E2 V\ ac s (Des) Sub Dte Engineer-in-Chief's Branch Integrated HQ of MoD (Army) Kashmir House, Rajaji Marg, New Delhi-110 011 b 93348/MISC/Consult/ 52-6 /E2 Des-1 >Feb 2015 1st DG (OF & DRDO) `B' PERFORMANCE REPORT !WORK LOAD RETURN IN R/O CONSULTANTS WORKING IN MES Enlistment of Engineering Consultants for MES wks by this HQ /Comd CE/Zonal CE from time 1. to time. 2. In order to evaluate the performance / capability of working consultants in MES, it is decided to obtain a quarterly report from all CEs Zone / CEs Comd as per format given below for consultancy wks carried out in their AOR:SI No Name and address of Consultant Category if empanelled in MES Enlisting Authority Total Value of Work awarded / work in hand (with details of each Job/CA) Approx value of wk completed (detailsof each Job/CA) (a) (b) (c) (d) (e) (f) Remarks of Comd CE/CE Zone whether considered capable of handling more work load (g) Remarks (h) 3. Above performance/work load return is requested for each quarter ending on 31 Mar, 30 Jun, 30 Sep & 31 Dec of each year to reach this office by 25th of succeeding month duly compiled and with recommendations of CE Comd/ADG. 4. First report in consolidated form is requested along with recommendations of Comd CE/ADG to reach this office by 31 Mar 2015. 5. This has the approval of DGW. 6. Please note this new report in reports/returns. 7. PI accord priority. Col Rajat Baijal Copy to: DG (MAP) Digitally signed by Col Rajat Baijal DN: c=IN, st=Kashmir, o=E-IN-C' Branch Army MOD Room No - 160 Automation Cell EINC Branc, ou=nonnic-mail-admin, cn=Col Rajat Baijal, [email protected] Date: 2017.03.23 09:39:16 +05'30' (Ajit Krishana Singh, IDSE) SE Dir (Design) For E-in-C Performance of consultants working with DG MAP may also be intimated to this office please. TS to E-in-C TS to DGW 5 S30 Military Engineering Services E2 Wks (Des) Sub Dte Engineer-in-Chiefs Branch Integrated HQ of MoD (Army) Kashmir House, Rajaji Marg, New Delhi-110 011 ' 23019924 No 93348/MISC/Consult/0.2 /E2 Des-1 e l Jun 2016 E-in-C's List 'A' & 'B' ISSUE OF TENDERS/QUOTATIONS TO APPROVED CONSULTANTS 1. Ref this HQ letter No 90137/D&C/2271/E2 Des-3 dt 09 Aug 2011. It has been observed from the Performance Reports being fwd by various CEs Comd/Zones 2. that as on date more than 50% consultancy wks in MES are being done by the unenlisted consultants. This is clearly defeating the whole purpose of enlistment of consultants by various HQs. It is once again reiterated that the following procedure will be strictly adopted by all MES 3. fmns, in case of issue of tenders/quotations for consultancy wks:Bids may be invited from the enlisted consultants in order to cut down the time reqd (a) for processing the bids. Whenever bids from unenlisted consultants are invited, CE Zone will incl directions (b) in the NIT that the unenlisted bidders will have to get himself enlisted in appropriate Gp and Cat as per SOP for enlistment of Consultants issued by E-in-C's Branch (posted on website mes.gov.in) before submitting the bid or parallely with processing of the bid. A BOO will be ordered by the Accepting Offr to verify that the consultants meeting (c) the PQC are also meeting the Enlistment QRs as specified in the SOP. Bd proceedings incl verification of facilities will be completed and fwd to E-in-C's Br within two weeks of opening of Tech Bid by Accepting Offr. Accepting Offr will open the second cover (price bid) from unenlisted consultants only (d) after enlistment of the bidder by the Enlisting Authority. 4. This has got the approval of DGW. 5. PI ack. l3k , pzI l g fsit, (Girish Joshi) Brig DDGW (Des) For E-in-C Com( to:TS to E-in-C, TS to DGW, DG MAP, E2W (Army), E2W (Air), E2W (Navy), E2W (PPC), E-6 (Arch), E-8 (Contract) Automation Cell Request upload this letter on MES website for info of environment pl. Des Sub Dte, Room No 176 Dte of Wks E-in-C Branch Integrated HQ of MoD (Army) Kashmir House, Rajaji Marg New Delhi — 110011 TO- 23019924 93348/Misc/Consult/ I 30 c /E2 Des-1 -1 Oct 2016 List 'A' ADG (OF & DRDO) List 'B' PERFORMANCE REPORT / WORK LOAD RETURN IN R/O CONSULTANTS WORKING IN MES 1.Refer this HQ letter No 93348/Misc/Consult/526/Des-1 dt 26 Feb 2015. 2.The following discrepancies have been observed in the format for the QPR being followed presently:(a) (b) (c) The progressive performance of the consultants can't be assessed. Reasons for negative remarks are not being spelt out clearly. Basis of positive remarks for banned consultants, cannot be established. 3.In view of the above, a fresh format for the QPR to be submitted by various CEs is encl as Appx to this letter. 4.It is requested that all CEs to follow the fresh format for forwarding the QPRs as per the schedule specified in the letter ref in para 1 above. her) Lt Col Offg Dir (Des) For E-in-C Fik ei Appx A (Ref HQ E-in-C Br letter No 93348/Misc/Consult/ f30,0 /E2 Des-1 dtq(i Oct 2016) PERFORMANCE REPORT I WORK LOAD RETURN IN RIO CONSULTANTS WORKING IN MES : QTE ENDING SEP 16 S No CA No & Name of work Name of Consultant EnlistedlUnenlisted (Enlisted by) Scope of consultancy Dt of commencement of wk Dt of completion as per CA Extended dt of completion (if extension granted) Progress (%) End of End of last qtr present qtr Recommendation of CE Reasons for not recommending (if not recommended)
© Copyright 2024 Paperzz