ProSheet Plus 3 Sell Sheet

Quick, Easy, Reliable.
Underlayment
• Creates an inexpensive floating floor for Luxury Vinyl Tile
and Plank (LVT/LVP) & FiberFloor ®.
• Covers poor sub-floor conditions and installs directly over
OSB saving time and money for builders/remodelers.
• Directly glue LVT/LVP to the underlayment allowing for
subfloor protection and quick, future replacement.
ProSheet™ Plus 3
• Use QBond-One™ releasable application with
ProSheet Plus 3 so that floors can be easily repaired.
• Great for Single and Multifamily Dwellings.
Ordering Information
Item 97501
SAP 220095001
Historical 113010697501
UPC 033799332755
Width 6'
Length 132'
Diameter 8.8"
Coverage per roll 792 sq. ft./88 sq. yd.
Weight per roll 139 lbs.
Tarkett® Underlayment – ProSheet™ Plus 3 Fact Sheet
PROVIDES A FLOATING FLOOR SOLUTION:
• Residential LVT Direct Glue-Down & LVT Click (Free Span Technology)
• Residential Resilient Sheet Flooring (Fiberglass Reinforced)
ProSheet Plus 3 eliminates the need for underlayment panels over wood subfloors, covers floor imperfections and provides a floating floor system
for the products listed above. ProSheet Plus 3 (PS+3) underlayment is installed underneath LVT/LVP glue down, LVT/LVP click, LVT/LVP self-adhesive
or Loose Laid Resilient Sheet Flooring. PS+3 will minimize the effects of subfloor conditions such as deflection, staining and telegraphing of
subfloor texturing. PS+3 should be stored in a clean, dry environment, protected from elements. The ideal temperature is between 65°F and 85°F
(18°C - 29°C) 48 hours prior, during and after the installation.
SUBSTRATES THAT CAN BE COVERED WITH PROSHEET PLUS 3
Gypsum Underlayments
Residual Adhesives
Painted Subfloors
Concrete (all grade levels)
Stripwood Hardwood Floors
Oriented Strand Board
Flake Board
Particleboard
Existing Resilient Vinyl Floors
Existing Ceramic Tile
WOOD SUBFLOOR REQUIREMENTS
• Joist or truss systems spacing 16" on center, maximum of 19.2".
• Subfloor panels must be dry, sturdy, smooth and dimensionally stable with no voids.
• 3/4" minimum thickness tongue and groove plywood or oriented strand board (OSB).
• Exterior grade or classified as Exposure I.
• All suspended wood subfloors must have at least 18" of well-ventilated air space clearance above the ground. The ground under the crawl space
shall be covered with 10mil or thicker polyethylene sheeting to reduce moisture vapor transmission.
• Subfloor panels must be securely fastened to the joists. If glue-nail procedures are required, use a solvent-free construction adhesive.
• Smooth and level any uneven subfloor panel joints.
PREPARATION FOR INSTALLATION OF PROSHEET PLUS 3
• Prepared wood substrates according to ASTM F1482 and concrete subfloors according to ASTM F710
• Measure concrete subfloors according to ASTM F1869 and ASTM F2170, do not install PS+3 if the values are greater than 3 lbs/1000 ft 2/24hrs per
ASTM F1869 or 85% per ASTM F2170.
• PS+3 has a minimal contribution to sound dampening of a Delta IIC of 7.
• PS+3 is installed as a glueless system and do not adhere or fasten to the substrate.
• Measure room to determine the size of the each piece of the PS+3 underlayment.
• Install PS+3 underlayment perpendicular to the finished flooring.
• Heavy furniture and appliances may produce indentation with the flooring system over extended periods of time.
GLUE OPTIONS
• Vinyl side up; use QBond-One™, 3/8" nap paint roller for releasable application or 1/32" x 1/16" x 1/32" “U” notch trowel, dry set application.
• Vinyl side down; use QBond-One, 1/16" x 1/16" x 1/16" square notch trowel.
WARRANTY
• PS+3 is guaranteed for one year and see installation instructions for details.
USA: 1-877-TARKET T (1-877-827-5388). Canada: 1-877-436-6267.
tarkettna.com
©2017 Tarkett, Inc. 03/2017
INSTALLATION INSTRUCTIONS
• Sweep and vacuum substrate to remove all dirt and debris.
• Unroll and position PS+3, vinyl side up (preferred) or vinyl side down. Tarkett SureStart™ must be installed vinyl side up.
• Position sheet along starting wall. Leave a 1/4" space between the sheet and all verticals (walls, cabinets, pipes). Using a utility knife with a
sharp blade, trim the excess material along all verticals.
• If more than one piece is required, lightly butt the seam edges together and tape the length of the seam with clear packaging tape. Do not
distort or buckle seam area when applying tape. Offset seams from any subfloor joints approximately 12". If factory edges are damaged, overlap
edges and double-cut through both pieces.
• Refer to the manufacturers’ detailed flooring installation instructions.