I-85 Site at Hwy 86 Approximately seven tenths of a mile from I-85 on Hwy 86 this features I-85 Sitesite at Hwy 86 approximately 2800 feet of frontage on Hwy 86. tenths of a mile from I-85 on Hwy Approximately seven Piedmont, 29673approximately 2800 feet of 86 this site SC features frontage on Hwy 86. Piedmont, SC 29673 County Anderson Municipality Unincorporated Zoning No Zoning Present Tax Map ID 240-00-01-018-000 / 240-00-01-005-000 / 240-00-01-020-000 Stand Alone Site Park Status Location Landuse Approximately seven tenths of a mile from I-85 on Hwy 86 this site features approximately 2800 feet of frontage on Hwy 86. Agricultural (N) Light Industrial (S) Commercial (E) Transportation (W) Pricing Pricing For Sale Sale Price $35,000 Details Utilities Water Provider Greenville Water System Nearest Water Line Size 8 inches Distance to Nearest Water Line On-Site Wastewater Provider Anderson County Sewer Nearest Sewer Line Size 8'' (Gravity) Total Site Acreage 237.00 Distance to Nearest Sewer Line On-Site Developable Acreage Undetermined Natural Gas Provider Piedmont Natural Gas Additional Acreage Available Undetermined Nearest Gas Line Size 4'' (Distribution) Minimum Divisible Acreage 22.00 Distance to Nearest Gas Line On-Site Max Contiguous Developable Site 237.00 Alternative Gases None Available Electric Provider Duke Energy Maximum Building Size 1,300,000.00 Telecomm Provider AT&T Site Improvements Partially Cleared Transportation Elevation Range 926' to 926' Road Serving Building SC Hwy 86 (2 Lanes) Primary Soil Type Clay Loam Rail Access No SC Certification Program Palmetto Sites Runway Access No Barge Access No Nearest Interstate I-85 (1 Mile) Nearest Port Charleston (214 Miles) Charlotte Douglas International Airport 5501 Josh Birmingham Parkway, Charlotte, North Carolina (107 Miles) Greenville-Spartanburg International (24 Miles) CSX Charlotte (106 Miles) Due Diligence Cultural Resource Identification Survey Not Completed Boundary Survey Completed Protected Species Assessment Not Completed Nearest International Airport Preliminary Geotechnical Exploration Not Completed Nearest Commecial Airport Phase 1 EPA Site Assessment Completed Topographical Survey Not Completed Wetlands Delineation Completed Nearest Intermodal Facility
© Copyright 2026 Paperzz