Highland Road Pipeline Project – Phase A Capacity

Highland Road Pipeline Project – Phase A
Capacity Improvement Project
City-Parish # 11-ES- PW-0002A (PDP # SGL-C-0003)
Project Start:
Advertise for Bids:
Project End:
% Complete:
January 2011
April
p 2015
October 2016
10% Design
0% Construction
The Highland Road Pipeline Project
includes pipeline segments from the
intersections of Essen Lane and Lee
Drive with Highland
g
Road. It includes
both upsizing of existing forcemain, and
construction of new forcemain in order
to alleviate upstream SSOs.
Generic
Pipe
Collection system pipe sizes range from
less than a foot to over six feet in
diameter.
Flow measurements are taken
throughout the collection system to
determine the correct pipeline size.
New submersible pumps wrapped from
the factory and ready for installation into
wet wells.
As of April 2012
Highland Road Pipeline Phase A Project Facts
FORCEMAIN IMPROVEMENTS:
10-inch forcemain; 4,300 feet
12-inch forcemain; 660 feet
15-inch forcemain; 6,610 feet
18-inch forcemain; 9,080 feet
21-inch forcemain; 4,500 feet
24-inch forcemain;14,770 feet
27-inch forcemain; 4,645 feet
30-inch forcemain; 700 feet
36-inch forcemain; 3,065 feet
42-inch forcemain; 180 feet
Design Consultant:
Evans Graves
Construction Contractor:
To be determined
Estimated Construction Cost: $9,741,000.