8567 Wilshire - Closed LUST Site with Groundwater Contamination 8501 Wilshire Former Gas Station 8483 Wilshire Former Gas Station 8383 Wilshire - Former LUST Site / Hazardous Waste Spill Groundwater Contamination 8441 Wilshire - Auto Sales, Repairs, Gasolene EXPLANATION 1 1 2 ( P) 7916 G-131 WILSHIRE A M 6 7902 MA- 31 3 E-12 M 026 A-79 6 7902 MA2 3 7916 MA- 3 A-78 2 04 2 G-13 -8 M-17 G NO. 10 DOUBLE CROSSOVER 2(SC-11W) 0B -68291-B (M 3 A 1 1 2 A E-12 -121B E-12 G -129 1 G E 0 1 P- E-12 2 / LA CIENEGA STATION e) Wav 2 NV4 2 1 E- Investigations for Adv. PE Phase: e) WavA-69086 S ( M -303 4 C 5 86-B 86 -690M A-690 A M S-10 O 7 101 OB181 2 B-10 A-79 ) W A(M 1 2 1 E9 NV-2 -B 8291 A-6 291 A-68 2 C-30e) av ) (MW (S-W A 0 12 0B E- Geotechnical CPT with Soil Gas Probes G-312 Geotechnical Rotary-Wash / Hollow-Stem Auger Boring 8 0 NV-3 G-131 Geotechnical Rotary-Wash Boring C-112 Geotechnical CPT S-107 Geotechnical Sonic Core E-122 Environmental Boring [Direct Push] 140 120 ? Pump Test CPT [Geotechnical + Gas - BAT] Qalo 567+80 Transverse Profile ? (6-10-11) Shallowest groundwater depth measured in an observation well and date of measurement (4-27-11) Shallowest overnight groundwater depth measured in a boring (5-18-11) Shallowest groundwater depth measured during drilling of a boring ? ? Depth to recorded shallowest groundwater table AMEC Environmental Exploration Geologic contact line AMEC Geotechnical Exploration Historically recorded highest groundwater level (CDMG, 1998) 240 ELEVATION 220 Prior Investigations: M 90192 1 G-128(P) E-120 G-129 E-120B C-302 E-120A P-48 200 CWDD (CEG) 21 SV-6, RC-17 180 = Geotechnical = Gas Well or CPT with Gas Reading Geologic Units: AMEC Geotechnical Exploration AMEC Environmental Exploration (1992) CWDD Converse Ward Davis Dixon (1981) A-68291B-11 A-68291-3 A-79181-3 160 (MW) ARTIFICIAL FILL af Qal EnviroRail (1994, 1996) Symbol Labels: A-68291-B-9 GALE DR. OB-101 E-121A G-130B P-101 OB-102 571+45 Transverse Profile S-107 C-112 E-121 E-121B HAMILTON DR. E-122A G-8 Noise and Vibration Point of Interest NV-24 (undocumented) YOUNGER ALLUVIUM (Holocene) - predominantly sand, silt and clay OLDER ALLUVIUM Qalo - varying layers of Silty Sand, Clayey/Silty Clay, and Silt with occasional gravel Qsp SAN PEDRO FORMATION (mid Pleistocene) - predominantly greenish gray and bluish gray fine-grained Sands, medium to coarse Sands and some Silt Layers Groundwater monitoring (observation) well 140 (P) af Qal ? ? 5/18/11 574+05 Transverse Profile af YOUNGER ALLUVIUM (Qal) M A-69086-5 M-17 G-8 MA-79162-2 160 P-101 M-16 M A-69086B-1 180 Gas Monitoring Well 260 A-78304-4 M A-69086-4 LA CIENEGA BLVD. 200 M-115 Investigations for Prior ACE Phase : 280 C-303 E-122 G-131 G-132 E-123 ELEVATION FileName=> G:\4953_Geotech\2011\111423 Westside - Post APE\CAD\DWG\Report_13.11.05\4953-11-1423_Tail-Track_Plate-1.dwg [Plate-1] UserName: vo.nguyen Nov 14, 2013 @ 5:56pm Begin 575+05 End 583+22 TAIL TRACK 220 NO. 10 DOUBLE CROSSOVER Dual Geotechnical Boring/ Gas Monitoring Well CB-104 300 240 Cross passage (profile view) 320 300 260 Site view showing center of tracks (blue), tunnel outlines (magenta dash) with perpendicular lines for of cross passage Investigations for PE Phase: (P) PLAN 280 Profile view of station (red) with tunnel outline (black) and track (blue) based on plans dated October, 2013 Gas Monitoring Well G-126/M-116 320 Site view of station. Alignment based on plans dated October, 2013 Environmental Exploration with Soil Gas Probes G-313/M-301 G-12 E-12 C-303 E-122A 0 E-12 Symbols Legend: ? 4/27/11 Qalo 4/22/11 Boring / CPT with shear wave velocity measurements 5/24/11 ? 4/14/11 (S-Wave) 120 Boring with pressuremeter testing 5/18/11 ? 100 Changes in the geologic contacts, groundwater depth, explanations field or laboratory data and due to additional data obtained from borings drilled in 2013 100 80 80 TD=65' TD=65' TD=65' TD=65' TD=70.5' TD=70' TD=70' 60 TD=76' TD=76' TD=81.5' TD=85' TD=91' TD=75' No. 10 DOUBLE CROSSOVER 60 TD=90' 40 40 WILSHIRE / LA CIENEGA STATION SAN PEDRO FM (Qsp) TD=111.5' TD=111' TD=120' 20 TD=121.5' TD=127' TD=115' TD=121' TD=122' 20 TD=120' 0 0 584+00 584+00 583+00 582+00 581+00 580+00 579+00 578+00 577+00 576+00 575+00 574+00 573+00 572+00 571+00 570+00 569+00 568+00 567+00 566+00 565+00 564+00 517+00 563+00 Reference: Proposed Tunnel Alignment and Station Plan and Profile dated October, 2013 PROFILE: DESIGNED BY WL DRAWN BY VMN CHECKED BY WL / HP IN CHARGE MBH / PM H=200', V=40' VERTICAL EXAGGERATION = 5:1 CONTRACT NO LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY WESTSIDE SUBWAY EXTENSION ADVANCED PRELIMINARY ENGINEERING EXPLORATION PLAN AND PROFILE DRAWING NO PLATE 1 SCALE AS NOTED TAIL TRACK SHEET NO DATE REV DATE BY APP DESCRIPTION 11/5/2013 STATION 575+05 to 583+22 REV
© Copyright 2026 Paperzz