Case e Stud dy Leaachate drain, SSt Oswalds Parkk Road Project Descrip ption: With Churngolld as Principle Contractor, this projecct consisted o of the e repair of an existing leaachate drain, preparation and laying of a gas collecttor drain and d laying of a new leachate drain at up p to 6 m depths.. Th he site of the new drainagge is in an arrea of an old cattle maarket and hisstorical soil ccontaminatio on was deteccted the erefore careeful consideraation to treaating the excaavated maaterial was m made. Ke ey Works carrried out: Grroundworks:: Excavation of existing ground for th he laying of the e new leachaate drain, as depths bein ng excavated were at some points up p to 6 m, spe ecial consideeration to tem mporary wo orks had to b be taken into o account. Projject Overvie ew Clien nt: Gran nchester Properties Ltd Locaation: Glou ucester Sector: Grou undworks Project value: £400 0,000 Engineer/Architect: Rodggers Leask Lttd Project Period: Septtember 2010 0 – Decembeer 2010 Maanholes and Pipes were laid to the sp pecification w with “N Nicoflex” mem mbrane used d to provide a wrap to th he pipe and surrounding m material. Excavated matterial was treeated by Chrrungold’s rem mediation teaam to reducee the amoun nt of spoil neeeded to be ttaken away fro om site, as trreated materrial could be used as backfill to new leaachate pipe. www.churngold.com tel: 0117 900 7100
© Copyright 2026 Paperzz