CORRIGENDUM DATED 11.05.2017 RFQ CUM RFP DOCUMENT FOR PREPARATION OF PERSPECTIVE PLAN AND CONCEPT MASTER PLAN FOR IDENTIFIED IMC SITES FOR KOCHI BANGALORE INDUSTRIAL CORRIDOR REGION Sl No 1. 2. RFP Section/Clause Number Observations/Queries KSIDC’s response Section 1Point 1 Government of India has envisaged the development of Kochi Bangalore Industrial Corridor (KBIC) for connecting Kochi to the Chennai Bengaluru Industrial Corridor (CBIC) through Palakkad and Coimbatore. 2.1.17 RFQ cum RFP Processing Fee: The RFQ cum RFP submissions shall be accompanied by a Bank Draft of USD 2,000.00 only (USD Two Thousand Only) or INR 1,00,000/- (Indian Rupees One Lakh only) plus Service Tax @15% in favour of “KSIDC”, payable at Kochi, India, as a non refundable RFQ cum RFP processing fee (the “RFQ cum RFP Processing Fee”). Proposed corridor is passing through more than one state. We would like to know whether KSIDC is authorised to undertake works outside Kerala and how? Selected consultant is expected to conduct the study as per the TOR, in order to submit the same to Govt. of India. Requested to kindly reduce RFP cum RFQ processing to INR 25,000/-. No change 3. 4. 5. 6. Proposals unaccompanied with the aforesaid RFQ cum RFP Processing Fee shall be liable to be rejected by the Client. 2.5.1 – Bid Security It is requested to reduce the Bid A bid security in the form of a Security to 5 lakhs Demand Draft / Bank Guarantee, from a scheduled Indian Bank in favour of ‘KSIDC’, valid for 180 (one hundred and eighty) days from the PDD, payable at Kochi, for the sum of Rs 10,00,000/(Rupees Ten Lakhs Only) or US dollars 20,000.00 (Twenty thousand only) shall be required to be submitted by each Applicant (“Bid Security”). Requested to kindly reduce bid security amount to INR 1,00,000/-. 2.6.8 (i) – Members of Requested to increase the consortium consortium members to 4 (four) to pitch in for the robust team for an opportunity of great magnitude. 2.7.3 , Point No (i) Requested to relax the condition All key personnel must be full as follows No Change No Change No Change No Change time/ full time-on-contract employees of the firm. “All key personnel must be full time/ on Retainership contract of the firm “ Also requested to allow individual experts/ freelancers to be fielded as Key personnel with a undertaking from the applicant about their availability during the duration of the assignment 7. 8. 2.9.4 – Clause- A Minimum Qualification Criteria Experience In Planning / Feasibility studies / Detailed Project Report/ Project Management Consultancy of Industrial Corridor/Economic Corridor of length not less than 500 km Or Experience of preparation of Concept plan/ Regional Development/Structure/Strate gy Plan for an area not less than 10000 sq km Requested to allow freelancer consultants. Requested to relook into the criteria and modify the clause as requested below” Experience In Planning / Feasibility studies / Detailed Project Report/ Project Management / Regional Perspective Plan Consultancy of Industrial Corridor/Economic Corridor of length not less than 500 km during the last ten years Or Experience of preparation of Concept plan/ Regional No Change No Change 9. Development/ Infrastructure Development Plan /Structure/Strategy Plan for an industrial corridor of not less than 5000 sqkm during the last ten years Requested to change criteria as follows: a) Experience In No Change Planning / Feasibility studies / Detailed Project Report/ Project Management Consultancy of Industrial Corridor/Economic Corridor/ of length not less than 500 km Or Experience In Planning / Feasibility studies / Detailed Project Report/ Project Management Consultancy of Special Economic Zone / Special Investment Region / Industrial Parks having area more than 2000 Acres or Experience of preparation of Concept plan/ Regional Development/Structure /Strategy Plan for an area not less than 10000 sq km Or Experience of preparation of concept plan / regional development plan / Growth Pole studies for and area not less than 200 sq kms. 10. 11. 12. Regional Planning in India is not No Change statutory in nature and also it does not cover physical planning. In addition, regional planning exercises are rarely done in India. The largest SIR of DHOLERA which we have done is 900 sq km . We presume that various locations that mentioned in RFP ' may from 100 to 500 sq km . Clause 2.9.4 (a); Page no. 24 Experience In Planning / Feasibility ………. length not less than 500 km Therefore it is requested to reduce the area from 10000 sq km to 100 to 500 sq km. Proposed consulting opportunity No Change is not for corridor development. We request you to drop this qualification criteria. Please note there are not many No Change economic corridor projects in India, especially of 500 km length. We request the Authority to reduce this to 100 km. Please clarify if assignments like state tourism vision plans, district economic development plan, state PPP strategy etc. would qualify. Please clarify what kind of assignments would 13. Average annual revenue from consultancy services for last 3 financial yearsi.e. 2013-14, 2014-15, 2015-16. 50 crores 14. 15. 16. 2.9.4 Minimum Qualification Criteria Experience In Planning / Feasibility studies / Detailed Project Report/ Project Management qualify as structure / strategy plan. Requested to reduce the average annual revenue from consultancy services for last 3 financial years i.e. 2013-14, 2014-15, 2015- 16 to 45 crores The consultant has informed that Criteria of turnover will facilitate only Multi National Firms and not medium size core Planning firm. Therefore the client requested to match the turnover criteria with respect to the envisage Fees of the Project and bring it down to 25 Cr. Even if we assume that a consultancy organization has been doing two such projects each year along with other works, the turnover of such firms won’t be more than Rs.20 crore per annum. Requested to reduce the threshold limit suitably below Rs.25 crore. Requested to relax the criteria to include area development plans upto 1000 sq.kms. area. No Change. However, the combined turnover of consortium members can be considered. No Change No Change. No Change 17. 18. Consultancy of Industrial Corridor/Economic Corridor of length not less than 500 km Or Experience of preparation of Concept plan/ Regional Development/Structure/Strate gy Plan for an area not less than 10000 sq km No Change 2.9.5 – Technical Evaluation – Requested to clarify on the Firm Size and Experience extent ( project area / length ) to be considered for awarding Specific experience of the marks under this category consultants related to the Assignment. The applicants Requested to give weightage to shall Master Plan / Feasibilities demonstrate their capability studies for Industrial area which with details of are having areas > or equal to relevant experience in 1000 ha . carrying out similar assignments for preparation of strategy/perspective/vision/ma ster plans for industrial corridors/regions involving multisectoral industry and infrastructure projects resource management, etc. Each of the proposed IMC would No Change not be larger than a certain threshold area e.g. 300 acres or 19. Clause 2.9.5 (C); Page no. 24 Adequacy of Work Plan and Approach 20. 2.14 Pre-Bid Meeting so. We request you to peg the threshold qualification criteria to 40% of the anticipated development. E.g. if the larger of the two IMCs is say around 400 acres, the threshold qualification criteria be about 160-175 acres Marking for this section is very Will consider while evaluation. subjective. We request you to induce appropriate objectivity in the marking criteria. The clause mentions that the pre- Pre-bid meeting will not be convened bid meeting will be convened as per the schedule in Data Sheet. However, there are no such details mentioned in the Sheet. Requested to inform, if the Prebid meeting is scheduled for this opportunity, so we can arrange accordingly. 21. 2.18 Required Experience of the Key Personnel 22. Team Leader cum Urban and Regional Planner Team Leader cumUrban & Regional Planner Years of Experience – 25 Requested to relax the conditions No change as requested below ; Years of experience – 20 years Should have Masters in Urban/ Years Should have Masters in Urban/ Regional planning with experience in evolving perspective/ detailed vision plans, Regional development Plans for Economic and Industrial Corridor initiatives of similar size and nature 23. 24. 25. Financial / PPP Expert Regional/ Town planning with experience in evolving perspective/ detailed vision plans, Regional development Plans / Master Plans for Economic and Industrial Corridor / Urban initiatives of similar size and nature Requested for relaxation of experience for Team Lead position from 25 years to 18 years. Please modify the requirement as : “Should have Masters in Urban/ Regional planning / Urban Design with experience in evolving perspective/ detailed vision plans, Regional development Plans for Economic and Industrial Corridor initiatives of similar size and nature.” Please modify as below: “Should be an CA / MBA (Finance) / Economist with experience in market study, demand & supply No Change No Change Modified by including Chartered Accountant. 26. 27. 28. 29. assessment, project funding and familiarity of various PPP approach for project development and implementation, financial structuring of similar infrastructure project.” 2.18 Required experience and Requested to accept masters in expertise of Key Personnel housing and any other stream of Qualifications of Team Leader planning also as eligible - should have Masters in qualifications for this position. Urban/ Regional planning with experience in evolving perspective/ detailed vision plans, Regional development Plans for Economic and Industrial Corridor initiatives of similar size and nature Age of the key staff proposed Requested to allow should not be more than 70 professionals upto 75 years of (seventy) years on the last day age for team leader position, as of submission of proposal. this is a very rare expertise. Requested to kindly remove age limit from proposed key staff. Or else modify the qualification to being a planner with relevant experience in large scale industrial area projects. Key Personnel – Section 2.18 Requested to confirm if overseas CVs/ resources of our parent No Change No Change No Change All key personnel must be full time/ full time-on-contract employees of 30. 31. 32. Group/ Sister company shall be acceptable for Core positions without forming JV/ consortium with our Parent Group/ Sister company. Minimum professional Requested to consider 10 Years experience as Minimum years of Minimum year of Professional Professional experience instead experience of 15 Years of 15 years for the positions other than the team leader Water Expert Requested to modify as requested below Should have Masters in Engineering with “Should have Masters in experience in water sourcing, Engineering/ Environment planning & Engineering or management management of water supply with network and Experience in water sourcing, wastewater recycle and reuse. planning & management of The experience in area of water supply network and Integrated Water Resource wastewater recycle and reuse. Management is desired. The experience in area of Integrated Water Resource Management is desired Inland Waterway Requested to relax the condition transportation expert as indicated below,.,,,,,, Should have Masters in Planning/Engineering Should have Masters in /Management with experience Planning/Engineering in /Management with experience in the firm. All key personnel shall be part of the JV /Consortium. No Change No Change Related infrastructure includes Marine transportation also. 33. 34. 35. planning/advising/managing Inland water way transportation projects and related infrastructure Clause 2.18.1, position numbers 6, 7 & 8; Page no. 34 Inland Waterway Transportation Expert; Transportation Expert and Railway/ Multimodal Logistics Expert Environment Expert Master in Environmental Science or Engineering or equivalent with experience in environmental impact assessment, resettlement and rehabilitation, environmental management plan, sustainability and clean Development mechanism. Section 5- Terms of Reference ,item B1.2 Survey and Data Collection Undertake reconnaissance survey of the site area and conduct topography planning/advising/managing Inland water way/ marine transportation projects and related infrastructure Team requirement stresses on 3 No Change subsectoral experts within the Transportation domain. We request that number of experts from Transport sector be reduced to two. This will also bring down costs for KSIDC. No Change Requested to relax condition as requested below. Master in Science / Environmental Science / Engineering / Management or equivalent with experience in environmental impact assessment, resettlement and rehabilitation, environmental management plan, sustainability and clean Development mechanism. As per ToR it is given to No Change understand that the scope of the consultant is to identify locations for establishing IMCs within the corridor . In the absence of the extent of the IMCs and survey of the project site 36. 37. 38. Section 5: TOR, GIS and mapping related delineated corridor area, it will be very difficult to compute the cost for carrying out Topographic survey. in this case, the client requested to consider the following; . “Undertake reconnaissance survey of the site area and study the topography with the available date for the delineated region and IMC sites” Requested to indicate the tentative sizing for IMC sites (in ha) to be developed in two states. This will assist in arriving the pricing for topo survey in the Stage-2 work of the proposed assignment. The RFP requires the consultant to conduct technical surveys on the IMC sites. Please clarify what is the maximum area of IMC which will be required to be master planned / surveyed. 1. Is there any extent for map/Satellite Image Consultant has to identify the size of the proposed IMC Consultant has to identify the size of the proposed IMC 1. Consultant has to identify the size of the proposed IMC. procurement (Two States Kerala & Tamil Nadu)? 2. What is the Scale of the Digital maps to submit? 3. Is there any existing Spatial Data Management Plan/Format maintained by the Client? 39. 40. 41. Section 5. Terms of Reference 5.4 Detailed Scope of Services Part A: Perspective Plan for Kochi Bengaluru Industrial Corridor (KBIC) A.1 General Overview and Data Collating (b) Maps / satellite imagery2 for project influence region. (2 Selected Consultants will be provided with Satellite Imageries, as detailed in the Note.) Regarding satellite imagery A2. Regional Profiling leading to Delineation of the Kochi Bengaluru Industrial Corridor 2. Consultant has to submit in a suitable scale. 3.No Requested to confirm whether Yes, the procurement of satellite data procurement of satellite data is in the scope of consultant. is in the scope of consultant. Since Survey of India does not give satellite imagery maps to private agencies, it is requested that Client should provide the same to the Consultant 1. Requested to confirm whether delineation of alignment of KBIC is in It is informed that satellite imagery maps are available to private agencies from NRSA and KSRSEC (for Kerala). KSIDC can issue necessary certificates to procure the same, if necessary. 1. Please not that the assignment is for preparation of Region The Consultant needs to initially study a broader Kochi Bengaluru Industrial Corridor and through a scientific analysis of various parameters, come up with recommendations on the final delineation / boundaries of the Kochi Bengaluru Industrial Corridor Region in terms of districts / revenue blocks, (The eventual boundaries of the KBIC will be .finalized after detailed consultations with the concerned State Governments and the Government of India.) 42. 43. A4. Identification of appropriate Integrated Manufacturing Cluster (IMC) along the corridor the scope of work or not? If yes, we are of the view that the time mentioned in deliverable and time frame is very less. Further we understand that the time duration specified for each deliverable excludes the time that will be taken for approval by the client. 2. Requested to inform whether Revenue map superimposition is part of scope of work or not. If yes, kindly let us know if you have revenue maps in digitized form or not. 3. Requested to provide tentative alignment of map and coordinates for procurement of satellite data. Requested to provide tentative locations of IMC identified by the client, if any. Requested to confirm whether the approvals from various authorities are not part of this Perspective Plan and Concept master Plan. It may be noted that the delineation of the boundaries will be done during the DPR stage. 2. Yes. Consultant shall procure the revenue map in digitized form. 3. Consultant is expected to provide tentative alignment of map and coordinates Consultant has to identify the size of the proposed IMC The consultant is requested to prepare a Perspective plan and Concept Master Plan only. 44. 45. 46. 47. assignment or not. Requested to inform, If the IMC needs to be prepared in consultation with State, who is the approval authority for the deliverables on IMC. Requested to inform the details of data available for the assignment. Requested to indicate if there is any budgetary estimate available for the proposed consultancy assignment? As per RFP, one IMC each shall be finalised in Kerala and TN. Will KSIDC itself act as nodal agency for finalisation and approval of IMC sites in TN or any other agency need to be coordinated? Approximate area of IMC is an important factor to estimate the cost and arrive at bid value. There is no indication of it in RFP. Hence, it is likely that different bidders will The consultant is requested to prepare a Perspective plan and Concept Master Plan only. The consultant is requested to prepare a Perspective plan and Concept Master Plan only. No The consultant is requested to prepare a Perspective plan and Concept Master Plan only. Consultant has to identify the size of the proposed IMC. 48. 49. estimate various sizes of IMCs and quote accordingly which will lead to disagreements during contract later. It may also be appreciated that such ambiguity in tender is against the principle of equity. Hence, we request you to specify approximate area for each IMC (Kerala and TN) for the purpose of bid estimation so that every bidder will assume their cost on the same basis ensuring principle of equity Point no. 5.2, second bullet on We request you to share details page no. 71 of the nodal agency in Tamil Nadu government for the subject project. Is consultant expected to interact directly with TN nodal agency or it will be through KSIDC. Data Sheet Section 5 – 5.5. The project duration mentioned in data sheet and SCC are different. The consultant Special Conditions of requested to advise duration of contract – clause 6.3.1 The consultant is requested to prepare a Perspective plan and Concept Master Plan only. Any clarifications required will be provided by KSIDC. The consultant is requested to prepare a Perspective plan and Concept Master Plan only. It is clarified that the study duration is Eleven (11) months. Duration of project – 11 assignment. months The duration of assignment shall be 3 (three) years, with option to extend by a further two (2) years with mutual written agreement. 50. 51. SCC of the RFP states (6.3.1) that duration of contract is 3 years with option for extension by 2 years. However in Data Sheet of RFP (Section 5.5) it is mentioned that Project duration is 11 Months. Since the bid price has to be estimated based on the time period involved, please confirm the expected duration of the assignment. Clause 3.2 Form 3B Normally the period is defined Format for Pre-qualification by client for example the Proposal (Eligible Projects) projects executed in last 5 years Project Specific Experience or 10 years will be considered. Since no time frame is mentioned in this case so the Consultants are assuming that The consultant is requested to prepare a Perspective plan and Concept Master Plan only. It is clarified that the study duration is Eleven (11) months. Yes 52. Form 3B format for PreQualification Proposal & Form 3I Format for Technical Proposal 53. 54. 55. General Manmonths of Key Personnel client will consider projects without any timeframe. Requested to confirm whether Client Award Letter, proof of official communication from the Client, Invoices, Contract extract or any other such documents will be accepted as supporting evidence for Project experience? Please confirm. If the consultant has carried out a project (as a sub consultant) for the Group/ Sister Company, in that event will the certificate issued by the Group/ Sister Company be accepted as evidence towards project experience? Please confirm. Will project experience of parent Group/ Sister company be acceptable for evaluation without the Group/ Sister company forming part of the consortium The consultant requested to advise individual man-months for various positions mentioned Proof for the submission of draft report/concept master plan along with the copy of agreement shall be considered for evaluation of projects The receipt of payment (if any) shall be certified by the internal auditor. No. The work has to be certified by the respective client. No It may be noted that the assignment is for formulating a Perspective Plan and Concept Master Plan and NOT for preparation of Detailed Project under clause 2.18 Required Report. Hence the necessity for Experience and Expertise of key indicating the man months required for completion of the study does not personnel/ staff. arise. 56. General Manmonths of Technical Staff The consultant further requested to confirm home and field office inputs. The Client is requested to support technical Support specify positions and associated manmonths. This will help client in ensuring required number of man-months for successful quality delivery of project. 57. General Requested to inform, if any background studies/ reports are carried out for this opportunity. If yes, then please inform if the consultant shall be able to view them at the Client’s premises. 58. Payment upon termination It is requested to amend Clause 6.5.5.2 (a) of GCC as follows: Clause 6.5.5.2 (a) of GCC “Remuneration pursuant to relevant clauses for Services satisfactorily performed to It may be noted that the assignment is for formulating a Perspective Plan and Concept Master Plan and NOT for preparation of Detailed Project Report. Hence the necessity for indicating the man months required for completion of the study does not arise. KSIDC has prepared a report for developing individual nodes along the Kochi- Palakkad region. This can be facilitated to the selected consultant. KSIDC would prefer to have original ideas from the consultant. No change reasonable satisfaction of Client prior to the effective date of termination’ 59. Conflict of Interest by Consultant, sub-consultants and affiliates Clause 6.6.2.3 of GCC 60. Clause 6.1.1- Defect liability period 61. Limitations of Consultant’s Liability This clause seems to be No Change unenforceable with potential sub-consultants and affiliates. We request you appropriate remove or amend this clause. Clause 6.1.1 (s) states that the Defect Liability Period is one year Performance Security must be from the date of acceptance of final valid till the end of defect report by KSIDC. liability period. However RFP does not specify how much is the Defect Liability Period. Since it is a critical parameter affecting consultant performance, request you to specify the Defect Liability Period There is no mention of overall No Change cap of the Limitation of Consultant’s Liability. In the Clause 6.6.8 of GCC and SCC absence of such an umbrella clause, Limitation of Consultant’s Liability would be open to interpretation. It is requested to insert a clause to cap aggregate Limitation of Consultant’s Liability whether under the contract, in tort or otherwise to a maximum of 10% of the Financial Fee proposal as an umbrella limitation. 62. Limitation of liability as defined under 6.6.8 Shall include incidents such as No Change Public protests/ disruption to field work by project affected persons. 63. 6.6.9- Payment Milestones Payment milestones 2 to 8 are on No Change Submission and Approval. There is no provision stated in the RFP wherein maximum time limit for approval is specified after which payment will be made? It may be noted that the RFP states that Consultant has to make a presentation to KSIDC prior to submission of each Deliverables and Comments given by KISDC to be incorporated in the submission. Hence the submission itself may be treated as achievement of milestones else a maximum time limit may be specified within which KSIDC will advise the comments/approval of submissions failing which it may be considered as Deemed Approval. Request your confirmation/ clarification 64. Payment milestone 2, page no. 119 Submission and Approval of Report ……………. One each in two states of Kochi Bangalore Industrial Corridor Region Currently only two clusters are proposed, one each in two states of KBIC. However in future, during delivery of the assignment if number of clusters increase beyond two, work quantum shall increase for the consultants and hence we propose that in such a scenario payment to consultants should be increased pro-rata basis. No Change. The objective of the study clearly states that “To prepare a Regional Perspective Plan for the Kochi Bengaluru Industrial Corridor (KBIC) Region, along with undertaking Feasibility and preparing Concept Master Plan for establishing one or more Integrated Manufacturing Cluster (IMC) in each of the two (2) KBIC States. The consultant shall keep in mind and follow the vision which is to develop the strategic framework to create a vibrant economic corridor that is viable in all respects”. It is a typographical error crept in the payment milestone. Consultants are requested to identify one or more IMC’s in the interest of both the 65. 66. client and consultant. Payment milestone 5, page no. We request you to clarify The objective of the study clearly 119 Submission and Approval whether it is seven clusters or states that “To prepare a Regional Perspective Plan for the Kochi two clusters. of Report on Finalization of Bengaluru Industrial Corridor Seven Integrated (KBIC) Region, along with Manufacturing Cluster undertaking Feasibility and preparing Concept Master Plan for establishing one or more Integrated Manufacturing Cluster (IMC) in each of the two (2) KBIC States. The consultant shall keep in mind and follow the vision which is to develop the strategic framework to create a vibrant economic corridor that is viable in all respects”. It is a typographical error crept in the payment milestone. Consultants are requested to identify one or more IMC’s in the interest of both the client and consultant. Payment milestone table, page Against each of these milestones, No Change payment comes only after no. 119 & 120 approval, which has no fixed time limit. Hence, we request that 50% of the payment due against each milestone shall be released against submission and remaining 50% be released upon approval. 67. 68. 69. Special Conditions of contract – clause 6.17.210 ……. The seat of arbitration will be Indore and arbitration shall be conducted in English language………… The place of arbitration as stated in RFP (Clause 6.17.210) Liquidated Damages Clause 6.19 of GCC 70. Indemnity Clause 6.21.2 (b) of GCC, Requested to confirm place of The seat of arbitration will be Kochi. arbitration. It is mentioned as Indore, since The seat of arbitration will be Kochi. neither the client office nor the project location is in Indore kindly confirm the place of arbitration. It is requested to delete the No Change clause pertaining to Liquidated Damages as any delays in this assignment may not have direct bearing on delays in operational function and resulting losses to the Client. It is requested to delete the word No Change ‘alleged’ from ‘alleged negligent’ from the sixth line of Clause 6.21.2 (b) of GCC, as it does not provide a fair recourse to the Client to prove any allegation of negligence/ fault against them in order to trigger the indemnity provisions. 71. Payment Schedule Advance It is requested to provide 5% No Change advance against Bank Guarantee since consultants envisage requirement of surveys that requires investment. 72. Office Set-up The Consultants are required to The client can set up the project set-up project office. It is office, preferably at Kochi. Client requested to advise name of the will not provide office space. city where project office is to be set-up. It is further requested to confirm whether client will provide fully furnished office or consultants will have to setup on their own. 73. General 74. 6.21.5.1 It is requested to kindly confirm No. whether an Indian wholly owned Eligibility of wholly owned subsidiary can claim experience Indian subsidiary of of parent Company. international firm Please clarify on point no. No Change 6.21.5.1 of GCC: In case of termination there shall be no liability to consultant post termination unless a dispute/ notice has been issued by client to the Consultant for any defect or breach of contract prior to the date of termination. 75. Note on page no. 40 For the purpose of evaluation of applicants INR 50.0 (INR Fifty only) per USD…………….representati ve exchange rates published by the IMF for the relevant date. Exchange rates for all the No Change currencies are available on daily basis. Requested not to peg the dollar valuations to a fixed number and be considered as per the rate of exchange on that particular date. 76. Point no. 5.2, second bullet on page no. 71 ……………….Kerala and Tamil Nadu in consultation with respective State Government. Requested to share details of the nodal agency in Tamil Nadu government for the subject project. Is consultant expected to interact directly with TN nodal agency or it will be through KSIDC. The consultant is requested to prepare a Perspective plan and Concept Master Plan only. Any clarifications required will be provided by KSIDC.
© Copyright 2026 Paperzz