- Low Maintenance - Primed White (ready to install and paint) - Easy Installation - 25 Year Warranty 12" Round PermaCast® Columns with Tuscan Cap and Base and 7" Balustrade System HB&G has created a unique and elegant balustrade system that can make your home stand out from the rest. These low-maintenance features are made by molding high-density urethane around structural elements in order to provide exceptional beauty, durability, and quality. Choose from three rail sizes and several baluster profiles. Curved balustrade systems are available in 10’ sections. For more information about this exceptional addition to your porch, call 800-264-4HBG. 38 6" Balustrade System square saffron shannon shelby 31/2" 3" 61/2" 31/2" 3" 33/4" Baluster 58030 Baluster 58037 Baluster 58036 Baluster 58038 65/16" 91/2" 55/16" 57/8" Baluster 58033 Baluster 58034 Extended Baluster 58032 Extended Baluster 58035 1 8 /4" sherwood 31/2" 137/8" 327/8" 137/8" 261/2" 41/4" 137/8" 24" 145/8" 335/8" 91/2" 91/2" 65/8" 145/8" 28" 23/4" 145/8" 20" 2'1" 3'2 " 61/2" 33/4" Baluster 58029 Baluster 58031 91/2" 3 /8" 3" 2'1" 2'81/2" 2'87/8" 2'21/2" 33/8" 3 25/8" 3" 33/8" 63/4" 3" 34 /" 8" 1 3 /2" 6" Ball Cap* #57087 *Must be used with Flat Cap 8" 51/2" 4" 31/2" 2" 1" 91/2" 81/4" 15/8" 81/4" Five Sided Pyramid Cap #57083 33/4" 6" Baluster 58063 6" 8" 10" 10" 33/4" 6" 33/4" 8" 33/4" Top Rail Bottom Rail 6" O/C Maximum Spacing M Sherwood /" Five Sided Angle Newel #57084 Plain Newel #57088 Square Saffron Shannon Flat Cap #57086 2" 4' Baluster 58062 91/2" 8" 5 1/ 2" 5" Baluster 58061 Poly molding provided loose to be installed on job site. See page 5 for panel molding styles. 34 1'8" 3'0" 1'8" 2'7" 1'8" 2'4" 1 /2" Pyramid Cap #57085 Shelby 39 7 7/8" 7 /8" Top View Five Sided Angle Newel 7 Panel Newel and Corner Newel 57089 6" Maximum M SpacingO/C 7 58031 /8" 21/4" 51/4" 7 58032 /8" 21/4" 51/4" 7 58036 /8" 21/4" 51/4" 58033 1" 2" 51/2" 58034 1" 2" 51/2" 58035 1" 2" 51/2" 58037 1" 2" 51/2" 58038 1" 2" 51/2" 58029 0" 4" 7" 58030 0" 4" 7" 1 3 58061 1 /16" 1 /4" 51/4" 1 3 58062 1 /16" 1 /4" 51/4" 58063 11/16" 13/4" 51/4" 7" Balustrade System carrington 51/4" 5 5 /4" 91/2" 61/2" 21/2" 27/8" 61/2" 91/2" 51/4" 51/4" 51/2" 5 /4" 71/4" 53/4" 1 1 /8" 51/4" 71/4" 53/4" 8" 6" 8" 21" 40" 21" 34" 21" 26" 16" 35" 16" 29" 8" 16" 23" 47/8" calvert Baluster 58045 Extended Baluster 58042 /2" 61/2" Baluster 58046 10" 7 7/8" Extended Baluster 58044 4' 91/2" Baluster 58043 1 21/2" 91/2" Baluster 58041 6" 10" 61/2" 41/8" Panel Newel and Corner Newel 57089 Poly molding provided loose to be installed on job site. See page 5 for panel molding styles. 7 /8" 7 Top View Five Sided Angle Newel clement 51/4" 1 34 /" 81/4" 21/2" 4" 61/2" 5 /4" 51/4" 6" Ball Cap* #57087 *Must be used with Flat Cap 15/8" 1'103/4" 3'0" 1'103/4" 2'7" 1'103/4" 2'4" 91/2" Flat Cap #57086 81/4" Pyramid Cap #57085 81/4" /" Five Sided Angle Newel #57084 34 Plain Newel #57088 2" Baluster 58092 63/4" Baluster 58091 41/4" 33/4" 2" 1" 91/2" Five Sided Pyramid Cap #57083 Baluster 58093 31/2" 61/4" Top Rail Bottom Rail O/C Maximum Spacing M Clement Carrington Calvert 40 Support Block #58012 7" Maximum M SpacingO/C 58041 1-3/8" 1-1/4" 6-1/2" 58042 1-3/8" 1-1/4" 6-1/2" 58045 1-3/8" 1-1/4" 6-1/2" 58043 1-3/8" 1-1/4" 6-1/2" 58044 1-3/8" 1-1/4" 6-1/2" 58046 1-3/8" 1-1/4" 6-1/2" 58091 1-5/16" 1-3/8" 6-5/8" 58092 1-5/16" 1-3/8" 6-5/8" 58093 1-5/16" 1-3/8" 6-5/8" 12" Balustrade System Manasses Mandeville 7" Baluster 58055 Extended Baluster 58053 91/2" 91/2" 61/2" Baluster 58054 Extended Baluster 58056 9" 51/2" Top Rail 6" 51/2" 123/8" 9" 21" 40" 21" 28" 31/2" 19" 38" 91/2" 51/2" Baluster 58052 21" 34" 31/2" 51/2" 19" 30" 31/2" 19" 26" 31/2" Baluster 58051 7 1/4" 91/2" 7" 7 1/4" 7 1/4" 61/2" 7" Bottom Rail 123/8" 14" 161/2" 117/8" 31/2" 11/4" 21/8" 15" Pyramid Cap #57091 Support Block #58014 14" 12" 161/4" 15/8" 4' 1 /2" 14" Panel Newel and Corner Newel 57095 Flat Cap #57092 15" Ball Cap 7" 63058 10" 57096 12" 57093 *Must be used with Flat Cap Poly molding provided loose to be installed on job site. See page 5 for panel molding styles. 47/8" 27/8" 2" 111/4" 1415/16" Plain Newel #57094 Classic Cap 57097 O/C Maximum Spacing M Mandeville Manasses 41 12" M Maximum SpacingO/C 58051 1-3/4" 1/2" 7-1/2" 58052 1-3/4" 1/2" 7-1/2" 58053 1-3/4" 1/2" 7-1/2" 58054 2-3/4" 0" 7-1/2" 58055 2-3/4" 0" 7-1/2" 58056 1-3/4" 0" 7-1/2" Curved Balustrade System • 6", 7" and 12" Rail Styles • Low Maintenance • P rimed White (ready to install and paint) HB&G Curved Balustrade System will add an elegant finishing touch to any house. Each top and bottom rail style is available in radius from 60" to 108" in 10' lengths. (See pages 39-41 for rail styles) • Easy Installation • 25 Year Warranty • A vailable in 60"-108' radius • Modified Radius Available Must purchase balusters and newels separately. Typical Assembly Pyramid Cap Building Codes HB&G recommends checking all local, state, and national building codes before the design and installation of your balustrade system. HB&G is not responsible or liable for any balustrade system that does not meet the requirements of the governing building code in the location where the system is installed. The space between the bottom rail and the substrate should not be more than 2”. Complete installation instructions are available on our web site or contact us via telephone or email. NOTE: Rails are not pre-drilled. 42 Warranty HB&G warrants that for 25 years the components in its Balustrade Systems are free from defects in material and workmanship. Assuming proper installation, HB&G will repair or replace any component which has failed as a result of defective materials or workmanship. In the event of a claim against this warranty, proof of purchase, with date will be required to affect such a claim. Installation cost not included. HB&G gives no other warranty expressed or implied. Balustrade Installation Instructions (6", 7" and 12" Systems) NEWEL POST INSTALLATION KIT (Order 1 Kit per Newel Post) Read through entire installation instructions before starting Installation. HB&G has developed one installation kit for wood and concrete so there is no need to specify when ordering. Newel Installation Kit 1. One 4" x 4" Floor Flange 2. Four 5/16" x 2" lag bolts 3. Four 5/16" washers 4. Four 1/4" x 3/4" concrete anchors 5. Four 1/4/" x 3/4" hexhead bolts 6. One 1/2" x 54" threaded rod 7. One 1/2" lock washer 8. One 1/2" nut 9. One "C"-channel HB&G RAILING INSTALLATION KITS Note: “C” Channel will vary in length according to the newel kit ordered. Make sure to order the correct newel kit. ILLUSTRATION 1 Nut Lock Washer C-Channel PVC Pipe Allthread Rod ILLUSTRATION 2 Adhesive Floor Flange Wood Deck Lag Bolt Lock Washers 4 Lag Bolts Concrete Anchor (Order 1 Kit per Top & Bottom Rail Section) NOTE: HB&G has 1 Standard Rail Kit. For all applications (stair,straight, column attachments, etc.). Screws Wood Blocking Standard Rail Installation Kit 1. Twenty-Four #12 x 4" self tapping flathead screws. 2. One 10oz. Tube of polyurethane adhesive. HB&G NEWEL POST INSTALLATION HB&G has one installation kit for both Wood Decks and Concrete. 1-A. Wood Deck Installation Screws used to attach rail to newel, column or wall. (Illustration A) Stair Application 4" Flat Head Screws 1. Locate the center point for each newel post and floor flange. 2. Make sure to install blocking under floor flange areas. 3. Secure floor flanges in place with 5/16" x 2" lag bolts and washers 1-B. Concrete Installation PVC Pipe Wall Pipe inside Baluster Newel Post PVC Pipe Newel Post PVC Pipe (Illustration B) 1. Locate the center point for each newel post and floor flange. 2. Make sure concrete is fully cured before drilling anchor holes. 3. Mark out anchor holes in floor flange. Drill 3/8" hole 1" deep. 4. Insert anchor and set anchor pin using a punch. (See Detail B) 5. Secure floor flanges in place using 1/4" anchor bolts and washers. 1-C. Put the newel post in place over the floor flange and screw in the 1/2" all thread rod into the nut welded to the floor flange. Put the C-channel in place and secure loosely with the nut and lock washer. The newel is secured in place after the rail section is put in place. (Illustration C) ILLUSTRATION 3 ILLUSTRATION A Wood Deck NOTE: When applying a flat cap and ball to the newel post use the all thread rod as a dowel to provide extra strength to the ball. (Illustration M) RAIL INSTALLATION PREPARATION & ASSEMBLY Addditional baluster and rail assembly tools. 3 to 6 nylon straps 2-A. Locate and mark center line on the newel post or column. (Illustration D) 2-B. Complying with code, cut the support blocks to the desired height of the bottom of the bottom rail and set them in place between the newel posts. Support blocks should be used when spanning more than four feet. For 8' rail sections use 1 support block. For 10' & 12' sections use two or more support blocks. (Illustration D) Continued on page 71 ILLUSTRATION 5 ILLUSTRATION 4 Nut Punch Wood Blocking I M P O R TA N T HB&G curved balustrade railings use serrated PVC pipe. Newel posts must be used every 8 feet and a support block must be used at the center point of the bottom rail. Rails are not designed to butt into each other; they are designed to be joined to newel posts. Any other application will not be covered by warranty. Washer Washer Concrete Blocking ILLUSTRATION B C-Channel Top Rail ILLUSTRATION C Column Note: All PermaCast Columns must be pre-drilled using 1/8" drill bit. Bottom Rail Support Block Phone: (800) 264-4HBG Fax: (334) 566-4629 www.hbgcolumns.com ILLUSTRATION D 69 ALL PRICES SUBJECT TO CHANGE WITHOUT NOTICE • ALL PRICES SHOWN ARE LIST PRICES • EFFECTIVE DATE: AUGUST 7, 2008 V11.0 Balustrade Installation Instructions (6", 7" and 12" Systems) RAILING & BALUSTER ASSEMBLY (CONTINUED 2-C. Measure the distance between newel posts or columns. (Illustration D) Cut and or cope the rails to length working with the bottom rail first 2-D. Lay out the center line spacing for the balusters on the top and bottom rail section. Refer to the pipe in the baluster for the proper hole size and drill the holes in the rail accordingly. (Illustration F) NOTE: Make sure to take measurements from both the top and bottom of the newel post or column before cutting rails to length. Make sure the system is square. The top rail may be longer than the bottom rail when installing between tapered columns. 3. Set the bottom rail in place between the newel posts or columns. 4. Rough up the top and bottom of each baluster and the areas around the baluster holes in the top and bottom rails. Use a heavy grit sand paper, sanding disk or dremel tool to expose the yellow foam core to ensure the polyurethane adhesive will have a good surface to bond to. (Illustration G) 5. Apply a 1/2" bead of urethane adhesive to the bottom of each baluster and put into place on the bottom rail. (Illustration G) 6. Apply a 1/2" bead of urethane adhesive to the top of each baluster and put the top rail in place. (Illustration G) 7. Twist each baluster to ensure the adhesive contacts the rail surfaces. 8. Strap the assembled rail section together loosely. Use cardboard material to place under the straps to protect the rail from strap marks. (Illustration H) 9. Use a tape measure or square to align all the balusters with the edge of the rail. (Illustration I) 10. Tighten straps on rail assembly and clean any excess adhesive from around the balusters using a putty knife and towel.(Illustration K) 11. Using a pencil, outline the top and bottom rail on each newel post or column. 12. Remove the strapped rail section and rough up the areas where the rails meet the newel post or column. 13. Apply a 1/2" bead of adhesive to the 4 ends of the assembled rail section. (Illustration J) Set the rail section back in place and secure in place using 6 - 4" self tapping screws. (Illustration K) Clean any excess adhesive from the area around the end of each rail. 14. Secure the newel posts in place by tightening down the 1/2" nut. (Illustration L) 15. If applying a peak or flat cap, cut the all thread rod flush with the top of the newel post. If applying a ball drill a 1/2" hole in the bottom of the ball and cap. Set cap and ball over allthread rod. Use adhesive and screws to secure cap and ball in place. (Illustration M) 16. All screw holes should be filled using a two part plastic wood filler. 17. All joints should be caulked using any quality latex caulk. 18. Spot prime using "Kilz" oil-base or latex primer. 19. Paint using any quality latex or oil-base paint. Rigid Pipe Adhesive Measure Measure NOTE: Check local building codes for baluster spacing requirements & required rail height. ILLUSTRATION G ILLUSTRATION E Cardboard Material ILLUSTRATION F ILLUSTRATION H Align ILLUSTRATION I Tighten ILLUSTRATION L Adhesive Ball Cap Peak Cap or Flat Cap Flat Cap ILLUSTRATION J ILLUSTRATION M ILLUSTRATION K Cardboard Corners Strap Screws Note: All PermaCast Columns must be pre-drilled using 1/8" drill bit. Support Blocks NOTE: Installation and the structural integrity of the balustrade system is the responsibility of the installer. HB&G will not be held liable or responsible for installations that do not meet national, international, or local codes. ALL PRICES SUBJECT TO CHANGE WITHOUT NOTICE • ALL PRICES SHOWN ARE LIST PRICES • EFFECTIVE DATE: AUGUST 7, 2008 V11.0 70 Phone: (800) 264-4HBG Fax: (334) 566-4629 www.hbgcolumns.com
© Copyright 2026 Paperzz