Training Ship DANMARK F.1. to F.9. Paintwork: Bottom – Boot Top & Top Sides. Details: Ship Outboard. Problem: Maintenance of steel outboard. Job description: Figurehead, ornaments fore, ornaments aft, wood rails, zinc anodes and propeller to be covered prior to initiation of sandblasting and paint work. Ship's bottom, boot-top and sides to be emulsion cleaned for oil and grease and high-pressure washed at min. 220 bar operating pressure at nozzle. Ship's bottom to be spot blasted where required to SA 2½ ISO 8501-1. Expected area 100 m2 Boot top to be mechanically cleaned/spot blasted where needed. To SA 2,5 Expected 60 m2 Ships top-sides to be cleaned mechanically/spot blasted where needed To SA 2,5. Expected 50 m2 Ship´s top-sides to be repainted according to Hempel specs. Ship's bottom and boot-top to be repainted according to Hempel specs. Bottom red. Water line belt – Green. At transitions on topsides, any abrasions of paint to be smoothed and touched up. Brown line on the fore and aft. ship to be repainted according to Hempel specs. Draught marks and Plimsoll marks to be repainted according to Hempel spec. Spec: F-1 to 9 Page 1 of 4 17-02-17 Tools, scaffolding and crane: Supplied by yard. Spare parts: Paint to be supplied by Owners. Enclosure: Hempel paint specifications: Area: Bottom, Boot-top, Topside above water line and Draught marks Spec: F-1 to 9 Page 2 of 4 17-02-17 Spec: F-1 to 9 Page 3 of 4 17-02-17 Brown line is to be repainted on to the hull Brown lines aft Spec: F-1 to 9 Page 4 of 4 17-02-17
© Copyright 2026 Paperzz