Assembling Instructions Standard “Click Greenhouse” Basic Set Length 4 meters Content: Groundwork scheme...................................................... page 12 Front wall with door frame assembly instructions .......... page 13 Front wall with window frame assembly instructions ..... page 15 Assembling of reinforced arches ................................... page 17 Assembling of front wall with door frame to the intermediate reinforced arch .................................... page 18 Final assembling instructions of the Basic “Click Greenhouse” – 4 meters .................. page 20 11 Assembling Instructions: Standard greenhouse Basic set Length – 4 meters Three arches (3m x 2.1 m) assembling. Assembly sequence: 1. Front wall with door frame assembling. 2. Front wall with window frame assembling. 3. Assembling of the intermediate reinforced arch. 4. Connection of the front wall with door frame with intermediate reinforced arch. 5. Final assembling of the Basic Set of “Click Greenhouse”. 6. Numbers of accessories and quantities can be seen in corresponding tables below. There several ways to mount you “Click Greenhouse” to the ground. We offer you one of the possible and easy ways to do it. Choose available place for your “Click Greenhouse” • Line the area according to the drawing below. • Prepare holes for the all greenhouse “legs” according to the drawing below. Depths: 24 – 25 cm. Diameter: 40cm. ! 12 40 40 Dig out narrow trench by the perimeter of your future "Click Greenhouse" in order to place assembling part No. 40 into the ground. Standard Greenhouse Basic set Length - 4 meters 24 1. Front wall with door frame assembly instructions 31 C A 24 C 39 23 C 23 A Lay out all the assembling parts on the ground (according to the scheme bellow). 39 23 30L A A 35 24 36 C 36 B 22 23 B 22 21 41 B 21 30R 22 B 35 B 21 22 22 B B 21 22 41 22 21 40 B 21 22 D 20 25 21 24 B 21 22 24 21 B 25 22 Table No.1 (dimensions in mm) Part B 21 40 No. Quantity 22 B mm 21 39 2 464 35 2 1892 36 2 1860 31 1 30L 1 30R 1 41 2 1174 40 2 1522 20 1 21 12 22 12 М5х20 23 8 М5х35 24 10 М5 25 2 М5х10 22 21 Standard Greenhouse Basic set Length - 4 meters View of the finally assembled “Front wall with door frame” 13 A A A 23 24 1 2 3 A 1.1. Connect 30L (semi arch) to 31 (arch). – (A). Put in one parts into another until click and then straighten the connection using screw bolt 23 (M5x35) and screw nut 24 (M5). 1.2. Connect part 30R (semi arch) to the part 31 (arch) – (A). 1.3. Assemble two sets from parts 39 and 36 – (A) 1.4. Put in part 41 into the holes in parts 36, 35 and 30L, straighten with the screw bolt 22 (M5x20) and screw nut 21 – (B) 1.5. In the same way assemble the right part: parts 36, 35 and 30R with part 41. 1.6. Put in part 40 into the holes in parts 36, 35 and 30L, straighten with screw bolt 22 (M5x20) and screw nut 21 – (B) 1.7. The right part assembles in the same way: parts 36, 35 and 30R with part 40. B 4 B 22 21 1 B B B 3 1.8. Connect vertical parts 35, 36 and 39 to arches with screw bolt 23 (M5x35) and screw nut 24 (M5) – (C) 2 4 C 5 C 24 23 1.9. Attach two parts 40 and connect using connecting bar 20, straighten with screwing bolt 25 (M5x10) and screwing nut 24 (M5) – (D) D 24 1 D 24 2 D 20 25 25 1 14 2 3 Standard Greenhouse Basic set Length - 4 meters 24 2. Front wall with window frame assembly instructions 31 C A 24 C 39 23 A C 23 Lay out all the assembling parts on the ground (according to the scheme bellow) 39 22 23 30L 21 A 51 B 22 35 B 21 36 A 24 C 23 36 B 22 B 30R 22 21 B 21 22 41 35 B 21 B 22 22 B 21 B 21 B 21 22 40 D 20 25 21 Table No.2 (dimensions in mm) Part 22 41 22 B 21 24 22 21 24 B 25 22 No. Quantity mm 39 2 464 35 2 1892 36 2 1860 31 1 30L 1 30R 1 41 2 1174 40 2 1522 20 1 21 14 22 14 М5х20 23 8 М5х35 24 10 М5 25 2 М5х10 51 1 745 Standard Greenhouse Basic set Length - 4 meters B 21 22 40 21 B 22 21 View of the finally assembled “Front wall with window frame” 15 A A A 23 24 1 2 3 A 2.1. 2.2. 2.3. 2.4. Connect parts 30L (semi arch) to 31 (arch) (A). Attach part 30R (semi arch) to the part 31 – (A) Assemble two sets from parts 39 and 36 – (A) Put in part 51 into the hole in part 39 and straighten with screwing bolt 22 (M5x20) and screw nut 21 – (B) 2.5. Put in part 41 into the holes in parts 36, 35, and 30L, then straighten with screwing bolt 22 (M5x20) and screwing nut 21 – (B) 2.6. In the same way assemble the right part: 36, 35 and 30 R with 41. 2.7. Put in part 40 into the holes in parts 36, 35, and 30L and straighten with screwing bolt 22 (M5x20) and screwing nut 21 – (B) 2.8. In the same way assemble the right part: 36, 35 and 30R with 41. B 4 B 22 21 1 B B B 3 2.9. Connect vertical parts 35, 36, 39 with arches, straighten with screw bolt 23 (M5x35) and screw nut 24 (M5) – (C) 2 4 C 5 C 24 23 2.10. Attach two parts 40 and assemble using connecting bar 20, straighten with screw bolt 25 (M5x10) and screw nut 24 (M5) – (D) D 24 1 D 24 2 D 20 25 25 1 16 2 3 Standard Greenhouse Basic set Length - 4 meters 3. Assembling of intermediate arch Table No.3 (dimensions in mm) Lay out all the assembling parts on the ground (according to the scheme bellow) Part 31 A No. E Quantity mm 31 1 30 2 42 1 1395 23 4 М5х35 24 4 М5 E 42 A 30 30 View of the finally assembled intermediate arch A A A 23 24 1 2 3 A 3.1. Attach two parts 30 (semi arch) to part 31 (arch). Fasten using screw bolt 23 (M5x35) and screw nut 24 (M5) – (A) 3.2. Attach part 42 to part 31. Fasten using screw bolt 23 (M5x35) and screw nut 24 (M5) – (E) 4 E E 23 24 1 Standard Greenhouse Basic set Length - 4 meters 2 17 4. Assembling intermediate arch to the front wall with door frame F F 49 F 49 49 F B B B 49 F F 49 B 49 B B F F 49 49 B B F 49 B Table No.4 (dimensions in mm) Part No. Quantity mm 49 9 2000 22 18 М5х20 21 18 4.1. Put in assembled front wall with doorframe and intermediate arch into the previously prepared holes in the ground with depths of 24 – 25 cm. 18 Standard Greenhouse Basic set Length - 4 meters 4.2. Assembling sequence: upper crossbar (part 49), two lower crossbars, and then intermediate crossbars – Totally 9 crossbars (Part 49) B 4.3. Using cross – bars ( Part 49, 2 meters long) assemble front wall with door to the intermediate arch, fasten with screw bolt 22 (M5x20) and screw nut 21 – (B,F) B 22 21 1 B B 3 F B 4 F 22 2 5 F 49 21 1 Standard Greenhouse Basic set Length - 4 meters 2 3 19 B 5. Final assembling of the basic “Click Greenhouse” with length 4 m. B B B D B B D D D B B D D G B D N D G 52 N G 49 N 52 N D G G 5.1. Put in assembled back wall with window frame into the previously prepared holes in the ground (depths of 24 – 25 cm). Table No.5 (dimensions in mm) Part 20 G No. Quantity mm 49 9 2000 22 9 М5х20 21 9 25 18 М5Х10 24 18 М5 20 9 52 2 2063 77 6 100-200 Standard Greenhouse Basic set Length - 4 meters B 5.2. Using cross – bars ( Part 49, 2 meters long) aseemble front wall to the intermediate arch – ( B, D) 5.3. Assembling sequence: Assembling sequence: upper cross – bar (part 49), two lower cross – bars, then intermediate cross – bars – Totally 9 cross – bars (Part 49) B 22 21 1 B B B 3 D 24 4 D 24 2 5 D 20 25 25 1 5.4. Put the rod with diameter 10 mm (part 77) into the holes in the ends of arches for straightening the construction. – (GN) 5.5. Attach two parts 52 with arches. (GN) 2 GN 3 G N 22 52 ! Attention! For final assembling you need to release screw bolt 22 (M5x20), attach part 52 and then fasten the bolt once again. Standard Greenhouse Basic set Length - 4 meters 77 1 2 21
© Copyright 2026 Paperzz