KMW Antenna Installation Guide KMW Communications Inc. Base Station Antennas For antenna model ET-X-TS-70-16-62-18-iR-RD General Information for Adjustable Clamp Weight Adjustable Clamp For Mobile Communications 13.2lbs [6.0kg] Hot-dip galvanized steel [SS400] Material Bolts & Nuts Mounting Pole Diameter Bolts/Nuts STS304 Ø3.0~5.0inch [Ø76.2~127.0mm] Required Tool Recommended Torque M8 Socket head bolt 6mm Hex Wrench 120 kgf.cm 104 lbf.in 11.8 Nm 17mm spanner 240 kgf.cm 208 lbf.in 23.5 Nm 13mm spanner 350 kgf.cm 304 lbf.in 34.5 Nm (to attach bracket onto the back of an antenna) M10 Hex. Head bolt (to mount a bracket to the pipe) M8 Hex. Head bolt (to securely hold bracket into a desired tilt ) Step 1 Up part Down part 1. Open the antenna box and take out the adjustable clamp. 2. Inspect all the parts 3. Assemble the Up/Down part onto the antenna using M8 “L” socket head bolt & plain/spring washer Step 2 Antenna Height 73.8” 1. Assemble an upper fixed clamp with M10 Hex. Head bolts provided. 2. Tighten the fixing clamp using the double nut & plain / spring washer. 3. Assemble the lower fixed clamp same as above. www.kmwcomm.com “L” 1784mm Adjustable angle 12° KMW Antenna Installation Guide KMW Communications Inc. Base Station Antennas Mounting kits for ET-X-TS-70-16-62-18-iR-RD For Mobile Communications Step 3 Recommended torque Loosen 4 points bolts to extend adjustable clamp for M8 NUT : Extend the adjustable clamp until the desired 304lbf.in [350kgf.cm] angle is reached using an angle indicator. Tighten all nuts with a torque of 304lbf.in[350kgf.cm], first the inner nut and then the outer nut. Caution! * Remove the second nut before tightening the first nut !!! There must be no open gap between any parts of the bracket that require * Tighten the first nut to the recommend torque then insert the second nut and tighten second nut to the recommended torque tightening. Never use torque wrench on the second nut until the first nut is fully. tightened to the recommended torque specification! www.kmwcomm.com KMW Antenna Installation Guide Mounting kits for ET-X-TS-70-16-62-18-iR-RD KMW Communications Inc. Base Station Antennas For Mobile Communications Step 4 *. Refer to the color coding for RF cables/connectors *. RF Connector recommended torque : 264lbf.in [304kgf.cm] *. AISG Connector recommended torque: 4.3~8.6lbf.in [5~10kgf.cm] (The connector should be tightened by hand only!) *. Waterproof on the connectors Please be careful of damage to connector, down cap and RET by heat if waterproofing need a heat after connect cable. *. Warning! Do not turn on the power for a controller until all the cables have been properly installed. RET Replacement Knob Screw assembly tool 1. Separate RET cable. Note 2. Unscrew two knob screws Need to use a flat-head screwdriver with 10mm width 3. Disconnect an inner cable and 1mm thickness to assemble and separate a RET box. 4. Replace RET If you use under 10mm width tool, Knob Screw could be damaged. Knob Screw Recommended torque : 4.3lbf.in [5kgf.cm] www.kmwcomm.com
© Copyright 2026 Paperzz