District 7 10-Year Capital Highway Investment Proposal (2016-2025) Cover Picture DECEMBER 2015 Prepared by Office of Transportation System Management DISTRICT 7 10-YEAR CHIP District 7’s 10-Year Capital Highway Investment Plan (CHIP) communicates the next 10-years of planned projects in the district. The planned projects align with the goals and objectives set in the Minnesota 20-Year State Highway Investment Plan (MnSHIP). This CHIP, along with those of the seven other districts in the state, will meet the investment targets outlined in the 2013 MnSHIP for the next ten years. The 10-Year CHIP includes: • An overview of the district, including a map of highway network type. (7-3) • A summary of planned investments split into two planning periods: Years 1-4, which are a part of the state’s Statewide Transportation Improvement Program (STIP) and Years 5-10 which constitute the remainder of the CHIP. MnDOT views projects in the STIP as commitments while projects in years 5-10 have more uncertainty but are planned to be delivered. (7-3) • Historic and projected performance in the district, to give context to the impact of the planned investment program. (7-4) • A description of program highlights, changes from the last CHIP, and remaining risks at the district level assuming the 10 years of projects are implemented. (7-4) • Investment strategies for the major investment categories, detailing how each MnDOT district plans to most efficiently deliver projects. (7-5) • A list of projects for the next ten years, broken into investment categories, and mapped by year. Only projects with a construction cost of $1 million and more are listed here; there are additional smaller investments which are not represented in the list. Projects listed in years 5-10 are not formal commitments of the agency and are likely to change in scope, projected cost, or projected year. This CHIP is updated annually and reflects MnDOT’s plans at a snapshot in time. By comparing these plans year-to-year, changes in the planned program are apparent. Updating this on an annual basis allows a greater degree of transparency with stakeholders, and aligns with MnDOT’s annual Major Highway Projects Report. The 2013 MnSHIP guides the overall direction of the 10-Year Capital Highway CHIP until the next MnSHIP is due in January 2017. To obtain more information or become more involved, contact District 7 Transportation Planning Director, Lisa Bigham, at lisa.bigham@ state.mn.us or 507-304-6195. District 7 10-Year CHIP, Total Investment Per Year (millions of dollars) $120 $100 $80 $60 $40 $20 0 PAGE 2016 7-2 2017 2018 2019 2020 2021 2022 2023 2024 2025 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN District 7 shares the southwest portion of Minnesota with District 8. It has two regional offices located in Mankato, and Windom. Mankato is also a Metropolitan Planning Organization. District 7 offices are staffed by 291 full-time employees. Major industries in the district include agriculture, retail trade, and health care and social assistance. There are 20 truck stations located in District 7, two of which are at regional offices. The district has 484 bridges that are ten feet or greater in length and 492 miles of rail. District 7 Boundaries Counties* Centerline Miles 1,326 Lane Miles 3,282 High Mast Lights 29 Culverts 5,674 ¢ + @ A ã ? Blue Earth, Brown, Cottonwood, Faribault, Jackson, Le Sueur, Martin, Nicollet, Nobles, Rock, Sibley, Waseca and Watonwan @ A Î ? 1 x ) @ A Ì ? @ A â ? @ A ¼ ? r ) x ) o ) 3 x ) @ A̧ ? @ A ó ? @ A ¼ ? @ A ó ? @ A̧ ? @ A̧ ? @ A̧ ? 7 w ) ? @ A Ã @ A È ? x ) @ A É ? 2,000,736,072 VMT/Capita 7,035 @ A » ? @ A í ? Waseca @ A ± ? @ A Ã ? @ A Ã ? @ A Ã ? @ A » ? y ) r ) x ) @ A Ü ? @ A ï ? @ A Ä ? @ A Æ ? w ) $ a " ! Fairmont @ A Å ? r ) @ A ± ? @ A b ? Worthington $ a " ! @ A À ? y ) $ a " ! @ A ¿ ? @ A » ? @ A ² ? v ) Interstate (146 miles) National Highway System Non-Interstate (689 miles) Non-National Highway System - (495 miles) Based on ATP boundaries VMT=Vehicle Miles Traveled on Trunk Highways * ** Planned Investments for STIP (2016-2019) and Years 5-10 (2020-2025) STIP 2016-2019 2020-2025 RC $5M (1%) AP $7M (2%) IR $0 (0%) AP $6M (2%) BI $4M (1%) PS $47M (13%) PS $43M (11%) BI $5M (1%) RC $27M (7.8%) PC $168M (46%) TS $20M (5%) TS $15M (4%) RI $38M (10%) IR $0 (0%) PC Pavement Condition BC Bridge Condition RI Roadside Infrastructure Critical Connections Total Investments: $363.3 M Asset Management PC $201M (52%) BC $70M (18%) BC $69M (19%) RI $27M (7.5%) o ) @ Ä ? @ A Ë ? Annual VMT** @ A Ü ? @ A Ü ? @ A Ü ? @ A ó ? $ a " ! 284,195 @ A á ? y ) @ A Þ ? @ A ¼ ? Population 2013 @ A º ? @ A ± ? Mankato @ A Ü ? r ) @ A ó ? 54 St Peter o ) @ A Ê ? Overhead Signs @ A ù ? @ A ã ? @ A ² ? ? @ A Á @ A º ? ? @ A ù @ A e y? ) ? @ A ù y ? ) @ A » o ) o ) @ A Â ? @ A » ? @ A ² ? @ A Ã ? @ A ¼ ? 1 New Ulm @ A d ? o ) w ) @ A̧ ? @ A ± ? @ Ä ? o ) r ) @ A̧ ? y ) @ A ã ? o ) @ A ± ? @ Prague A º New? @ A̧ ? @ A̧ ? @ A â ? @ A ã ? @ A ã ? r ) 6 @ A Ã ? Noise Walls @ A » ? @ Ä ? @ A Ò ? @ ¾ A ¾ ? ? @ A y ) @ A © ? @ A ¼ ? Metro 8 @ A ± ? @ A ² ? w ) @ A ã ? 4 @ A̧ ? y ) ¢ + ¢ + 2 Total Investments: $389 M IR Interregional Corridor Mobility TS Traveler Safety BI Bicycle Infrastructure RC Regional + Community Investment Priorities AP Accessible Pedestrian Infrastructure PS Project Support DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-3 $̀ " ! Program Highlights The current 10-year CHIP for District 7 places a large emphasis on pavement preservation; the district will also be completing some fourlane expansion and a major bridge replacement project. The four-lane expansion had been legislatively mandated for MN 60 from Windom to St. James. Of that mandate, the only remaining project is the “west gap” (Windom to Mountain Lake). The significant bridge project is on US 14 at the east edge of New Ulm. Two bridges, one over the Minnesota River and the other over Front St. and the Canadian Pacific Railroad are currently in the STIP for FY 18-19 construction with a total of $43M in construction cost. Notable Changes from Previous CHIP None. Remaining Risks High • Urban preservation projects—resurfacing not adequate (local infrastructure needs require reconstruction). • ADA improvement costs are increasing due to better compliance standards. • Project support resource needs are high—both internal and external resources, and external resources takes funding that would otherwise go to fund Non-NHS system preservation. • Non-NHS pavements continue to decline without repairs and deterioration rates accelerate so that the delayed cost to fix escalates to a much higher-level fix. Medium • Not enough bridge and road construction to fund additional emergency projects due to environment/weather (e.g. erosion, flooding). • Turnbacks: MN 254, MN 263, MN 264 – identified on turnback list and 10-year plan (preservation project) • Flexible turnback dollars should be made available to correct minor deficiencies so roadways can be turned back • If safety improvements are identified but are not eligible for HSIP funding, it will be difficult to fund. Meets or Moderately Significantly exceeds below below targets target target Measure District 7 Historic Performance Statewide Plan Policy Measure Bridge Preservation* NHS - % Poor ≤2% >2-5% >5% Non-NHS - % Poor ≤8% >8-11% >11% Interstate, % of miles poor ≤2% >2-5% >5% Pavement Preservation Non-Interstate NHS, % of miles poor ≤4% >4-7% >7% Non-NHS, % of miles poor ≤10% >10-13% >13% Target 2009 2010 2011 2012 2013 2014 0 34 47 38 37 42 33 Safety Fatalities Bridge Preservation* Condition: NHS - % Poor <2% 1.0% 0.3% 0.2% 0.2% 1.8% 5.8% Condition: Non-NHS - % Poor <8% 3.4% 3.4% 3.4% 2.4% 1.3% 2.7% Ride Quality Poor - Interstate, % of miles <2% 3.1% 0% 0% 1.0% 3.3% 3.8% Ride Quality Poor - Non-Interstate NHS, % of miles <4% 7.2% 4.8% 5.4% 7.0% 3.3% 4.0% Ride Quality Poor - Non-NHS, % of miles <10% 6.7% 5.9% 11.3% 9.0% 6.3% 7.3% Pavement Preservation Average travel speed I 90 Average travel speed US 169 Mobility Average travel speed US 14 > 55 MPH Average travel speed MN 60 Average travel speed MN 23 *Data for NHS/nonNHS are actually Arterial/Non Arterial Meets or exceeds target PAGE 7-4 Moderately below target Significantly below target 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN District 7 Highway Investment Strategies • Continue implementing bicycle accommodations in priority areas and routes as part of pavement and bridge projects. Asset Management • Continue addressing ADA needs in communities through standalone and preservation projects. • Urban Reconstruction – Because of the difficulty to program these with current funding levels and the high cost per mile that urban reconstruction projects render, a city has been asked to finance MnDOT’s share up front with a payback schedule. • Coordinate bicycle and pedestrian improvements with local planning efforts such as State Health Improvement Program, Active Living and Safe Routes to School. • Continue to assess pavement condition and evaluate options to respond to those highways that display the highest need that is cost efficient and will optimize pavement life. Regional and Community Investment Priorities & Project Support • Work with local partners to identify and develop projects that compete for funding from statewide programs like TED, or other opportunities that arise. • Pursue turnbacks of Non-NHS roadways by working closely with local jurisdictions and optimizing funding sources. Traveler Safety • Implement strategies identified from District Highway Safety Plan that would be eligible for funding from the HSIP program. • Anticipate and provide for funding for supplemental agreements, cost overruns, incentives, right of way costs and consultant needs. • Coordinate safety investments with other preservation projects and with local jurisdictions to leverage funding and serve multiple purposes. Critical Connections District 7 Projected Performance Statewide Plan Policy Safety Bridge Preservation* Pavement Preservation Measure Target Fatalities 2014 Actual 2019 2025 Projected Projected Analysis 0 33 N/A Condition: NHS - % Poor <2% 5.8% 3.4% Condition: Non-NHS - % Poor <8% 2.7% 1.4% 4.9% The bridge condition target for the non-NHS is expected to be met. NHS bridge condition is projected to improve 2.8% but remain slightly below target through 2025. Ride Quality Poor - Interstate, % of miles <2% 3.8% 1.1% 5.2% Ride Quality Poor - Non-Interstate NHS, % of miles <4% 4.0% 4.5% By 2025, condition on the Non-Interstate and Non-NHS 8.9% will worsen dramatically. Condition on the Interstate is expected to decline slightly and fall below target. <10% 7.3% 26.5% Ride Quality Poor - Non-NHS, % of miles N/A 23.9% Average travel speed I 90 Average travel speed US 169 Mobility Average travel speed US 14 The average travel speed in the district will remain above target for the coming 10 years. (IRC Model, 2011 run) > 55 MPH Average travel speed MN 60 Average travel speed MN 23 *Data for NHS/nonNHS are actually Arterial/Non Arterial Meets or exceeds target Moderately below target Significantly below target DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-5 PAGE 7-6 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN r ) Ì ? A @ ¼ ? A @ Ê ? A @ $! a " ! 18 ! x ) x ) ¼ ? A @ Ë ? A @ É ? A @ x ) 29 x ) ? Ã A @ ¼ ? A @) x o ) ? A̧ @ ã ? A @ ó ? A @ 32 ó ? A @ ó ? A @ ó ? A @ ó ? A @ ¼ ? A @ ? A̧ @ Numbers displayed correspond to project lines in the STIP project list on later pages. Displayed projects listed in the STIP are considered to have funding commitments, and project delivery is in progress. Only projects with a construction cost over $1M are shown. A comprehensive list of all District projects is included in the final ATIP/STIP – contact your local MnDOT district office for more information. x ) STIP Project Map 2016-2019 o ) r ) 7 9 22 ! ? Ü A @ r ) 2018 2017 Æ ? A @ Ü ? A @ Þ ? A @ Ã ? A @ ã ? A @ Î ? A @ ? â A @ 2016 ? A̧ @ 2019 ¼ ? A @ ? Ä @ ² ? A @ » ? A @ ¢ + ¢ + © ? A @ ¢ + ? Ò A @ ± A @ º ? A @ ? y ) ± ? A @ ¾ ? A @? ¾ A @ y ) © ? A @ ? A̧ @ ? A̧ @ ? A̧ @ 4! ? A̧ @? A̧ @ ? A̧ @ ? A̧ @ y ) ? » A @ A̧ @ 25 w â ) ? A @ ? ± A @ ? ã ? A @ º ? A @ e A @ 34 y? » ? A @ ) Ä @ ã ? A @ 6 20? ù ? A @ 19 º ? A @ ù A @ d ? A @ 16 ! 31 ? ² A @ o 23!!? ) 24 ± ? A @ ) o ù ? A @1 o ã A @ ) 11 ? o ) y? » A @ Ü ? A @ o 32) ) 8 ? Ä @ Ü ? A @ ã ? A @ ² ? A @ Â ? A @ ! 8 w ) ± ? A @ Á ? A @ Ü ? A @ o ) Ã ? A @ á ? A @ o ) » ? A @ í ? A @ y ) ? Ä @5 ² ? A @ 17 30 ± ? A @ ? Ü A @ w 12 ) 15 Ü ? A @ 33 28 Ã ? A @ Ã ? A @ Ã ? A @ ? Ä @ » ? A @ y ) ± ? A @ b ? A @ 27 ï ? A @ 13 10 21 » ? A @ !! ? Ä A @! $ a " ! $ a " $ a " ! 14 $ a " ! ? Ä @ ? À A @ Å A @ y ? ) 26 » A @ ¿ ? A @ ? w ) ² ? A @ ï ? A @ v ! ) $̀ " w ) Fiscal Year of Project Construction ? Ã A @ r È ? A @ ) r ) r ) DISTRICT 7 PROJECTS ã ? A @ Glossary of Description Terms ADA: Americans with Disabilities Act BR: Bridge BRS: Bridges CSAH: County State Aid Highway EB: Eastbound Lanes INCL: Including JCT: Junction MED: Medium NHS: National Highway System PED: Pedestrian TMS: Traffic Management System WB: Westbound Lanes DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-7 District 7 Projects for Years 2016-2019 (STIP) of the 10-Year CHIP Number Route County Description Length (mi) Total Construction Cost 2016 1 US 169 Nicollet US 169, FROM 1.0 MI N OF TH 14 TO 1.5 MI S OF SOUTH JCT TH 99, MILL AND CONCRETE OVERLAY & SIGNING 5.5 $11.30 M 2 US 169 Nicollet US 169, FROM 0.6 MI N OF TH 14 TO 0.1 MI S OF TH 99, GRADE, SURFACE AND MEDIAN WORK, REPLACE BR 8846 WITH NEW BR 52X07 & EXTEND CULVERTS 52X02 & 52X03 (CHAP 152) 8.8 $6.00 M 3 US 169 Nicollet US 169, FROM 0.6 MI N OF TH 14 TO 0.1 MI S OF TH 99, GRADE, SURFACE AND MEDIAN WORK, $8M ECONOMIC DEVELOPMENT ADMINISTRATION FUNDS 8.8 $8.00 M 4 MN 19 Le Sueur MN 19, O.787 MI EAST OF SIBLEY/LESUEUR COUNTY LINE, GRADING, REINFORCED SOIL SLOPES AND REPLACE BR 5369 WITH BR 40009, OVER UNION PACIFIC RAILROAD 0.3 $5.70 M 5 MN 4 Watonwan MN 4, FROM 200' S OF 10TH AVE S TO 11TH AVE NE IN ST JAMES, RECONSTRUCT ROADWAY, ADA, ROUNDABOUT AND LIGHTING 1.6 $5.30 M 6 MN 68 Brown MN 68, FROM CSAH 29 TO NORTH JCT TH 4, MILL & OVERLAY AND WIDENING 7.5 $3.00 M 7 US 59 Nobles US 59, FROM IOWA STATE LINE TO S JCT TH 60, RECLAIM & BITUMINOUS SURFACING, REPLACE BR 8530 WITH BR 53X08 AND DRAINAGE 4.0 $2.50 M 8 US 14 Blue Earth US 14, 0.41 MI W OF CSAH 56 TO 0.19 MI E OF CSAH 17, NEAR EAGLE LAKE, INTERSECTION MODIFICATIONS & LIGHTING 2.0 $1.80 M 9 I 90 Nobles, Jackson I90, FROM 1.0 MI E OF CSAH 13 TO TH 60 WB LANES, & FROM TH 60 TO CSAH 5 EB LANES, MILL & OVERLAY & END POST REPLACMENT ON BR 53815 & 53816 20.0 $9.70 M 10 I 90 Martin I90, FROM 0.2 MI E OF TH 4 TO TH 15, WB LANES, MILL & OVERLAY & END POST REPLACMENT ON VARIOUS BRIDGES 14.3 $9.69 M 11 MN 15 Brown MN 15, FROM 0.2 MI S OF TWP RD 46 TO TH 14/TH 15 (7TH NORTH SIGNAL) IN NEW ULM, MILL & OVERLAY AND ADA 8.5 $7.51 M 12 MN 60 Cottonwood MN 60, FROM WINDOM TO WEST OF MOUNTAIN LAKE, RECONSTRUCT FROM TWO LANE TO FOUR LANE DIVIDED HIGHWAY (AC PAYBACK IN 2018) 7.8 $7.30 M 2017 Note: The projects listed are considered to be commitments of MnDOT. Projects may not be delivered exactly as identified or scheduled; some changes should be expected. The STIP is updated annually and reflects the current program of projects. Projects are listed only if anticipated construction costs exceed $1 million. PAGE 7-8 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN Pavement Condition Bridge Condition Roadside Infrastructure Condition Traveler Safety IRC Mobility Bicycle Infrastructure Accessible Pedestrian Infrastructure Regional + Community Investment Priorities Project Support 2016 82% 0% 12% 3% 0% 2% 1% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 50% 0% 20% 30% 0% 0% 0% 0% 0% 0% 93% 0% 0% 0% 4% 0% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 66% 0% 21% 13% 0% 0% 0% 0% 0% 0% 93% 0% 0% 0% 4% 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 97% 1% 1% 1% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0% 2017 DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-9 District 7 Projects for Years 2016-2019 (STIP) of the 10-Year CHIP Number Route County Description Length (mi) Total Construction Cost 13 MN 109 Faribault, Freeborn MN 109, FROM TH 22 TO I90 IN ALDEN, MILL AND OVERLAY AND ADA 10.0 $6.28 M 14 MN 15 Martin MN 15, FROM JOHNSON STREET TO 0.05 MI S OF GOEMANN RD IN FAIRMONT, MILL & OVERLAY, ADA AND REPLACE EXPANSION JOINTS ON BR 46002 3.1 $6.10 M 15 MN 13 Waseca MN 13, 1.5 MI S OF WASECA TO TH 30 IN NEW RICHLAND, MILL & OVERLAY, REHAB BR#81001 & 81002 AND GUARDRAIL REPLACEMENT 10.9 $6.00 M 16 MN 99 Le Sueur MN99, RECONDITION INPLACE BRIDGE #4930 OVER THE MN RIVER IN ST PETER 0.1 $4.90 M 17 MN 22 Blue Earth MN 22, FROM 0.3 MI N OF TH 30 TO 0.1 MI N OF JCT CSAH 15, RECONSTRUCT AND REPLACE BR#5959 WITH NEW BR 07051 (AC PAYBACK IN 2018 & 2019) 10.5 $4.66 M 18 I 90 Rock I 90, FROM 0.3 MI E OF SOUTH DAKOTA STATE LINE TO 2.9 MI E OF JCT TH 23, REHAB BR#9685, 9686, 9689 &9690 3.5 $4.60 M 19 US 14 Brown US 14, FROM 0.1 MI E OF CSAH 27 TO THE WEST LIMITS OF NEW ULM, MILL & OVERLAY 9.8 $3.50 M 20 MN 4 Brown, Nicollet MN 4, FROM JCT TH 68 TO THE NICOLLET/RENVILLE COUNTY LINE, MILL & OVERLAY, D8 IS THE LEAD, D8 SHARE IS $1.3M 8.3 $3.40 M 21 I 90 Martin I 90, FROM 0.5 MI E OF TH 4 TO 1.7 MI W OF CSAH 53 CONSTRUCT CROSSOVERS, CONCRETE REPAIR & REHAB BR 46821, 46822, 46833 & 46834 & REPLACE END POSTS ON BR 46817 & 46818 17.7 $2.62 M 22 US 59 Nobles US 59, FROM N JCT TH 60 TO I90 IN WORTHINGTON, MILL & OVERLAY 1.1 $2.20 M 2018 PAGE 23 US 14 Brown US 14, DESIGN BUILD, OVER MN RIVER, DM&E RR & MSAS 111, 0.4 MI E OF S JCT OF TH 15, REPLACE BR 9200 & BR 9294 (AC PAYBACK IN 2019) 2.0 $27.10 M 24 US 14 Brown US 14, FROM 0.25 MI E OF CO RD 5 IN SPRINGFIELD TO 0.1 MI E OF CSAH 27, MILL & OVERLAY, CONCRETE GRINDING, BITUMINOUS OVERLAY & ADA 14.3 $10.30 M 25 US 169 Sibley, Nicollet US 169, FROM UNION ST IN ST PETER TO TH 93 AT LE SUEUR, NB LANES ONLY, MILL & OVERLAY 9.6 $6.40 M 26 MN 4 MN4, FROM IOWA STATE LINE TO W JCT CSAH 26, MILL & OVERLAY AND REPLACE BRIDGES 3572 & 3878 10.1 $6.10 M 27 US 169 Faribault US 169, FROM 1 MI NORTH OF I90 TO 0.2 MI NORTH OF CSAH 12 IN WINNEBAGO, OVERLAY AND ADA IMPROVEMENTS 7.7 $3.80 M 28 MN 60 MN60, FROM 6TH ST (TH62) TO 490TH AVE IN WINDOM, EB & WB LANES, MILL & OVERLAY 1.8 $3.50 M 7-10 Martin Cottonwood 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN Pavement Condition Bridge Condition Roadside Infrastructure Condition Traveler Safety IRC Mobility Bicycle Infrastructure Accessible Pedestrian Infrastructure Regional + Community Investment Priorities Project Support 61% 0% 24% 1% 0% 0% 14% 0% 0% 63% 3% 6% 5% 0% 0% 23% 0% 0% 77% 14% 4% 1% 0% 2% 2% 0% 0% 0% 93% 0% 0% 0% 4% 0% 0% 0% 73% 7% 15% 5% 0% 0% 0% 0% 0% 15% 75% 3% 7% 0% 0% 0% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 0% 93% 8% 0% 0% 0% 0% 0% 0% 66% 0% 16% 3% 0% 2% 12% 0% 0% 2018 0% 92% 2% 2% 0% 2% 0% 0% 0% 76% 0% 12% 2% 0% 1% 9% 0% 0% 76% 0% 11% 10% 0% 2% 1% 0% 0% 59% 27% 12% 2% 0% 0% 0% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-11 District 7 Projects for Years 2016-2019 (STIP) of the 10-Year CHIP Number Route 29 I 90 County Rock Description I90, WB LANES, FROM THE BRIDGE OVER ROCK RIVER (67806) TO THE ROCK/NOBLES COUNTY LINE, CONCRETE PAVEMENT REHAB Length (mi) Total Construction Cost 7.3 $2.80 M 2019 30 MN 60 Watonwan MN60, FROM 1.2 MI W OF W JCT TH 4 TO 0.7 MI W OF W JCT TH 15, EB & WB LANES, CPR AND BITUMINOUS MILL & OVERLAY (AC PROJECT, AC PAYBACK IN SFY 2020) 12.9 $8.80 M 31 MN 99 Le Sueur MN99, FROM MINNESOTA RIVER BRIDGE TO CSAH 38 IN LE CENTER, MILL & OVERLAY AND WIDENING AND REPLACE BRIDGE 8893 12.6 $8.10 M 32 MN 91 Nobles MN 91, FROM THE S ADRIAN CITY LIMITS TO NOBLES/MURRAY 15.8 $7.5 M COUNTY LINE, MILL & OVERLAY, ADA AND REPLACE CULVERTS 1503 & 8793 PAGE 33 MN 30 Waseca MN30, FROM TH 83 TO NEW RICHLAND, MILL & OVERLAY AND REPLACE BRIDGES 6789 & 8131 10.0 $5.70 M 34 MN 99 Le Sueur, Rice MN99, FROM TH 13 TO TH 21, MILL & OVERLAY AND WIDENING 8.0 $3.90 M 7-12 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN Pavement Condition Bridge Condition Roadside Infrastructure Condition Traveler Safety IRC Mobility Bicycle Infrastructure Accessible Pedestrian Infrastructure Regional + Community Investment Priorities Project Support 89% 0% 4% 7% 0% 0% 0% 0% 0% 2019 84% 8% 7% 1% 0% 0% 0% 0% 0% 56% 6% 15% 22% 0% 1% 0% 0% 0% 68% 11% 11% 2% 0% 0% 8% 0% 0% 68% 24% 7% 1% 0% 0% 0% 0% 0% 62% 0% 10% 28% 0% 0% 0% 0% 0% DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-13 PAGE 7-14 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN x ) Ë ? A @ 45 43 $! a " ! ¼ ? A @ Ê ? A @ É ? A @ x ) 47 53 x ) x ) x ) x ) ? Ã A @ ¼ ? A @ o ) ? A̧ @ ¼ ? A @ ¼ ? A @ 32 ! ó ? A @ ó ? A @ ó ? A @ ó ? A @ ? A̧ @ ã ? A @ ! ! ó ? A @!! ! 56 ! Numbers displayed correspond to project lines in project list for years 2020-2025 on the following pages. Displayed projects are in the current budget, however they are not yet commitments. Some changes in scope and timing should be anticipated. Ì ? A @ Project Map 2020-2025 r ) o ) 49 r ) ? Ü A @) r ? A̧ @ ! ? Æ A @ 18 11 Ü ? A @ Þ ? A @ 2022 2021 ! 17 1314 ! ã ? A @ Ã ? A @ â ? A @ 2020 Î ? A @ ï ? A @ w ) 4 ! 12 w ) ! w ) 29 2 ï ? A @ ? A̧ @ 2025 2024 2023 w ) Ü ? A @ o ) ? â A @ ã ? A @ w ) Ã ? A @ ! 21 ? Ä @ Å ? A @ 7 59 ? Ä @ 64 ? Ä @ 63 ? Ä @ ? Ä @ Ä @ 37? 24 ? A̧ @ ã ? A @ Â ? A @ Fiscal Year of Project Construction ¼ ? A @ 62 ? Ã A @ r È ? A @ ) r ) r ) DISTRICT 7 PROJECTS ã ? A @ 58 ² ? A @ 48 Ü ? A @ 6 » ? A @ © ? A @ 27 ¢ + ¢ + Ã ? A @ 25 50 y ) 20 ! 54 ! 60 À ? A @ 38 b ? A @ á ? A @ ? » A @ 39 8 44 ! ? ù A @ 36 30 y? » A @ ! o ) ) 35 y ) 23 y ) ? ã A @ 40 ? Ü A @ o ) 16 d ? A @ 15 » ? A @ $ a " ! e A @ )? y » ? A @ 41 » A @ ¿ ? A @ ? y ) Ã ? A @ ! Ã ? A @ v ! ) $̀ " $ a " ! ± ? A @ ± ? A @ ± ? A @ 61 Ü ? A @ º ? A @ ± ? A @ ? A̧ @ ? º A @ ù ? A @ 5 1 o ) ± ? A @ 65 ± ? A @ ! ? Ò A @ 10 ± ? A @ º ? A @19 28 ! !Text ! $ a " 42 !! 55 ! 26 » ? A @ 34 í ? A @ 46 Ü ? A @ ù ? A @ ¾ ? A @? ¾ A @ y ) ? © A @ 3331 ? A̧ @ !! ? A̧ @ A̧ @ ? A̧ @? 9 y ) ? » A @ 3 Ä ? A @ ! $ a " 22 ² ? A @ 52 51 ? ² A @ Á ? A @ ? A @ o ² ) o ) ã ? A @ ? A̧ @ ² ? A @ ¢ + Glossary of Description Terms ADA: Americans with Disabilities Act BR: Bridge BRS: Bridges CSAH: County State Aid Highway EB: Eastbound Lanes INCL: Including JCT: Junction MED: Medium NHS: National Highway System PED: Pedestrian TMS: Traffic Management System WB: Westbound Lanes DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-15 District 7 Projects for Years 2020-2025 of the 10-Year CHIP Number Route County Description Length (mi) Total Construction Cost 0 $1.65 M 2020 1 MN 30 Waseca REPLACE BRIDGES 6789 (RP 166.273) AND 8131 (RP 167.010) 2 MN 60 Cottonwood, Jackson FROM RP 35.783 TO RP 40.613 WB LANES, AND RP 34.584 TO RP 40.613 EB LANES, MAJOR CPR/D.GRINDING 6.2 $6.63 M 3 MN 22 Sibley, Nicollet FROM RP 78.850 TO RP 89.369, RECLAIM 10.5 $6.40 M 4 US 71 Cottonwood FROM RP 28.955 TO RP 41.247, MED. MILL & OVERLAY 12.3 $5.04 M 5 MN 30 Waseca FROM RP 159.122 TO RP 168.943, MEDIUM MILL/OVERLAY 9.8 $4.99 M 6 MN 60 Blue Earth, Watonwan FROM RP 83.941 TO RP 92.464 EB LANES, THICK MILL & OVERLAY 8.5 $4.88 M 7 MN 263 Martin FROM RP 0.000 TO RP 9.699, MEDIUM MILL/OVERLAY 9.7 $3.60 M 8 US 14 Blue Earth FROM RP 130.940 TO RP 133.331 WB, AND 130.940 TO 133.213 EB, MEDIUM MILL/OVERLAY 2.4 $1.91 M 9 MN 93 Sibley FROM RP 1.700 TO RP 5.599, MEDIUM MILL/OVERLAY 3.9 $1.45 M 10 MN 19 Scott, Le Sueur FROM RP 150.492 TO RP 151.780, URBAN RECONSTRUCTION, NEW PRAGUE (YEAR 1 OF 4) 1.3 $1.00 M 2021 11 MN 264 Jackson REPLACE BRIDGES 6973 (RP 3.019) AND 6954 (RP 5.241) 0 $1.00 M 12 MN 30 Cottonwood REPLACE BRIDGE 8166 (RP 73.208) 0 $1.29 M 13 MN 30 Cottonwood REPLACE BRIDGES 8661 (RP 64.483), 8662 (RP 64.905), AND 8663 (RP 63.716) 0 $2.36 M 14 MN 30 Cottonwood FROM RP 56.267 TO RP 73.707, THICK MILL/OVERLAY 17.4 $8.24 M 15 MN 111 Nicollet FROM RP 0.500 TO 9.789, RECLAIM 9.9 $7.00 M 16 US 14 Nicollet FROM RP 104.387 TO RP 117.576, THICK MILL & OVERLAY 13.2 $6.36 M 17 I 90 Jackson FROM RP 57.994 TO RP 65.545 EB LANES, MED. MILL & OVERLAY 7.6 $3.66 M 18 MN 264 Nobles FROM RP 0.00 TO 7.394, MEDIUM MILL/OVERLAY 7.4 $3.48 M 19 MN 19 FROM RP 150.492 TO RP 151.780, URBAN RECONSTRUCTION, NEW PRAGUE (YEAR 2 OF 4) 1.3 $1.00 M Scott, Le Sueur 2022 20 US 169 Faribault REPLACE BRIDGE 5154 (RP 9.182) 0 $3.00 M 21 MN 4 Brown REPLACE BRIDGE 6757 AT RP 58.7 0 $1.58 M 22 I 90 Martin, Fairbault FROM RP 102.168 TO 113.790, EB AND WB, THICK MILL/OVERLAY 11.6 $11.61 M FROM RP 19.897 TO RP 27.857, .2 MI N CR-12, UNBONDED OVERLAY 8.0 $10.25 M 23 US 169 Blue Earth, Fairbault Note: The projects listed are planned projects given the anticipated budget. Projects may not be delivered as identified or scheduled; changes should be expected. These projects are updated annually and reflect the current planned investments. Projects are listed only if anticipated construction costs exceed $1 million. PAGE 7-16 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN Pavement Condition Bridge Condition Roadside Infrastructure Condition Traveler Safety IRC Mobility Bicycle Infrastructure Accessible Pedestrian Infrastructure Regional + Community Investment Priorities Project Support 2020 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 72.1% 0% 11.5% 3.2% 0.0% 2.3% 10.9% 0.0% 0.0% 2021 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 82.1% 0 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% 82.1% 0% 12.4% 5.5% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 72.1% 0% 11.5% 3.2% 0.0% 2.3% 10.9% 0.0% 0.0% 2022 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 82.1% 0% 12.4% 5.5% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-17 District 7 Projects for Years 2020-2025 of the 10-Year CHIP County Description Length (mi) Total Construction Cost Number Route 24 MN 4 Martin FROM RP 10.111 TO RP 26.350, MEDIUM MILL/OVERLAY 16.2 $7.82 M 25 MN 99 Nicollet FROM RP 0 - 12.326, MEDUM MILL/OVERLAY 12.3 $5.89 M 26 MN 22 Faribault FROM RP 10.767 TO RP 17.524, MEDIUM MILL/OVERLAY 6.8 $3.46 M 27 MN 5 Sibley FROM RP 14.731 - 17.521, MEDIUM MILL/OVERLAY 2.8 $1.34 M 28 MN 19 Scott, Le Sueur FROM RP 150.492 TO RP 151.780, URBAN RECONSTRUCTION, NEW PRAGUE (YEAR 3 OF 4) 1.4 $1.00 M 2023 29 US 71 Redwood REPLACE BRIDGE 5543 (RP 51.439) 0 $2.23 M 30 MN 22 Blue Earth REPLACE BRIDGE 8436 (RP 58.447) 0 $1.50 M 31 MN 19 Le Sueur REPLACE BRIDGES 8741 (RP 145.002), 8742 (RP 146.313), AND 8713 (RP 149.423) 0 $2.40 M 32 I 90 Nobles REPLACE BRIDGE 53802 (RP 26.626) 0 $3.00 M 33 MN 19 Le Sueur FROM RP 134.452 - 150.492, THICK OVERLAY 16.0 $9.16 M 34 MN 22 Blue Earth, Fairbault FROM RP 18.438 - 35.373, MEDIUM MILL/OVERLAY 16.9 $8.56 M 35 I 90 Faribault FROM RP 113.790 TO 117.910, EB & WB, MED MILL/OVERLAY 4.1 $4.50 M 36 MN 22 Blue Earth, Le Sueur FROM RP 56.427 TO RP 63.592, MEDIUM MILL/OVERLAY 6.6 $3.63 M 37 MN 4 Brown FROM RP 51.835 TO RP 57.184 (0.48 MI N 680TH AVE TO NW END OF BR 6749), MEDIUM MILL/OVERLAY 5.3 $3.00 M 38 MN 254 Faribault FROM RP 5.852 TO RP 10.648, MEDIUM MILL/OVERLAY 4.8 $1.78 M 39 US 169 Blue Earth FROM RP 51.703 TO RP 53.385, SB, AND FROM RP 51.914 TO RP 53.385 NB, MEDIUM MILL/OVERLAY 1.7 $1.53 M 40 MN 60 Blue Earth FROM RP 94.560 TO RP 97.720, WB, MEDIUM MILL/OVERLAY 3.2 $1.53 M 41 MN 19 Scott, Le Sueur FROM RP 150.492 TO RP 151.893, URBAN RECONSTRUCTION, NEW PRAGUE (YEAR 4 OF 4) 1.4 $1.00 M REPLACE BRIDGES 2601 (RP 24.508) AND 2461 (RP 25.751) 0 $1.00 M REPLACE BRIDGE 9774 (RP 5.077) 0 $3.00 M REPLACE BRIDGE 52001 (RP 69.474) AND 52002 (RP 69.474) 0 $4.00 M 2024 42 43 44 PAGE MN 109 Faribault I 90 Rock US 169 Nicollet 45 I 90 Rock FROM RP 3.907 TO RP 13.151, WB, MAJOR CPR 9.2 $9.49 M 46 MN 60 Blue Earth, Le Sueur FROM RP 116.480 TO RP 132.335 MEDIUM MILL/OVERLAY 15.8 $8.80 M 47 US 75 Rock FROM RP 0.00 TO RP 9.606, MEDIUM MILL/OVERLAY 9.6 $5.98 M 48 MN 15 Martin FROM RP 0.00 TO RP 9.471, MEDIUM MILL/OVERLAY 9.5 $5.61 M 49 I 90 Nobles FROM RP 25.965 TO RP 34.709, WB, MEDIUM MILL/OVERLAY 8.7 $5.00 M 7-18 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN Pavement Condition Bridge Condition Roadside Infrastructure Condition Traveler Safety IRC Mobility Bicycle Infrastructure Accessible Pedestrian Infrastructure Regional + Community Investment Priorities Project Support 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 72.1% 0% 11.5% 3.2% 0.0% 2.3% 10.9% 0.0% 0.0% 2023 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 12.4% 5.5% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 2.3% 0.9% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 87.0% 13% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.0% 13% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 72.1% 0% 11.5% 3.2% 0.0% 2.3% 10.9% 0.0% 0.0% 2024 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 0.0% 93% 0.0% 0.0% 0.0% 3.5% 3.6% 0.0% 0.0% 82.1% 0% 12.4% 5.5% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 82.1% 0% 12.4% 5.5% 0.0% 0.0% 0.0% 0.0% 0.0% DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-19 Number Route County Description Length (mi) Total Construction Cost 50 US 169 Nicollet, Blue FROM RP 53.385 TO RP 56.350 SB, AND RP 53.385 TO RP 56.229 NB, Earth MEDIUM MILL/OVERLAY 3.0 $3.24 M 51 MN 15 Watonwan FROM RP 38.952 TO RP 42.578 MEDIUM MILL/OVERLAY 3.8 $2.58 M 52 MN 15 Watonwan FROM RP 32.392 TO RP 36.547 SB, MEDIUM MILL/OVERLAY 4.6 $2.25 M 53 US 75 Rock FROM RP 10.675 TO RP 12.082, NB, MEDIUM MILL/OVERLAY 1.4 $1.31 M 2025 54 PAGE US 169 Blue Earth REHAB BRIDGE 07042 (VETS BRIDGE) (RP 104.370) 0 $5.00 M Faribault REHAB BRIDGES 22814 (RP 12.151), 24809 (RP 143.806), AND 22819 (RP 141.741) 0 $2.00 M MN 91 Nobles REPLACE MULTIPLE BRIDGES ON MN91 - BRIDGE 1503 (RP 018.646), 5654 (RP 009.705), 5634 (RP 010.965), 8644 (RP 003.054), 6366 (RP 001.860), AND 8642 (RP 007.830) 0 $3.00 M 57 MN 19 Sibley FROM RP 97.255 TO RP 109.418, MAJOR CPR 12.1 $10.41 M 58 I 90 Martin FROM RP 87.814 TO RP 102.168, EB, THICK MILL/OVERLAY 14.4 $8.70 M 59 US 14 Blue Earth FROM RP 134.392 TO RP 140.775 EB, MAJOR CPR 6.4 $5.67 M 60 MN 13 Le Sueur, Waseca FROM RP 33.795 TO RP 42.292 MEDIUM MILL/OVERLAY 8.5 $4.50 M 61 US 59 Nobles FROM RP 11.018 TO RP 12.164, N JCT TH60 TO I90, URBAN RECONSTRUCT 1.1 $4.00 M 62 MN 4 Brown FROM RP 63.430 O RP 66.048 (.4 MI N JCT US-14 TO N OF TH-68), MEDIUM MILL/OVERLAY 2.6 $2.12 M 63 MN 60 Watonwan FROM RP 61.911 TO RP 64.032, EB, MEDIUM MILL/OVERLAY 2.2 $1.33 M 64 MN 13 Le Sueur FROM RP 58.688 TO RP 60.109 MAJOR CPR 1.4 $1.21 M 55 I 90 56 7-20 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN Pavement Condition Bridge Condition Roadside Infrastructure Condition Traveler Safety IRC Mobility Bicycle Infrastructure Accessible Pedestrian Infrastructure Regional + Community Investment Priorities Project Support 87.0% 13% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.0% 13% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.0% 13% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 0% 11.5% 3.2% 0.0% 1.5% 1.7% 0.0% 0.0% 2025 0% 93% 0% 0% 0% 4% 4% 0% 0% 0% 93% 0% 0% 0% 4% 4% 0% 0% 0% 93% 0% 0% 0% 4% 4% 0% 0% 82% 0% 12% 3% 0% 2% 2% 0% 0% 82% 0% 12% 6% 0% 0% 0% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 82% 0% 12% 3% 0% 2% 2% 0% 0% 72% 0% 12% 3% 0% 2% 11% 0% 0% 82% 0% 12% 3% 0% 2% 2% 0% 0% 82% 0% 12% 3% 0% 2% 1% 0% 0% 82% 0% 12% 3% 0% 2% 2% 0% 0% DISTRICT 7 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN (2016-2025) PAGE 7-21
© Copyright 2026 Paperzz