Disclaimer The content of this communication (and/ or any attached file) is confidential and may be legally privileged. It is intended only for the use of the individual or entity named above, thus, if you are not the intended recipient, you must not disclose or copy its content and must inform the sender as soon as possible. The unauthorized use of the information contained in this communication may result in a criminal offence. The ACP is not responsible for the content of information received from third parties. “Courtesy of the Panama Canal Authority” The Panama Canal connects 144 trade routes across the globe “Courtesy of the Panama Canal Authority” The Expanded Panama Canal “Courtesy of the Panama Canal Authority” Panama Canal Expansion Program Components 17.66 M m3 Atlantic Post Panamax Locks Existing Locks Increase the maximum operating level of Gatún Lake Deepening & widening of the Atlantic entrance 26.7 m ▼ 27.1 m Access Channel ► Deepening & widening of the Gatun Lake & Culebra Cut navigational channels Pacific Post Panamax Locks Existing Locks ▼ 8.7 M m3 Post Panamax Pacific Locks Access Channel 49 M m3 NewDeepening & widening of the Locks► Pacific entrance Maximum size of vessels in existing Locks: 33.5 m 12.04 m 32.3 m 49 m 15.2 m 18.3 m min. 28.3 m max. “Courtesy of the Panama Canal Authority” Maximum size of vessels in new Locks: Summary Schedule of Main Projects with Baseline and Contingency As of 30 April 2014 Activity by quarter (Q) Locks Pacific access channel - phase 1 100% Pacific access channel - phase 2 100% Pacific access channel - phase 3 100% Pacific access channel - phase 4 80% Dredging of the Pacific entrance 100% Dredging Specifications and locks models Access channel % Progress 2007 2008 2009 2010 2011 2012 2013 2014 2015 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 100% Design and build post-Panamax locks 69% Deepening and widening of Gatun Lake and deepening of Culebra Cut Dredging of the Atlantic entrance 87% 100% Increase operating level of Gatun Lake 70% Expanded Canal begins operations Expansion Program progress 75.2% Specifications and design Bidding and contracting Execution Baseline* Baseline Baseline * Baseline from 31 December 2006 including contingency Contingency against baseline Beginning of operations “Courtesy of the Panama Canal Authority”
© Copyright 2025 Paperzz