UCTA November Luncheon: Fast Track Replacement of Existing 72inch and 90inch Pipeline Sections during 60day Shutdown Window Featuring: Mike McCure, P.E., M.ASCE with Black & Veatch Corpora on Steve Metzler, Manager with Tarrant Regional Water District ____________________________________________________________________________________ Special Thanks to Our Date: Lunch Sponsors Wednesday, November 16, 2016 11:30 am 1:00 pm Lunch served at 11:35 am Location: Texas Star Golf Coarse 1400 Texas Star Pkwy Euless, TX 76040 Cost: $40 Individuals No Charge with Registration Municipal Employees, Active Military, Students Click HERE to decline. PDH Credits are available The North Chapter of UCTA is pleased to announce Mike McCure and Steve Metzler for our November luncheon. Scope/Project Description: The project involves the replacement of two separate sections of the Tarrant Regional Water District (TRWD) existing 72inch Cedar Creek (CC) and 90inch Richland Chambers (RC) raw water pipelines. The CC and RC pipelines are existing parallel PCCP pipelines installed within a 130foot easement. The pipelines convey water from Cedar Creek Lake and RichlandChambers Reservoir. The CC and RC pipelines were installed in 1971 and 1984, respectively, and supply raw water to the city of Fort Worth, Arlington, and various other customer cities. The CC and RC pipelines are being replaced as part of a highway expansion project where State Highway (SH) 360 is being improved to include additional main lanes and frontage lanes that cross over TRWD's existing pipeline corridor. The width of the highway R.O.W. is approximately 1,000 feet at the location where the existing pipelines cross. Mike McCure, P.E., M.ASCE with Black & Veatch Corporation Mike McCure is a Senior Project Manager for Black & Veatch with over 26 years of experience in the design and development of water conveyance projects, including large diameter pipelines and high capacity pump stations. He has provided leadership in a wide range of project activities including project management, design management, and construction management. Mike is the Project Manager for the engineering, design, and construction phase services of the TRWD SH360 Pipeline Crossing project. Mike has a BSCE degree from the University of Illinios. Steve Metzler, Manager with Tarrant Regional Water District Steve Metzler is a military veteran with a Civil Engineering degree from Texas A&M. Steve has served in the water resources industry in the public and private sectors for the past 16 years. He is currently the Water Infrastructure Delivery Engineering Manager at Tarrant Regional Water District and leads a team of engineers and technicians that are responsible for replacing, maintaining, and enhancing the existing water conveyance systems for the District to include chemical dosing, water storage, pump stations, and pipelines. Interested in joining UCTA? Whether you are a contractor, manufacturer, engineer or municipal employee, the opportunities available to you and your company through UCTA educational programs, training and networking with peers are benefits you will quickly realize as a UCTA member. Click HERE to complete the online membership registration. _________________________________________________________________________ Would you like to receive invitations to our events? Click HERE to join our list UCTA, 1233 West Loop S, Ste 900, Houston, TX 77027 SafeUnsubscribeâ„¢ {recipient's email} Update Profile | About our service provider Sent by [email protected] in collaboration with Try it free today
© Copyright 2024 Paperzz