s TAT Duck Call
1
Barr e l l Instr uctio n s I
Echo Inserts
Barrel {Tone Chamber) Mandrel Set Up
� Brass j"bing -----Knurled Nu\
Morse TapE!f
_.
I
I
Washers
Wash er
'
Washe r
5/8� Rubber Expa nsion Bushings
Materials:
Materials:
Mandrel Set Up:
Mandrel Setup (Barrel):
Assembly:
Assembly:
1)1)lLoad 518'
e
1)Insert
O mouth piece insert
ng-ri&into
in barrel and start
5/8” OD rubbere expansion
1) Echo Call Kd
i u&edthe
ngs
e& n
e& & th e g
n& ert 'M'ien
bushings,
washers
and
brass
tubes
Calling
5/
1.5x 4" Blank
e
doin9bushings,
PTIONAL- Ifthe 0d to op en up
washers
and brass
tubes
depicted above.
1as
Load
8”above.
OD asrubber
expansion
e ho
e einoth
e barrel
with
rov
n th
e STAT
drilled with 5/8" Bit 2)
2)ePlace
barrel blank
on
mandrel
and
If depicted
popre-drilled
&&ib e comers
of
b
a
n k'& &hwtd
i &0me &an
l blank nut
l bushings.barrel
2)
Place
over
e thi&
l youay
m
nee
bcenter
e re
m
overubber
dpre-drilled
U&ing a ba nTighten
d &awknurled
or &imon
ar
y
ciilli b t.
i
l
htl
ar
r
or
a
until blank
willin
notturnin
slide on.rubber bushings. Extra
li l
too
mandrel
center over
rubber
bu&h
l to emay
id and
be requiredgand some
mandrels
i
Bushings
5/8" wood
Hole bushings
l) srr Pre<tll!ed
2)
dopjct
ptadriled
n nut
mad.until
n drel
3)
Pinlace
vary
length.
bushings.
Tightenbarrel
knurled
yo
- Duck
Bla nkCall Barrel
3) Makecsure
live center
is properly
placed
s.
and
ent eyour
r
over
rubber
bu
sh ngin
i not
blank
not slide
on
rubber
the
end
ofwill
the mandrel.
Ti
ht
e
n
knuried
nut
u
n
til
b
a
n
k
will
Turning
g
l may be
barrel
shape.
bushings.
dTurn
e on
rubbtoExtra
edesired
r bu&hbushings
bu&h n &
ngs. Extra
sl4)
4) Small set turn,ng
i
5)i If a lanyard is desired be
sure to cut a 3/16”i g
may
b
e
ne
Cfi&ary,
&Orne
7
m
m
mandre
required
and
some
mandrels
varyl&
deep cove to hold the lanyard in place.
1001$
7mm
Mandrel
vary
n ength.
6)
l end of the barrel you will need to
ieach
inOnlength.
round
oversthe
openings.
Onecend
for comfort
and
4)
ure
your
ve
e n t er
& proper
SJ7mm manct'el
imouth
3)pMake
Make
sure
your
the
other
end
inl iinserting
then
ty
aced
nto
thassist
e end
oflive
th e center
ma
dreis
.
Sandpaper
& Finish
l
l
e
i
piece
inset.
VJl th8")(�
end of the h
5)properly
Duckcallplaced
design&incathe
n var y us t e& t e
Mor$e taper
j
pmandrel.
eop e who tumthem. We ha,,- e includ
l
e4)
d drs'Mf\9
of som
of the more
popular
Turn barrel
toe desired
shape.
6)SMdll! rots. 4pk
desig n&..
5)
If
a
lanyard
is
desired
be
sure
to
1'120
6)If a lanyard i&b:I be used rememb er to
cut
a
3/16”
deep
cove
to
hold
the
e
ximately
wt a & mall cove g
7) HUT ppptw combo
lanyard
place.
311
6' deepinfor
the
n
109, Crystal Co411:l W
6) On each end
the
barrel
youwil
oov
) appr
( rof
l you
104, or ll n1Sh of
need
t
cordover
to rm
will need
to round
the s: Tne
mouth o rou
d for
nd comfort
ovof
er th
open
d thing stopper
yourehoiee
thefor
barr
openings.
end
end
fo enasy One
in&ertion
ofen
thcomfort
$loepp rand
the other
r e end to assist in
e inserting
e
the mouth piece inset.
f J.14
© Copyright 2026 Paperzz