July Consent Agenda Addendum

High Playground Priorities
Total High Building Priorities
Total Medium Building Priorities
Total Low Building Priorities
Installation of 3 Smartboard Slides
Task
Building
1 Kindergarten Building
4 Kindergarten Building
5 Kindergarten Building
6
7
10
11
Kindergarten Building
Kindergarten Building
Kindergarten Building
Kindergarten Building
Kindergarten Building
Description
Materials
Rehang/repair closet door in special education room
Check for broken hardware
Install surge protector on teacher's computer in the northwest
corner
Repair flashing onto the plastic storage unit and
remove/replace deteriorated tar paper
Clean out roof valleys and apply roofing sealant to the roof that
spans the two gable ends of the building on the south side
Roof sealer 39.97 5gallon Thompson water sealer (hd)
Remove shuttle play structure
Clean gutters on the south end of porch roof
Spray weeds in the play ground
Install the Smartboard from Jana Horne's room
$4,486.00
$1,596.00
$500.00
$121.00
$1,050.00
Cost
NC
NC
NC
20 Kindergarten Building
21 Kindergarten Building
Trim bushes alsong the east property line and pick up trash
Remove rocks from play area
NC
NC
NC
NC
18 Kindergarten Building
Add two 4 lamp flourescent light fixtures to the main classroom http://www.lightingdirect.com/light-concepts-lb-4-32-120-1-4-rearea
48-inch-four-light-flush-mount-ceiling-fixture/p685191
Remove hoses attached to the building
Clean out storage closet where computers are setup
Remove additional white board located to the east of the north
door of the main classroom
1 quart paint
12 Kindergarten Building
Install the Smartboard from Jana Horne's room on a slide,
relocate projector over whiteboard on the north wall. The
Smartboard should move from in front of the existing
whiteboard to the left where the pulldown screen is located.
15 Kindergarten Building
17 Kindergarten Building
3 Kindergarten Building
16 Kindergarten Building
2 Kindergarten Building
Notes
$25.00 High
19 Kindergarten Building
14 Kindergarten Building
Status
$12.00 High
On the southeast corner, trim the end of the support beam
which supports the porch roof. Remove the rotted end and
flash the remaining portion to protect it from water damage.
Scrape and touch up paint on the exterior. Scrape, prime and
paint window trim.
2 gallons paint - 2 quarts primer
On the Southwest gable end, cover hole with screen to prevent
nesting birds
Treat the roof with a water bleach solution to kill moss
Replace or remove the air return furnace filter that is mounted
behind the grille
Check for furnace filter
13 Kindergarten Building
Priority
$15.00 High
$160.00 High
High
High
High
$45.00 High
79.94 ten gallons
Completed
Completed
$7.00 High
$75.00 High
$4.00 High
$75.00 High
$8.00 High
High
High
Completed
$250.00 Medium
Medium Completed
Medium
$15.00 Low
http://www.diversitrack.com/index.htm
http://www.kohdesign.com/SmartBoardRailBracket.html
$350.00 Low
Main Building
1 Main Building
2 Main Building
3
5
7
8
Main Building
Main Building
Main Building
Main Building
Clean and repair gutters on the north and south side of the
building
Paint the front entry walls as needed
Attach the bookcase on the south wall inside the principal's
office to the wall with bracket
Get load limit letter for the lofts and place in office file
Exterior -- dispose of broken basketball rim
Exterior -- Dispose of tire filled with concrete
13 Main Building
Library room -- repair/replace south wall emergency light
17 Main Building
18 Main Building
21 Main Building
Room 105 -- Replace/Repair the emergency light
Room 106 -- Mount new Smartboard
Room 107 -- Mount the new Smartboard
28 Main Building
32 Main Building
4 Main Building
6 Main Building
10 Main Building
11 Main Building
14 Main Building
16 Main Building
22 Main Building
24 Main Building
25 Main Building
26
30
33
35
12
Main Building
Main Building
Main Building
Main Building
Main Building
15 Main Building
19 Main Building
20 Main Building
9 Main Building
High
$35.00 High
NC
NC
NC
NC
High
High
High
High
http://www.hansenwholesale.com/lighting/progress/model.asp?
Mfg=PG&ModelNo=PG-PE007-30&source=Froogle&kw=PG-PE00730
http://www.hansenwholesale.com/lighting/progress/model.asp?
Mfg=PG&ModelNo=PG-PE007-30&source=Froogle&kw=PG-PE00730
Room 110 -- Clean/paint wall under the whiteboard -- west wall
Room 111 -- Touch up paint at the front of the room
Room 116 -- Patch & paint green wall
Women's bathroom -- lubricate bathroom fan
Exterior -- sweep new basketball court
Room 105 -- Patch holes in wall and paint light blue on interior
wall around & behind the book case.
1 quart of paint
Room 106 -- Patch and paint under the wall mounted LCD
projector
Room 106 -- Remount screen under the LCD Projector
Exterior -- Paint additional 4-square area on asphalt path
Main Building
Room 106 -- Mount new Smartboard on slide
21a
Main Building
23 Main Building
Room 107 -- Mount the new Smartboard on a slide option 2
Room 109 -- locate, repair buzzing flourescent fixture
27 Main Building
29 Main Building
Room 110 -- reroute CAT 5 cable or install wireless card to the
computer located on the west wall near the whiteboard
Room 111 -- Reroute the CAT 5 cable
34 Main Building
Room 116 -- Install cover plate on open cable box - west wall
West hall under attic stair -- patch and repaint area damaged by
attic ladder
36 Main Building
Women's & men's bathroom -- mount handwashing signs
Completed
$45.00 High
$45.00 High
$45.00 High
$45.00 High
http://www.hansenwholesale.com/lighting/progress/model.asp?
Mfg=PG&ModelNo=PG-PE007-30&source=Froogle&kw=PG-PE007Room 111 -- Repair/replace emergency light
30
Room 116 -- Install new Smartboard
Clean window screen in principal office
NC
Centralize and glean school board material located throughout
the building and place in one location
NC
Exterior -- Paint exterior doors
1 gallon exterior paint
Exterior -- Put water protectant on airconditioning compressor
enclosures
1 gallon water sealer
Library room -- Rework CAT5 cabling in computer area, cables
pass underfoot
Room 105 -- Properly install the CAT5 plate behind the white
board
Room 107 -- move the existing SmartBoard to the kindergarten
building
Room 109 -- Reroute extension cord used for the document
camera -- install power strip with right angle plug behind book
case on east wall
Room 109 -- Touch up white paint on the east wall near the
white board
18a
31 Main Building
NC
NC
NC
Striping paint
http://www.diversitrack.com/index.htm
http://www.kohdesign.com/SmartBoardRailBracket.html
http://www.diversitrack.com/index.htm
http://www.kohdesign.com/SmartBoardRailBracket.html
$45.00 High
$45.00 High
Medium
Medium
$35.00 Medium
$35.00 Medium
$50.00 Medium
$2.00 Medium
$0.00 Medium
$18.00 Medium
$15.00 Medium
$15.00 Medium
Medium
$35.00 Medium
Medium
32.98 a gallon (hd)
$15.00 Medium
32.98 a gallon (hd)
$15.00 Medium
$15.00 Medium
32.98 a gallon (hd)
$35.00 Low
$350.00 Low
$350.00 Low
Low
Low
Low
$1.00 Low
NC
4 - 8 x 10 frames
Low
$35.00 Low
Multipupose Building
3 Mulitpurpose Building
Repair/replace west & north doors, sharp metal torn from door
4 Mulitpurpose Building
Replace door knob on north & west doors
Remove west and north door tire stops, exposed steel belts
present injury hazard
Install wire roof on storage area
Repair ball cart
Repair broken bench on lunch table
Mount and secure wireless router, protect existing equipment
from balls
Paint storage area inside
http://www.popularhardware.com/exits.asp?idCategory=88
Install border and woodchips around slide play structure
See separate price list
5
7
8
1
Mulitpurpose Building
Mulitpurpose Building
Mulitpurpose Building
Mulitpurpose Building
2 Mulitpurpose Building
6 Mulitpurpose Building
$400.00 High
$400.00 High
NC
NC
NC
Primer and 1 gallon paint (paint w/primer)
High
$35.00 High
$30.00 High
Medium Completed
Medium
$35.00 Low
Outdoor Play Areas
9 Outdoor play areas
$4,486.00 High
32.98 a gallon (hd)