SEATTLE STREETCAR FIRST HILL LINE November 2013 Jackson Corridor Report Pioneer Square Chinatown /ID Little Saigon Grading trackway on Jackson in Little Saigon Frequently Asked Questions About the First Hill Streetcar What will the hours of operation be, and how frequently will streetcars arrive? Hours of operation: Monday-Saturday 5 a.m. to 1 a.m. Sundays & Holidays 7 a.m. to 7 p.m. The streetcar will run at 10-minute intervals during peak hours (Monday to Friday 6-9 a.m. and 3-6 p.m.) and every 15 minutes at other times. When did construction begin, when will it end, and when will service begin? The construction of the First Hill Streetcar started in April of 2012. Test trains are scheduled to begin running in spring 2014 to prepare for passenger service beginning late summer or early fall 2014. Will I be able to use my ORCA card on the streetcar? Yes, the ORCA card will be the primary payment system. How much will it cost to ride, and how will I purchase a ticket? The fare will be established by the Sound Transit Board of Directors and is anticipated to be similar to Link Light Rail and Metro peak hour fares. Riders without ORCA cards will be able to purchase single ride tickets at a fare box machine located on the station platform. What is the total distance of the First Hill Streetcar route? 2.5 miles end to end from Jackson and Occidental to Broadway and Denny. What transportation systems will the First Hill Streetcar connect to? Riders will be able to connect to Amtrak’s intercity passenger rail service, Sound Transit’s Link light rail and Sounder regional train service, regional and local bus lines, local bike networks, and ferries and water taxis. www.seattlestreetcar.org Jackson Corridor Report — NOV 2013 Planned Construction for November – What to Expect PIONEER SQUARE 1st to 5th CHINATOWN/ID 5th to 8th Concrete saw cutting for track construction Construct streetcar track between 3rd Ave and 5th Ave Seattle City Light to install street light between 3rd Ave and 2nd Ave Extension Restore sidewalk between 3rd Ave and 2nd Ave Extension Install tactile pavers on the west end of the Occidental platform Install overhead electrical wiring Install permanent signage and lane striping Install train signals Construct station platform at 7th Install streetcar track between 8th and 10th Install overhead electrical wiring Install traffic and train signals Restore sidewalks and pedestrian ramps Traffic Advisories: Nov 8 – 24: No turns from westbound Jackson to southbound 8th Ave during track construction through intersection Dec 7: On Jackson between 3rd and Rainier there will be lane shifts and construction in intersections for overhead electrical work Traffic Advisories: BROADWAY Traffic Advisories: Nov 2-3: Partial closure of 12th Ave and Jackson intersection. East and west traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 12th across Jackson and left turns will not be permitted. Dec 7: On Jackson between 3rd and Rainier there will be lane shifts and construction in intersections for overhead electrical work Dec 7 - 23: Partial closure of 10th and Jackson intersection. East and west traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 10th across Jackson and left turns will not be permitted. 12 TH AVE S • Continue construction of streetcar track between 8th and Rainier • Concrete saw cutting for track construction • Install traffic signals • Install overhead electrical wiring • Restore sidewalks between 12th and 14th • Restore roadway in center turn lane between 12th and 14th • Construct station platform at 13th 10TH AVE S LITTLE SAIGON 8th to 14th E. YESLER WAY 8th Ave S 4TH AVE S 99 7TH AVE S Union Station King St. Station 5 MAYNARD AVE S S. JACKSON ST 6TH AVE S 5TH AVE S 2ND AVE S Streetcar Route OCCIDENTAL AVE S 1ST AVE S Streetcar Stops Nov 15-17: Partial closure of 2nd Ave Extension and Jackson intersection for track excavation and construction Nov 23-24: Lane restrictions at 2nd Ave Extension for overhead electrical work Dec 7: On Jackson between 3rd and Rainier there will be lane shifts and construction in intersections for overhead electrical work 14th Ave S Note : The Sounders’ playoff schedule may impact the weekend schedule in Pioneer Square Nov 2: Partial closure of 2nd Ave Extension and Jackson intersection for track excavation and construction Nov 8-10: Partial closure of 2nd Ave Extension and Jackson intersection for track excavation and construction Maintenance Facility S. DEARBORN ST 8TH AVENUE Install overhead electrical wiring Traffic Advisory: Nov 8 – 24: No turns from westbound Jackson to southbound 8th Ave during track construction through intersection Keep Informed Subscribe to the project’s Weekly Project Update to keep up to date on construction in your area. Send your email address to [email protected] or sign up on the project website at www.seattlestreetcar.org. More Information: Project Hotline: (206) 257-2121 Interpretation Service: 855-657-5580 Web: www.seattlestreetcar.org Email: [email protected] www.facebook.com/SeattleStreetcar www.twitter.com/TheStreetcar Funding provided by
© Copyright 2026 Paperzz