-5138 or 1-406-250-7054 • Fax 1-800-880-3178 • email: [email protected] U.S. Patent #5,524,397 Canadian Patent #2,227,540
© Copyright 2026 Paperzz