easy Installation

- Low Maintenance
- Primed White (ready
to install and paint)
- Easy Installation
- 25 Year Warranty
12" Round PermaCast® Columns with Tuscan
Cap and Base and 7" Balustrade System
HB&G has created a unique and elegant balustrade
system that can make your home stand out from the
rest. These low-maintenance features are made by
molding high-density urethane around structural
elements in order to provide exceptional beauty,
durability, and quality. Choose from three rail sizes and
several baluster profiles. Curved balustrade systems
are available in 10’ sections. For more information
about this exceptional addition to your porch, call
800-264-4HBG.
38
6" Balustrade System
square
saffron
shannon
shelby
31/2"
3"
61/2"
31/2"
3"
33/4"
Baluster
58030
Baluster
58037
Baluster
58036
Baluster
58038
65/16"
91/2"
55/16"
57/8"
Baluster
58033
Baluster
58034
Extended Baluster
58032
Extended Baluster
58035
1
8 /4"
sherwood
31/2"
137/8"
327/8"
137/8"
261/2"
41/4"
137/8"
24"
145/8"
335/8"
91/2"
91/2"
65/8"
145/8"
28"
23/4"
145/8"
20"
2'1"
3'2 "
61/2"
33/4"
Baluster
58029
Baluster
58031
91/2"
3 /8"
3"
2'1"
2'81/2"
2'87/8"
2'21/2"
33/8"
3
25/8"
3"
33/8"
63/4"
3"
34
/"
8"
1
3 /2"
6"
Ball Cap*
#57087
*Must be used
with Flat Cap
8"
51/2"
4"
31/2"
2" 1"
91/2"
81/4"
15/8"
81/4"
Five Sided
Pyramid Cap
#57083
33/4"
6"
Baluster
58063
6"
8"
10"
10"
33/4"
6"
33/4"
8"
33/4"
Top
Rail
Bottom
Rail
6"
O/C
Maximum
Spacing
M
Sherwood
/"
Five Sided
Angle Newel
#57084
Plain Newel
#57088
Square
Saffron
Shannon
Flat Cap
#57086
2"
4'
Baluster
58062
91/2"
8"
5 1/ 2"
5"
Baluster
58061
Poly
molding
provided
loose to be
installed
on job site.
See page 5
for panel
molding
styles.
34
1'8"
3'0"
1'8"
2'7"
1'8"
2'4"
1
/2"
Pyramid Cap
#57085
Shelby
39
7 7/8"
7 /8"
Top View
Five Sided Angle Newel
7
Panel Newel
and Corner
Newel
57089
6"
Maximum
M
SpacingO/C
7
58031
/8"
21/4"
51/4"
7
58032
/8"
21/4"
51/4"
7
58036
/8"
21/4"
51/4"
58033
1"
2"
51/2"
58034
1"
2"
51/2"
58035
1"
2"
51/2"
58037
1"
2"
51/2"
58038
1"
2"
51/2"
58029
0"
4"
7"
58030
0"
4"
7"
1
3
58061
1 /16"
1 /4"
51/4"
1
3
58062
1 /16"
1 /4"
51/4"
58063
11/16"
13/4"
51/4"
7" Balustrade System
carrington
51/4"
5
5 /4"
91/2"
61/2"
21/2"
27/8"
61/2"
91/2"
51/4"
51/4"
51/2"
5 /4"
71/4"
53/4"
1
1
/8"
51/4"
71/4"
53/4"
8"
6"
8"
21"
40"
21"
34"
21"
26"
16"
35"
16"
29"
8"
16"
23"
47/8"
calvert
Baluster
58045
Extended Baluster
58042
/2"
61/2"
Baluster
58046
10"
7 7/8"
Extended Baluster
58044
4'
91/2"
Baluster
58043
1
21/2"
91/2"
Baluster
58041
6"
10"
61/2"
41/8"
Panel Newel
and Corner
Newel
57089
Poly
molding
provided
loose
to be
installed
on job site.
See page 5
for panel
molding
styles.
7 /8"
7
Top View
Five Sided
Angle Newel
clement
51/4"
1
34
/"
81/4"
21/2"
4"
61/2"
5 /4"
51/4"
6"
Ball Cap*
#57087
*Must be used
with Flat Cap
15/8"
1'103/4"
3'0"
1'103/4"
2'7"
1'103/4"
2'4"
91/2"
Flat Cap
#57086
81/4"
Pyramid Cap
#57085
81/4"
/"
Five Sided
Angle Newel
#57084
34
Plain Newel
#57088
2"
Baluster
58092
63/4"
Baluster
58091
41/4"
33/4"
2" 1"
91/2"
Five Sided
Pyramid Cap
#57083
Baluster
58093
31/2"
61/4"
Top
Rail
Bottom
Rail
O/C
Maximum
Spacing
M
Clement
Carrington
Calvert
40
Support Block
#58012
7"
Maximum
M
SpacingO/C
58041
1-3/8"
1-1/4" 6-1/2"
58042
1-3/8"
1-1/4"
6-1/2"
58045
1-3/8"
1-1/4"
6-1/2"
58043
1-3/8"
1-1/4"
6-1/2"
58044
1-3/8"
1-1/4"
6-1/2"
58046
1-3/8"
1-1/4"
6-1/2"
58091
1-5/16"
1-3/8"
6-5/8"
58092
1-5/16"
1-3/8"
6-5/8"
58093
1-5/16"
1-3/8"
6-5/8"
12" Balustrade System
Manasses
Mandeville
7"
Baluster
58055
Extended Baluster
58053
91/2"
91/2"
61/2"
Baluster
58054
Extended Baluster
58056
9"
51/2"
Top
Rail
6"
51/2"
123/8"
9"
21"
40"
21"
28"
31/2"
19"
38"
91/2"
51/2"
Baluster
58052
21"
34"
31/2"
51/2"
19"
30"
31/2"
19"
26"
31/2"
Baluster
58051
7 1/4"
91/2"
7"
7 1/4"
7 1/4"
61/2"
7"
Bottom
Rail
123/8"
14"
161/2"
117/8"
31/2"
11/4"
21/8"
15"
Pyramid Cap
#57091
Support Block
#58014
14"
12"
161/4"
15/8"
4'
1
/2"
14"
Panel Newel
and Corner
Newel
57095
Flat Cap
#57092
15"
Ball Cap
7" 63058
10" 57096
12" 57093
*Must be used
with Flat Cap
Poly molding provided
loose to be installed on
job site. See page 5 for
panel molding styles.
47/8"
27/8" 2"
111/4"
1415/16"
Plain Newel
#57094
Classic Cap
57097
O/C
Maximum
Spacing
M
Mandeville
Manasses
41
12"
M
Maximum
SpacingO/C
58051
1-3/4"
1/2"
7-1/2"
58052
1-3/4"
1/2"
7-1/2"
58053
1-3/4"
1/2"
7-1/2"
58054
2-3/4"
0"
7-1/2"
58055
2-3/4"
0"
7-1/2"
58056
1-3/4"
0"
7-1/2"
Curved Balustrade System
• 6", 7" and 12" Rail Styles
• Low Maintenance
• P
rimed White (ready
to install and paint)
HB&G Curved Balustrade System will add an elegant
finishing touch to any house. Each top and bottom rail
style is available in radius from 60" to 108" in 10' lengths.
(See pages 39-41 for rail styles)
• Easy Installation
• 25 Year Warranty
• A
vailable in 60"-108'
radius
• Modified Radius
Available
Must purchase balusters and newels separately.
Typical Assembly
Pyramid
Cap
Building Codes
HB&G recommends checking
all local, state, and national
building codes before the
design and installation of
your balustrade system.
HB&G is not responsible or
liable for any balustrade
system that does not meet
the requirements of the
governing building code
in the location where the
system is installed.
The space between the
bottom rail and the substrate
should not be more than 2”.
Complete installation instructions are available on our
web site or contact us via telephone or email.
NOTE: Rails are not pre-drilled.
42
Warranty
HB&G warrants that for 25
years the components in its
Balustrade Systems are free
from defects in material and
workmanship. Assuming
proper installation, HB&G
will repair or replace any
component which has
failed as a result of defective
materials or workmanship.
In the event of a claim
against this warranty, proof
of purchase, with date will
be required to affect such a
claim. Installation cost not
included. HB&G gives no
other warranty expressed or
implied.
Balustrade Installation Instructions (6", 7" and 12" Systems)
NEWEL POST INSTALLATION KIT
(Order 1 Kit per Newel Post)
Read through entire installation instructions before
starting Installation.
HB&G has developed one installation kit for wood and
concrete so there is no need to specify when ordering.
Newel Installation Kit
1. One 4" x 4" Floor Flange
2. Four 5/16" x 2" lag bolts
3. Four 5/16" washers
4. Four 1/4" x 3/4" concrete anchors
5. Four 1/4/" x 3/4" hexhead bolts
6. One 1/2" x 54" threaded rod
7. One 1/2" lock washer
8. One 1/2" nut
9. One "C"-channel
HB&G RAILING INSTALLATION KITS
Note: “C” Channel will vary in length
according to the newel kit ordered.
Make sure to order the correct newel
kit.
ILLUSTRATION 1
Nut
Lock Washer
C-Channel
PVC Pipe
Allthread Rod
ILLUSTRATION 2
Adhesive
Floor Flange
Wood Deck
Lag Bolt
Lock
Washers
4 Lag
Bolts
Concrete
Anchor
(Order 1 Kit per Top & Bottom Rail Section)
NOTE: HB&G has 1 Standard Rail Kit. For all applications
(stair,straight, column attachments, etc.).
Screws
Wood Blocking
Standard Rail Installation Kit
1. Twenty-Four #12 x 4" self tapping flathead screws.
2. One 10oz. Tube of polyurethane adhesive.
HB&G NEWEL POST INSTALLATION
HB&G has one installation kit for both Wood Decks
and Concrete.
1-A. Wood Deck Installation
Screws used to
attach rail to
newel, column
or wall.
(Illustration A)
Stair Application
4" Flat
Head
Screws
1. Locate the center point for each newel post and floor
flange.
2. Make sure to install blocking under floor flange
areas.
3. Secure floor flanges in place with 5/16" x 2" lag bolts
and washers
1-B. Concrete Installation
PVC Pipe
Wall
Pipe
inside
Baluster
Newel Post
PVC Pipe
Newel Post
PVC Pipe
(Illustration B)
1. Locate the center point for each newel post and floor
flange.
2. Make sure concrete is fully cured before drilling
anchor holes.
3. Mark out anchor holes in floor flange. Drill 3/8"
hole 1" deep.
4. Insert anchor and set anchor pin using a punch. (See
Detail B)
5. Secure floor flanges in place using 1/4" anchor bolts
and washers.
1-C. Put the newel post in place over the floor flange
and screw in the 1/2" all thread rod into the nut welded to the floor flange. Put the C-channel in place and
secure loosely with the nut and lock washer. The newel
is secured in place after the rail section is put in place.
(Illustration C)
ILLUSTRATION 3
ILLUSTRATION A
Wood Deck
NOTE: When applying a flat cap and ball to the newel
post use the all thread rod as a dowel to provide extra
strength to the ball. (Illustration M)
RAIL INSTALLATION PREPARATION & ASSEMBLY
Addditional baluster and rail assembly tools. 3 to 6
nylon straps
2-A. Locate and mark center line on the newel post or
column. (Illustration D)
2-B. Complying with code, cut the support blocks to
the desired height of the bottom of the bottom rail and
set them in place between the newel posts. Support
blocks should be used when spanning more than four
feet. For 8' rail sections use 1 support block. For 10' &
12' sections use two or more support blocks.
(Illustration D)
Continued on page 71
ILLUSTRATION 5
ILLUSTRATION 4
Nut
Punch
Wood Blocking
I M P O R TA N T
HB&G curved balustrade railings use serrated PVC pipe. Newel posts must be used
every 8 feet and a support block must be
used at the center point of the bottom rail.
Rails are not designed to butt into each other;
they are designed to be joined to newel
posts. Any other application will not be covered by warranty.
Washer
Washer
Concrete
Blocking
ILLUSTRATION B
C-Channel
Top Rail
ILLUSTRATION C
Column
Note: All PermaCast
Columns must be
pre-drilled
using 1/8" drill bit.
Bottom Rail
Support
Block
Phone: (800) 264-4HBG
Fax: (334) 566-4629
www.hbgcolumns.com
ILLUSTRATION D
69
ALL PRICES SUBJECT TO CHANGE WITHOUT NOTICE • ALL PRICES SHOWN ARE LIST PRICES • EFFECTIVE DATE: AUGUST 7, 2008 V11.0
Balustrade Installation Instructions (6", 7" and 12" Systems)
RAILING & BALUSTER ASSEMBLY (CONTINUED
2-C. Measure the distance between newel posts or
columns. (Illustration D) Cut and or cope the rails to
length working with the bottom rail first
2-D. Lay out the center line spacing for the balusters on
the top and bottom rail section. Refer to the pipe in the
baluster for the proper hole size and drill the holes in the
rail accordingly. (Illustration F)
NOTE: Make sure to take measurements from both the
top and bottom of the newel post or column before cutting rails to length. Make sure the system is square. The
top rail may be longer than the bottom rail when
installing between tapered columns.
3. Set the bottom rail in place between the newel posts
or columns.
4. Rough up the top and bottom of each baluster and
the areas around the baluster holes in the top and bottom rails. Use a heavy grit sand paper, sanding disk or
dremel tool to expose the yellow foam core to ensure
the polyurethane adhesive will have a good surface to
bond to. (Illustration G)
5. Apply a 1/2" bead of urethane adhesive to the bottom of each baluster and put into place on the bottom
rail. (Illustration G)
6. Apply a 1/2" bead of urethane adhesive to the top
of each baluster and put the top rail in place.
(Illustration G)
7. Twist each baluster to ensure the adhesive contacts
the rail surfaces.
8. Strap the assembled rail section together loosely. Use
cardboard material to place under the straps to protect
the rail from strap marks. (Illustration H)
9. Use a tape measure or square to align all the balusters with the edge of the rail. (Illustration I)
10. Tighten straps on rail assembly and clean any
excess adhesive from around the balusters using a
putty knife and towel.(Illustration K)
11. Using a pencil, outline the top and bottom rail on
each newel post or column.
12. Remove the strapped rail section and rough up the
areas where the rails meet the newel post or column.
13. Apply a 1/2" bead of adhesive to the 4 ends of the
assembled rail section. (Illustration J) Set the rail section back in place and secure in place using 6 - 4" self
tapping screws. (Illustration K) Clean any excess adhesive from the area around the end of each rail.
14. Secure the newel posts in place by
tightening down the 1/2" nut. (Illustration L)
15. If applying a peak or flat cap, cut the all thread rod
flush with the top of the newel post. If applying a ball
drill a 1/2" hole in the bottom of the ball and cap. Set
cap and ball over allthread rod. Use adhesive and
screws to secure cap and ball in place. (Illustration M)
16. All screw holes should be filled using a two part
plastic wood filler.
17. All joints should be caulked using any quality latex
caulk.
18. Spot prime using "Kilz" oil-base or latex primer.
19. Paint using any quality latex or oil-base paint.
Rigid Pipe
Adhesive
Measure
Measure
NOTE: Check local building codes for baluster
spacing requirements & required rail height.
ILLUSTRATION G
ILLUSTRATION E
Cardboard Material
ILLUSTRATION F
ILLUSTRATION H
Align
ILLUSTRATION I
Tighten
ILLUSTRATION L
Adhesive
Ball Cap
Peak Cap
or
Flat Cap
Flat
Cap
ILLUSTRATION J
ILLUSTRATION M
ILLUSTRATION K
Cardboard Corners
Strap
Screws
Note: All PermaCast
Columns must be pre-drilled
using 1/8" drill bit.
Support Blocks
NOTE: Installation and the structural integrity of the balustrade system is the responsibility of the installer. HB&G will not
be held liable or responsible for installations that do not meet national, international, or local codes.
ALL PRICES SUBJECT TO CHANGE WITHOUT NOTICE • ALL PRICES SHOWN ARE LIST PRICES • EFFECTIVE DATE: AUGUST 7, 2008 V11.0
70
Phone: (800) 264-4HBG
Fax: (334) 566-4629
www.hbgcolumns.com