Highland Road Pipeline Project – Phase A Capacity Improvement Project City-Parish # 11-ES- PW-0002A (PDP # SGL-C-0003) Project Start: Advertise for Bids: Project End: % Complete: January 2011 April p 2015 October 2016 10% Design 0% Construction The Highland Road Pipeline Project includes pipeline segments from the intersections of Essen Lane and Lee Drive with Highland g Road. It includes both upsizing of existing forcemain, and construction of new forcemain in order to alleviate upstream SSOs. Generic Pipe Collection system pipe sizes range from less than a foot to over six feet in diameter. Flow measurements are taken throughout the collection system to determine the correct pipeline size. New submersible pumps wrapped from the factory and ready for installation into wet wells. As of April 2012 Highland Road Pipeline Phase A Project Facts FORCEMAIN IMPROVEMENTS: 10-inch forcemain; 4,300 feet 12-inch forcemain; 660 feet 15-inch forcemain; 6,610 feet 18-inch forcemain; 9,080 feet 21-inch forcemain; 4,500 feet 24-inch forcemain;14,770 feet 27-inch forcemain; 4,645 feet 30-inch forcemain; 700 feet 36-inch forcemain; 3,065 feet 42-inch forcemain; 180 feet Design Consultant: Evans Graves Construction Contractor: To be determined Estimated Construction Cost: $9,741,000.
© Copyright 2025 Paperzz