Jackson Corridor Report

SEATTLE STREETCAR FIRST HILL LINE
November 2013
Jackson Corridor Report
Pioneer Square
Chinatown /ID
Little Saigon
Grading trackway on Jackson in Little Saigon
Frequently Asked Questions About the First Hill Streetcar
What will the hours of operation be,
and how frequently will streetcars arrive?
Hours of operation:
Monday-Saturday
5 a.m. to 1 a.m.
Sundays & Holidays 7 a.m. to 7 p.m.
The streetcar will run at 10-minute intervals during peak hours
(Monday to Friday 6-9 a.m. and 3-6 p.m.) and every 15 minutes at
other times.
When did construction begin, when will it end, and
when will service begin?
The construction of the First Hill Streetcar started in April of 2012.
Test trains are scheduled to begin running in spring 2014 to prepare
for passenger service beginning late summer or early fall 2014.
Will I be able to use my ORCA card on the streetcar?
Yes, the ORCA card will be the primary payment system.
How much will it cost to ride, and how will I
purchase a ticket?
The fare will be established by the Sound Transit Board of Directors
and is anticipated to be similar to Link Light Rail and Metro peak
hour fares. Riders without ORCA cards will be able to purchase
single ride tickets at a fare box machine located on the station
platform.
What is the total distance of the First Hill
Streetcar route?
2.5 miles end to end from Jackson and Occidental to Broadway
and Denny.
What transportation systems will the First Hill
Streetcar connect to?
Riders will be able to connect to Amtrak’s intercity passenger rail
service, Sound Transit’s Link light rail and Sounder regional train
service, regional and local bus lines, local bike networks, and
ferries and water taxis.
www.seattlestreetcar.org
Jackson Corridor Report — NOV 2013
Planned Construction for November – What to Expect
PIONEER SQUARE 1st to 5th
CHINATOWN/ID
5th to 8th
Concrete saw cutting for track construction
Construct streetcar track between 3rd Ave and 5th Ave
Seattle City Light to install street light between 3rd
Ave and 2nd Ave Extension
Restore sidewalk between 3rd Ave and 2nd Ave
Extension
Install tactile pavers on the west end of the Occidental
platform
Install overhead electrical wiring
Install permanent signage and lane striping
Install train signals
Construct station platform at 7th
Install streetcar track between 8th
and 10th
Install overhead electrical wiring
Install traffic and train signals
Restore sidewalks and pedestrian ramps
Traffic Advisories:
Nov 8 – 24: No turns from westbound
Jackson to southbound 8th Ave during track
construction through intersection
Dec 7: On Jackson between 3rd and Rainier
there will be lane shifts and construction in
intersections for overhead electrical work
Traffic Advisories:
BROADWAY
Traffic Advisories:
Nov 2-3: Partial closure of 12th Ave and Jackson intersection. East and west
traffic on Jackson and right turns at the intersection will be permitted.
Through traffic on 12th across Jackson and left turns will not be permitted.
Dec 7: On Jackson between 3rd and Rainier there will be lane shifts and
construction in intersections for overhead electrical work
Dec 7 - 23: Partial closure of 10th and Jackson intersection. East and west
traffic on Jackson and right turns at the intersection will be permitted.
Through traffic on 10th across Jackson and left turns will not be permitted.
12 TH AVE S
• Continue construction of streetcar
track between 8th and Rainier
• Concrete saw cutting for track construction
• Install traffic signals
• Install overhead electrical wiring
• Restore sidewalks between 12th and 14th
• Restore roadway in center turn lane between 12th and 14th
• Construct station platform at 13th
10TH AVE S
LITTLE SAIGON 8th to 14th
E. YESLER WAY
8th Ave S
4TH AVE S
99
7TH AVE S
Union
Station
King St.
Station
5
MAYNARD AVE S
S. JACKSON ST
6TH AVE S
5TH AVE S
2ND AVE S
Streetcar Route
OCCIDENTAL AVE S
1ST AVE S
Streetcar Stops
Nov 15-17: Partial closure of 2nd Ave
Extension and Jackson intersection for
track excavation and construction
Nov 23-24: Lane restrictions at 2nd Ave
Extension for overhead electrical work
Dec 7: On Jackson between 3rd and
Rainier there will be lane shifts and
construction in intersections for
overhead electrical work
14th Ave S
Note : The Sounders’ playoff schedule
may impact the weekend schedule in
Pioneer Square
Nov 2: Partial closure of 2nd Ave
Extension and Jackson intersection for
track excavation and construction
Nov 8-10: Partial closure of 2nd Ave
Extension and Jackson intersection for
track excavation and construction
Maintenance
Facility
S. DEARBORN ST
8TH AVENUE
Install overhead
electrical wiring
Traffic Advisory:
Nov 8 – 24: No turns from westbound Jackson to southbound
8th Ave during track construction through intersection
Keep Informed
Subscribe to the project’s Weekly Project Update to keep up
to date on construction in your area. Send your email
address to [email protected] or sign up on the
project website at www.seattlestreetcar.org.
More Information:
Project Hotline: (206) 257-2121
Interpretation Service:
855-657-5580
Web: www.seattlestreetcar.org
Email: [email protected]
www.facebook.com/SeattleStreetcar
www.twitter.com/TheStreetcar
Funding provided by