Mn/DOT ADA Transition Plan Minnesota Department of Transportation http://www.dot.state .mn.us/ada Page |2 This Page Left Intentionally Blank Page |3 Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, MN 55155 April 2, 2010 Dear Citizens of Minnesota, I am pleased to share with you the ADA Transition Plan for the Minnesota Department of Transportation, which I recently adopted. This plan is the result of extensive collaboration during the past two years among the Minnesota Department of Transportation and citizens, stakeholders, and partners throughout Minnesota. I want to thank everyone who took part in developing the draft plan. This plan establishes a base for accessibility to Minnesota’s transportation system and will be a guide to help ensure transportation is accessible to all users. As Minnesota’s transportation leader, Mn/DOT will uphold the vision and policies presented in this plan. The success of making our transportation system fully accessible depends on the coordinated efforts of all levels of government, the public, and the policies and strategies outlined in this plan. Mn/DOT will continue to look for opportunities to involve citizens, stakeholders and partners in the implementation of this plan, future updates to the plan, and in policy decisions affecting accessibility. Together, we can realize a shared vision of an accessible, safe, efficient, and sustainable transportation system. Sincerely, (Original signed) Thomas K. Sorel Commissioner An Equal Opportunity Employer July 21, 2010 Page |4 This Page Left Intentionally Blank Page |5 Mn/DOT ADA Transition Plan Minnesota Department of Transportation 4/2/2010 July 21, 2010 Page |6 This Page Left Intentionally Blank Page |7 Table of Contents Introduction ..................................................................................................................... 9 ADA and its Relationship to Other Laws ....................................................................... 10 Mn/DOT History ............................................................................................................ 11 Program Location and Staffing ...................................................................................... 13 Committee Structure .................................................................................................... 14 Mn/DOT’s ADA Accessibility Advisory Committee ........................................................ 14 Americans with Disabilities Act Advisory Committee (ADAAC) ..................................... 15 ADA Implementation Committee ................................................................................... 15 Communications ........................................................................................................... 16 Website Communications.............................................................................................. 16 Public Involvement ........................................................................................................ 17 Self Evaluation .............................................................................................................. 18 Fixed Work Sites........................................................................................................ 18 Rest Areas ................................................................................................................. 18 Accessible Pedestrian Signals (APS) ........................................................................ 19 Curb ramps and sidewalks ........................................................................................ 20 Greater Minnesota Transit ......................................................................................... 21 Pedestrian Bridges, and Underpass Inventory .......................................................... 21 Policies ...................................................................................................................... 22 Maintenance .................................................................................................................. 22 Correction Program ....................................................................................................... 23 Training ......................................................................................................................... 23 Appendix A: How to file a Grievance ............................................................................. 24 Appendix B: Program Contacts ..................................................................................... 26 Appendix C: Mn/DOT Work Sites .................................................................................. 27 Priority One Sites ................................................................................................... 27 Priority Two ............................................................................................................ 28 Appendix D: Rest Area Facility Condition Assessment ................................................. 29 Appendix E: Statewide Accessible Pedestrian Signal (APS) Prioritization Summary .... 41 District 1 ................................................................................................................. 41 District 2 ................................................................................................................. 44 District 3 ................................................................................................................. 46 District 4 ................................................................................................................. 51 Metro ...................................................................................................................... 53 District 6 ................................................................................................................. 69 District 7 ................................................................................................................. 72 District 8 ................................................................................................................. 74 Appendix F: Curb Ramp Inventory ................................................................................ 76 Appendix G: Pedestrian Overpass and Underpass Inventory ...................................... 81 Appendix H: Policies and Procedures under Review by Mn/DOT ................................. 86 Appendix I: Glossary of Terms ...................................................................................... 87 July 21, 2010 Page |8 This Page Left Intentionally Blank Page |9 Introduction Mn/DOT Vision This document is intended to serve as a guide to further the vision, mission and core values for the Minnesota Department of Transportation (Mn/DOT) by outlining key actions for making the transportation system in the State accessible. The Vision, Mission and Core Values for Mn/DOT are as follows: Vision Global leader in transportation, committed to upholding public needs and collaboration with internal and external partners to create a safe, efficient and sustainable transportation system for the future. Mission Provide the highest quality, dependable multi-modal transportation system through ingenuity, integrity, alliance and accountability. Core Values • Maintain safety as a priority • Enhance trust with transparency and accountability • Promote collaboration, research and innovation • Value diversity and cultural capital through inclusion and opportunity • Commit to employee well-being, development and success • Recognize that employees are integral to Mn/DOT’s success Transition Plan Need and Purpose The Americans with Disabilities Act (ADA), enacted on July 26, 1990, is a civil rights law prohibiting discrimination against individuals on the basis of disability. ADA consists of five titles outlining protections in the following areas: • Employment • State and local government services • Public accommodations • Telecommunications • Miscellaneous Provisions Title II of ADA pertains to the programs, activities and services public entities provide. As a provider of public transportation services and programs, Mn/DOT must comply with this section of the Act as it specifically applies to state public service agencies and state transportation agencies. Title II of ADA provides that, “…no qualified individual with a disability shall, by reason of such disability, be excluded from participation in or be denied the benefits of the services, programs, or activities of a public entity, or be subjected to discrimination by any such entity.” (42 USC. Sec. 12132; 28 CFR. Sec. 35.130) July 21, 2010 P a g e | 10 As required by Title II of ADA, 28 CFR. Part 35 Sec. 35.105 and Sec. 35.150, Mn/DOT is conducting a self-evaluation of its facilities and developed this Transition Plan detailing how the organization will ensure that all of its facilities, services, programs and activities are accessible to all individuals. Transition Plan Management Mn/DOT’s transition plan is a living document that will receive routine updates. The first update is scheduled to occur one year from the plan’s formal adoption and on a four year cycle thereafter. To streamline plan updates and keep the document current and relevant, appendices will be updated annually if new information is available and does not alter the intent of the transition plan. When an appendix update is found to alter the intent of Mn/DOT’s Transition Plan the appendix and affected section(s) will be opened for public review and comment. The update schedule may be altered at the discretion of Mn/DOT based on changes in guidance from the United States Access Board, Federal policy, and Mn/DOT policy. Mn/DOT’s Transition Plan is available for continual public inspection through Mn/DOT’s website. ADA and its Relationship to Other Laws Title II of ADA is companion legislation to two previous federal statutes and regulations: the Architectural Barriers Acts of 1968 and Section 504 of the Rehabilitation Act of 1973. The Architectural Barriers Act of 1968 is a Federal law that requires facilities designed, built, altered or leased with Federal funds to be accessible. The Architectural Barriers Act marks one of the first efforts to ensure access to the built environment. Section 504 of the Rehabilitation Act of 1973 is a Federal law that protects qualified individuals from discrimination based on their disability. The nondiscrimination requirements of the law apply to employers and organizations that receive financial assistance from any Federal department or agency. Title II of ADA extended this coverage to all state and local government entities, regardless of whether they receive federal funding or not. When addressing accessibility needs and requirements, it is important to note that ADA and Title II do not supersede or preempt state or local laws that may offer equivalent or greater protections, such as the Minnesota Human Rights Act. Under Title II, Mn/DOT must meet these general requirements: • Must operate their programs so that, when viewed in their entirety, the programs are accessible to and useable by individuals with disabilities (28 C.F.R. Sec. 35.150). P a g e | 11 • • • • • • • May not refuse to allow a person with a disability to participate in a service, program or activity simply because the person has a disability (28 C.F.R. Sec. 35.130 (a). Must make reasonable modifications in policies, practices and procedures that deny equal access to individuals with disabilities unless a fundamental alteration in the program would result (28 C.F.R. Sec. 35.130(b) (7). May not provide services or benefits to individuals with disabilities through programs that are separate or different unless the separate or different measures are necessary to ensure that benefits and services are equally effective (28 C.F.R. Sec. 35.130(b)(iv) & (d). Must take appropriate steps to ensure that communications with applicants, participants and members of the public with disabilities are as effective as communications with others (29 C.F.R. Sec. 35.160(a). Must designate at least one responsible employee to coordinate ADA compliance [28 CFR § 35.107(a)]. This person is often referred to as the "ADA Coordinator." The public entity must provide the ADA coordinator's name, office address, and telephone number to all interested individuals [28 CFR § 35.107(a)]. Must provide notice of ADA requirements. All public entities, regardless of size, must provide information about the rights and protections of Title II to applicants, participants, beneficiaries, employees, and other interested persons [28 CFR § 35,106]. The notice must include the identification of the employee serving as the ADA coordinator and must provide this information on an ongoing basis [28 CFR § 104.8(a)]. Must establish a grievance procedure. Public entities must adopt and publish grievance procedures providing for prompt and equitable resolution of complaints [28 CFR § 35.107(b)]. This requirement provides for a timely resolution of all problems or conflicts related to ADA compliance before they escalate to litigation and/or the federal complaint process. Mn/DOT’s Compliance History Following the passage of ADA on July 6, 1990, Mn/DOT took initial steps to identify and address Title II requirements. In December of 1991 Mn/DOT received direction from the local Federal Highway Administration (FHWA) division to complete a curb ramp assessment and transition plan to comply with the new law. Based on direction from the FHWA and the requirements of the final rule passed on July 26, 1991 Mn/DOT developed the parameters to identify curb ramp needs and an investment plan which would be fully implemented by January 31, 1995. Mn/DOT records show that each district had completed a curb ramp inventory by December of 1992 and identified funding and a construction timetable that was to be completed by January 26, 1995. During the same timeframe, the Minnesota Department of Administration conducted an assessment of all state owned and leased properties to identify barriers to be corrected by the individual agencies. According to available Mn/DOT records, all employee occupied buildings were retrofitted to meet the ADA requirements outlined in 1990 and July 21, 2010 P a g e | 12 all subsequent new construction has followed Minnesota Building Codes which meet or exceed ADA requirements. Construction plans and a timetable were developed in 1994 for barrier removal and accessibility improvement for all Class I and II rest areas with work to be completed at the end of 1995. Mn/DOT had begun barrier removal on rest areas when it was determined that funding administered by the Department of Administration could not be used on rest area improvements. A list of current barriers at Mn/DOT rest areas can be found in Appendix D. From 1995 to 2001 Mn/DOT’s ADA efforts were largely decentralized, focusing primarily on reasonable accommodation for employees and transit, with compliance and oversight falling on individual offices and programs. In general, Mn/DOT had completed the retrofit requirements identified in ADA and was meeting compliance with new construction and reconstruction projects. During this time Mn/DOT did not maintain a centralized transition plan. In 2001 ADA became a point of focus with the Access Board’s issuance of the draft rules for public rights of way and the expiration of the moratorium on detectable warning surfaces. Mn/DOT provided comment to the draft rules in October of 2001, but only became aware of the detectable warning requirement in July of 2002 through an FHWA memo. A revised standard plan with truncated domes was issued in 2003 and has been required in new construction, reconstruction and alterations since 2003. In 2005 the Access Board issued a revision of the draft rules, titled Public Rights of Way Accessibility Guidance (PROWAG), to be utilized as best practices. The lifting of the detectable warning surfaces moratorium and the publication of PROWAG was the first new guidance affecting public rights of way since the initial passage of ADA in 1990. In September 2006, Mn/DOT’s Affirmative Action Office was asked to assess agency Title II compliance and determine needs in this area. As a result of the assessment, Mn/DOT took the following actions: • • • Designated an ADA Coordinator. Drafted a Notice of Non-Discrimination to provide information about the rights and protections of ADA to employees and applicants, as well as participants and users of Mn/DOT services, programs and activities. Established a grievance/complaint process to address or correct user concerns related to inaccessible pedestrian and transportation facilities under Mn/DOT’s jurisdiction. In 2007, an internal Mn/DOT ADA Advisory Council was formed. The primary function of this council was to assess and determine accessibility program needs and provide guidance to Mn/DOT administrators. The group includes key staff from Technical Support, Design, Investment Management (Planning), Construction, Traffic Operations, Maintenance Operations, Transit, Aeronautics and State Aid. Also in 2007, Mn/DOT updated its policy and procedures to more effectively respond to requests for Accessible Pedestrian Signals (APS). The policy and procedures require P a g e | 13 the installation of APS at every signalized intersection and at every pedestrian crossing in new and reconstruction projects. Mn/DOT launched its ADA web pages for public use in the spring of 2008. The pages include Mn/DOT’s Non-discrimination Notice, links to accessibility guidance and information and an online grievance process for users to voice their concerns regarding barriers preventing access to Mn/DOT facilities, programs and services. In 2008 Mn/DOT formed a standing external stakeholder advisory group, made up of citizens with disabilities and advocates for key disability groups in Minnesota. This committee provides important feedback and invaluable real-life experience regarding how persons with disabilities use Mn/DOT’s facilities, programs and services. They also serve as a voice for members of Minnesota’s disability community. Technical Memorandum 08-13-TM-05 Pedestrian (Curb) Ramp Guidelines was adopted and issued by the Deputy Commissioner in 2008 to clarify pedestrian curb ramp installation requirements to Mn/DOT staff and city and county engineers. In 2008, Mn/DOT contracted with an independent consultant to conduct an objective evaluation of the organization’s current policies, procedures and practices regarding ADA and Title II. The evaluation analyzed the impact of Mn/DOT policies, procedures and practices on accessibility within our state, and how accessibility impacted people with disabilities. The report identified policies, procedures and practices that do not comply with Title II requirements and suggested potential modifications to bring them into compliance (see Appendix H for the list of policies, procedure and practices). Mn/DOT’s Office of Affirmative Action, Office of Technical Support and Office of Transit began conducting ADA Title II training in 2008. The training provides an introduction to ADA Title II requirements and is offered to local partners and Mn/DOT engineers/employees in maintenance, design, construction and planning. Finally, in 2009, as a part of the development of Mn/DOT’s Transition Plan, Mn/DOT Issued Technical Memorandum 10-02-TR-01 Adoption of Public Rights of way Accessibility Guidance to Mn/DOT staff, cities and counties. The memo makes Public Rights-of-Way Accessibility Guidelines (PROWAG) the primary guidance for accessible facility design on Mn/DOT projects. Mn/DOT is currently beginning the integration of PROWAG into the Road Design Manual and other technical guidance. Program Location and Staffing Managing and implementing the Mn/DOT ADA Transition Plan requires a multidisciplinary approach encompassing policy development, outreach, technical support and oversight. These responsibilities, required by 28 CFR 35.107, will be managed by three peer positions: the Title II Coordinator, ADA Implementation Coordinator, and ADA Design Engineer. July 21, 2010 P a g e | 14 The Title II Coordinator is located in the Affirmative Action Office under the direction of the Employee and Corporate Services Division. The Title II Coordinator is responsible for addressing complaints as they are received and tracking the overall progress of the implementation of the Transition Plan. The Title II coordinator is also responsible for the investigation of all formal grievances made against Mn/DOT. The ADA Implementation Coordinator is responsible for developing policy and procedures to integrate Title II requirements into Mn/DOT practices to ensure the obligations of ADA and the Transition Plan are met. The Implementation Coordinator will also function as chair of the Internal ADA committee and co-chair of ADA Stakeholders group. The ADA Implementation Coordinator is under the direction of the Employee and Corporate Service Division. The ADA Design Engineer position resides with in the Operations Division and works with the ADA Implementation Coordinator to develop policy and provide technical support for design and construction at a project level. In addition to providing support for projects, this position will also be available to assist districts in implementing design options that address accessibility complaints. Please refer to Appendix B for contact information. Committee Structure Due to the far reaching and ongoing implications of the ADA, collaboration is an important tool for Mn/DOT to indentify issues and solutions that reflects the needs of the agency and users. To ensure that stakeholders are represented Mn/DOT has established three committees, one external and two internal, to assist and advise on ADA policy development. The committees function independent of each other, but their input is coordinated by ADA Implementation Coordinator who a co-chair on all of the committees. Detail on the roles and membership of the individual committees follows. Mn/DOT’s ADA Accessibility Advisory Committee The Mn/DOT ADA Accessibility Advisory Committee (MAAAC) was created in 2008 to begin a constructive dialogue on accessibility issues and advise Mn/DOT on compliance with Title II of the ADA. Since MAAAC’s inception, the advisory role has expanded from a focus on achieving Title II compliance to providing input on prioritizing funds for ADA projects, design feedback and communication tools. The committee’s current representation was identified and established by the Title II Coordinator. MAAAC’s membership is composed of individuals with differing disabilities, Mn/DOT representatives from the Bicycle and Pedestrian section, the Commissioner’s Office, and the Office of Policy, Analysis, Research and Innovation, and representatives from the Minnesota State Council on Disability and the Metropolitan Council’s Transportation Accessibility Advisory Committee. P a g e | 15 The MAAAC meets monthly in working session type meetings to provide feedback on policy development, including the Transition Plan, and learn about Mn/DOT operations and advise on accessibility issues. Meetings are co-chaired by the ADA Implementation Coordinator a member elected from the external representation. Mn/DOT is not a voting member of the committee. MAAAC is currently re-evaluating its structure to identify and recruit a broader cross-section to represent more types of disabilities and provide geographic balance. Expected outcomes of the re-evaluation include an application process for membership and an annual work plan. Americans with Disabilities Act Advisory Committee (ADAAC) In 2007 Mn/DOT convened an internal advisory committee with representation from a cross section of functional areas to assist in the development of policy and practice to integrate ADA into Mn/DOT project delivery and operations. ADAAC meets on a bimonthly basis, with additional meetings called as needed. The committee focuses on issues with programmatic impact and identifies key resources for resolution. The ADA Implementation Coordinator is the ADAAC chair. Committee membership includes the following offices and sections: • • • • • • • • • • • • • Affirmative Action Aeronautics Maintenance Transit Traffic, Safety and Technology State Aid Information Resource Management Bridge Bicycle and Pedestrian Section Construction Pre Construction Maintenance Technical Support ADA Implementation Committee The ADA Implementation Committee was identified as a need during the development of the transition plan in order to develop and expand the agency’s knowledge base and information sharing for ADA design and policy. The committee is comprised of one design or traffic engineer from each Mn/DOT district and staff from the Office of Traffic Safety and Technology, Geometrics, Program Delivery and the Bicycle and Pedestrian Section. The members function as points of contact and are responsible for tracking ADA requests in their district, providing technical support for projects and providing feedback to ADA policy and practice. The committee began meeting in January 2010. The ADA Implementation Coordinator and the ADA Design Engineer co-chair the committee. July 21, 2010 P a g e | 16 Grievance Procedure Under the Americans with Disabilities Act users of Mn/DOT facilities and services have the right to file a grievance if they believe Mn/DOT has not provided reasonable accommodation. The Grievance Procedure required by 28 CFR 35.107 can be found in Appendix A of this report or on Mn/DOT accessibility website provides details on how to file a complaint. Under the Grievance Procedure, a formal complaint must be filed within 180 calendar days of the alleged occurrence. Mn/DOT will act or respond only to complaints made through the grievance process identified in Appendix A. Communications According to Section 35.160(a) of ADA, “…A public entity shall take appropriate steps to ensure that communications with applicants, participants, and members of the public with disabilities are as effective as communications with others.” This means that Mn/DOT is required to provide equally effective communication to individuals with disabilities. Equally effective communication can be provided by offering alternative formats, auxiliary aid(s) and/or services upon request. For example, interpreters are hired as requested for the hearing impaired and text materials that are accessible by screen readers are made available to users. Website Communications Background State Law requires that all of the State of Minnesota’s information systems comply with the 2009 MN Law to incorporate Section 508 of the Rehabilitation Act and the Web Content Accessibility Guidelines 2.0. The State Office of Enterprise Technology has undertaken a project to put standard state processes, tools, and guidelines in place. This will enhance end user accessibility to state information systems, and make sure that all Minnesota citizens have reasonable access to the information they need. Mn/DOT will fully comply with or exceed the standards set by the Office of Information Technology regarding compliance with this law. Mn/DOT is participating in a committee to set the state standard, and will participate in future committees advising on needs for training and oversight. We anticipate that OET will set the standard at WCAG 2.0, compliance level AA. Current situation Several years ago Mn/DOT redesigned its internal and external Web templates to be more accessible. For example, templates are now controlled by style sheets and styles P a g e | 17 are set for headers and subhead navigation items. All Web editors are required to use these templates for new and revised pages. Our Rules for the Web include several items relating to accessibility. For example, all images much include “alt tags” and blinking or scrolling script is not allowed. All Web editors are required to follow these rules; however, we know that some older pages are not in compliance. We also have an internal Web site that includes additional resources for Web writers and developers, including links to the WCAG 2.0 standards and our Rules for the Web. Communications is developing training for word processing and other staff about preparing accessible Word and PDF documents. We are also working with contractors to ensure that documents prepared as part of a contract with Mn/DOT are compliant. We have developed an external page www.dot.state.mn.us/ada that includes a variety of information about Mn/DOT and the ADA. This includes our transition plan, a way to file complaints with Mn/DOT, links to other transportation-related resources and tips about how to use our pages. A link to this page is included in the footer of every Mn/DOT Web page. 2010 Goals • More fully integrate transition plan elements into our Web pages. For example, we will add an “ADA” tab to pages about construction projects. This will link to a page that documents the specific elements of that project that are related to ADA. We will do this on many pages in 2010 and by 2011 expect this to be mandatory. • Review the Rules for the Web and the templates for compliance with WCAG 2.0 and make revisions as necessary. This step includes educating Web writers and developers about changes to the current standards. • Develop and implement a plan for spot checking and ensuring compliance with WCAG for all new or redeveloped pages. • Continue to work with Web editors to move older pages to the new templates. By December 2010 we will have a plan in place for any remaining pages. Public Involvement Mn/DOT recognizes that broad public participation is essential to the development of Minnesota’s transportation system. As required by the ADA and Mn/DOT’s public participation guidance Hear Every Voice, any public meeting, hearing, or comment period held by Mn/DOT is accessible. Mn/DOT provides qualified interpreters upon request and will provide documents in an accessible electronic format or other alternative formats, such as large print or Braille. All public notices shall contain contact information for accommodation requests. July 21, 2010 P a g e | 18 Public meetings, trainings, programs and other events must be in an accessible location and indicated on the meeting notice. Project managers and other Mn/DOT staff are directed to use the Department of Justice Guide to Conducting Accessible Meetings to assist in planning public meetings. Self Evaluation Mn/DOT, as required by Title II of ADA, must conduct a self-evaluation of physical assets and current policies and practices. Mn/DOT has identified seven areas that will need to have and maintain inventories. As inventories are completed, they will be included as appendices to the transition plan. Fixed Work Sites Mn/DOT owns and leases numerous buildings throughout the state. Mn/DOT has identified 46 buildings that are routinely accessed by the public. The 46 buildings are currently compliant, however, in the coming year Mn/DOT will re-evaluate these buildings for potential accessibility improvements. The buildings have been divided into two categories; Priority One and Priority Two. Priority One buildings are those buildings that have employee use and a high potential for public use. Priority Two buildings are those buildings that employees use and have moderate potential for public use. A list of the identified buildings can be found in Appendix C. Rest Areas Several accessibility guidelines, codes and regulations apply to rest areas. ADA Accessibility Guidelines (ADAAG) applicable to rest area type facilities include guidelines for: • Buildings and Facilities (1991, as amended through 2002). • Play Areas (published in the Federal Register October 18, 2000, and amended November 20, 2000). • Recreation Facilities (published in the Federal Register on September 3, 2002). • Outdoor Developed Areas (draft of final guidelines released on October 19, 2009, but are not yet codified). Minnesota State Building Code, Chapter 1341 also includes specific requirements related to accessibility. Some State accessibility requirements in Chapter 1341 are more restrictive than ADAAG. In addition to ADAAG, the Code of Federal Regulations (CFR) includes regulations related to accessibility that apply to Interstate rest areas and historic rest areas and waysides: • Interstate Rest Areas: 49 CFR 27.75 requires States to make Interstate rest area facilities accessible whenever the State uses federal financial assistance to improve the rest area or whenever the State uses federal financial assistance to P a g e | 19 • construct, reconstruct or otherwise alter the roadway adjacent to or in the near vicinity of the rest area. Historic Rest Areas & Waysides: Several State rest areas and waysides are historic properties listed in or eligible for listing in the National Register of Historic Places or are designated as historic under an appropriate State or local law. 28 CFR 35.151(d) requires alterations comply, to the maximum extent feasible, with Section 4.1.7 of ADAAG. In 1990, the Minnesota Department of Administration (DOA) contracted with architectural consultants to survey all buildings and facilities owned and managed by the State. The survey included Mn/DOT rest areas and waysides. Unfortunately, DOA completed the survey before the Federal government finalized ADAAG in 1991. Mn/DOT staff resurveyed all Class I rest areas by 1994 using ADAAG and recorded actual conditions and identified corrective measures required to comply. (See Appendix D) In March 1994, the DOA approved a priority listing of Mn/DOT facilities. Additionally, during FY 1993-04 the DOA distributed $1,700,000 in State funds to Mn/DOT for ADA improvements to buildings and facilities. Since Travel Information Centers, Class I and II rest areas in the southern portion of the state receive the highest public use, Mn/DOT considers these facilities the highest priority for rest area accessibility improvements. Mn/DOT took action to correct then-current deficiencies at the highest priority facilities, except those actions deemed technically infeasible or where Mn/DOT had identified and scheduled the facility for comprehensive replacement in the near future. Since 1991, Mn/DOT has designed and built all new rest area facilities, including buildings, site features and parking areas in compliance with then current ADAAG and Minnesota State Building Codes. Also, since that time, Mn/DOT has completed rest area rehabilitation and reinvestment projects that included corrective action to bring facilities into compliance with ADAAG and Minnesota State Building Code requirements. Mn/DOT has not corrected deficiencies at all lower priority facilities. In 2007, Mn/DOT retained a consultant to conduct a comprehensive assessment of the physical condition of (49) Class I rest areas. The consultant found accessibility deficiencies at (46) of the rest areas evaluated. Mn/DOT estimates it would cost $1.9M2.5M to correct the accessibility deficiencies found at the 46 Class I rest areas. Accessible Pedestrian Signals (APS) In 2008, Mn/DOT completed a statewide inventory (Appendix E) of all 1,171 signalized intersections managed by Mn/DOT. There are 120 intersections that already have APS installed and 83 more planned in 2010. As part of the inventory each intersection received a rating to determine the priority for conversion to an APS signal. The ranking of the intersections was done utilizing the methodology laid out in the National Cooperative Highway Research Project 3-62 APS Prioritization Tool. In general the signalized intersections with higher scores are the ones with the greatest need for conversion to APS, but the rankings are always considered within context so that the July 21, 2010 P a g e | 20 greatest needs are served first. Factors outside the ranking that affect an intersection’s priority for APS include the number of pedestrians at the intersection, the presence of nursing homes, hospitals, transit, and other public services, and requests for APS. All new construction and reconstruction projects include APS, per direction from PROWAG. Each district traffic engineer will be responsible for determining which intersections are priorities in their district, taking the intersection score and other factors into consideration. Curb ramps and sidewalks Mn/DOT recognizes that a self evaluation of pedestrian facilities within its public rights of way is a key element to a comprehensive and successful transition plan. At the time of this plan’s publication, the self evaluation has not been accomplished, but a method and timeline for completion has been identified. The lack of an inventory of curb ramps represents a deficiency, but it does not alter Mn/DOT’s ability and commitment to provide and improve accessibility on projects constructed in the interim. To create a more complete transition plan, Mn/DOT will conduct a self evaluation of the location and condition of pedestrian facilities in Mn/DOT’s right of way using a two phase approach. In the first phase of the inventory Mn/DOT will collect information on intersection conditions. The second phase will focus on the pedestrian facilities parallel to the roadway. The inventory process being utilized by Mn/DOT was developed and piloted in Mn/DOT’s District 1 based in Duluth/Virginia. Over the summer of 2009 District 1 staff inventoried all intersections on the State Highway system. Data collected included the location and condition rating of ramps, adjacent sidewalks, crosswalks, curb and gutter, signs and signals. The data was collected in the field using a handheld Global Positioning System unit and displayed on aerial photographs. Phase two which will inventory pedestrian facilities parallel to the roadway will be piloted by District 1 in the summer of 2010. Based on the outcome of the phase two pilot a timeline for the other districts will be developed. All districts will be completing an inventory as required by ADA. Districts will receive training on how to collect the data in spring of 2010 and Greater Minnesota Districts are expected to have a completed phase one inventory available to the public by the end of 2010. Mn/DOT’s Metro District will be complete its phase one inventory in 2011. The extended timeframe for Metro’s inventory allows the district to identify a key corridor process to prioritize the order in which information will be collected and to integrate the inventory with existing databases. Completed inventories will be incorporated as an appendix to this plan, as they become available. Once completed, the inventory will be an important tool to assist in project scoping and development and to track Mn/DOT progress on barrier removal and the integration of facilities meeting PROWAG guidance. The inventory will be continually updated as facilities are upgraded. P a g e | 21 The inventory template that will be used for both phases can be found in Appendix F. Greater Minnesota Transit As the administrating agency for Federal Transit Administration grant programs, Mn/DOT is required to ensure that grant recipients comply with the Americans with Disabilities Act. Specific transit-related aspects of ADA fall into two distinct categories: (1) ensuring that transit services and facilities are designed to allow access by individuals with disabilities and (2) ensuring that transit vehicles purchased with federal funds meet the accessibility standards of ADA With respect to the first function, the Office of Transit has developed tools for Mn/DOT staff to use to monitor ADA compliance as part of grant oversight. This includes checking that the telephone reservation system is accessible to all; schedulers capture necessary passenger information to ensure that the person’s trip needs can be fully accommodated; ADA trip requests in Duluth, East Grand Forks, La Crescent, Mankato, Moorhead, Rochester and St. Cloud are not denied at a higher rate than other trip requests; system advertising and information is produced in a variety of formats; transit facilities are laid out with appropriate clearances and accessibility; etc. Some older bus garages and administrative facilities are not fully ADA accessible, but the noncompliant elements do not provide a barrier to the services provided to the general public. As facilities are replaced or receive major remodeling they will be required to be constructed to current ADA and Minnesota Building code standards. Reasonable accommodations will be provided at all locations as needs are identified. With respect to vehicle purchases, the Office of Transit maintains a full array of vehicle specifications – all of which meet the accessibility standards of ADA. All transit vehicles acquired with grants through Mn/DOT are fully ADA-compliant. Because this policy has been in place for many years, the current fleet acquired through Mn/DOT is ADAaccessible. Mn/DOT’s inventory of right of way features will include an assessment of the accessibility of transit stops on Mn/DOT right of way. To be accessible, bus stop boarding and alighting areas must provide a clear length of 8 feet minimum, measured perpendicular to the curb or street or highway edge, and a clear width of 5 feet minimum, measured parallel to the street or highway. Bus stop boarding and alighting areas must connect to streets, sidewalks, or pedestrian paths by a pedestrian access route. The grade of the bus stop boarding and alighting area must be the same as the street or highway, to the maximum extent practicable, and the cross slope of the bus stop boarding and alighting area must not be greater than 2 percent. Pedestrian Bridges, and Underpass Inventory Mn/DOT owns 170 pedestrian bridges and underpasses throughout the state. Any pedestrian bridge or underpass crossing an interstate or state highway is the responsibility of Mn/DOT, unless an agreement has been made with a local government agency. The location of all pedestrian bridges and underpasses within Mn/DOT’s right July 21, 2010 P a g e | 22 of way has been documented by Mn/DOT (Appendix G). The next step will be to assess the accessibility of each facility. The Office of Bridge will be responsible for determining the accessibility of the pedestrian bridges in their jurisdiction by the end of 2010. Once the accessibility portion of the Pedestrian Bridges is complete, Appendix G will be updated. To be accessible, pedestrian bridges and underpasses must have a ramp leading up to the overpass, the ramp must meet the PROWAG standards for ramps, railings must meet the requirements found in the Mn/DOT Bikeway Facility Design Manual, the bridges must have a cross slope of no more than 2 % and a running slope of no more than 5%. Those that do not meet accessibility requirements according to PROWAG will be replaced as necessary. Bridges and underpasses that are compliant with the standards in place when they were built will require further discussion to determine the feasibility of compliance with PROWAG and the future of the structure in general. Policies In 2009, Mn/DOT contracted with an outside consultant to conduct an audit of its policies and procedures in order to identify areas where modifications may be needed to ensure full compliance with ADA Title II and Section 504. The study involved a review of over 200 policies and procedures that Mn/DOT uses to provide facilities, services, and programs to the public. Forty-one policies, primarily focused on project development and design, were identified as needing improvement to integrate accessibility more consistently into MN/DOT projects and operations. No policies were identified as a barrier to providing accessibility. Mn/DOT will be developing a systematic approach to ensure long-term compliance with ADA Title II and Section 504 for all policies and procedures. A listing of policies and procedures that Mn/DOT will be reviewing and updating can be found in Appendix H. Maintenance Mn/DOT is responsible for the seasonal and structural maintenance of its facilities. As part of the policy review identified in the Transition Plan, Mn/DOT is examining its current policies and procedures to improve maintenance for pedestrian facilities. Mn/DOT’s Maintenance Office will be leading the policy development and is scheduled to have a policy identified by summer of 2011. The policy will identify operation guidance for maintaining sidewalks. Guiding the discussion is Federal Code 23 U.S.C. § 116 which obligates a State DOT to maintain projects constructed with Federal-aid funding or enter into a maintenance agreement with the appropriate local official where such projects are located. The discussion will also address snow removal and ice treatment on sidewalks in accordance with 28 CFR § 35.133, which requires public agencies to maintain walkways in an accessible condition for all pedestrians, including persons with disabilities, with only isolated or temporary interruptions in accessibility. Part of this maintenance obligation includes reasonable snow removal efforts. P a g e | 23 Correction Program The Minnesota Department of Transportation is committed to addressing the barriers identified in the self evaluation. As self evaluations are completed, facilities that are inaccessible will be prioritized by districts as part of a separate barrier removal program. Facilities that are accessible, but do not meet PROWAG standards will continue to be improved through Mn/DOT’s routine construction program. The funding and schedule of accessibility improvements that are being made as part Mn/DOT’s routine construction program are determined through Mn/DOT’s Statewide Transportation Improvement Plan (STIP). Training As part the adoption of Public Rights of Way Accessibility Guidelines and the Transition Plan, Mn/DOT will be conducting agency-wide training on both design and policy. Mn/DOT has allocated an initial $125,000.00 to train Mn/DOT staff, cities and counties, and external partners on ADA and Title II. Classes will be offered at both introductory and advanced levels. The training will be developed as modules that can be taught independently or integrated into existing training as appropriate. The training will be topically based on policy, mobility needs and design. Modules identified for development and deployment in 2010 include: • • • • • • ADA and Title II overview and requirements Inventory Collection Technical Training o PROWAG (Public Right OF Way Accessibility Guidelines) o Curb Ramps o APS (Accessible Pedestrian Signals) o Intersection Geometrics o Pedestrian Design & Planning o Maintenance, e.g., Inventory, Snow & Ice, Faulting, Maintenance Agreements Project Development o Project Scoping o Bicycle & Pedestrian Planning o Inventories Accessible Communications o Document Development o Website Development o Public Meetings Policy & Procedure o Public Involvement o Complaint Procedures As appropriate, Mn/DOT will work with educational institutions and advocacy groups to identify needs and develop curriculum. July 21, 2010 P a g e | 24 Appendix A How to file a Grievance The procedure to file a grievance is as follows: 1. A formal written grievance should be filed on ADA Grievance Form. An oral grievance can be filed by contacting ADA Title II Coordinator. The oral grievance will be reduced to writing by ADA Coordinator utilizing ADA Grievance Form. Additionally, individuals filing a grievance are not required to file a grievance with Mn/DOT, but may instead exercise their right to file a grievance with the Department of Justice. • The name, address, and telephone number of the person filing the grievance. • The name, address, and telephone number of the person alleging ADA violation, if other than the person filing the grievance. • A description and location of the alleged violation and the remedy sought. • Information regarding whether a complaint has been filed with the Department of Justice or other federal or state civil rights agency or court. • If a complaint has been filed, the name of the agency or court where the complaint was filed, and the date the complaint was filed. 2. The grievance will be either responded to or acknowledged within 10 working days of receipt. If the grievance filed does not concern a Mn/DOT facility, it will be forwarded to the appropriate agency and the grievant will be notified. 3. Within 60 calendar days of receipt, the ADA Title II Coordinator will conduct the investigation necessary to determine the validity of the alleged violation. If appropriate, ADA Title II Coordinator will arrange to meet with the grievant to discuss the matter and attempt to reach a resolution of the grievance. Any resolution of the grievance will be documented in Mn/DOT’s ADA Grievance File. 4. If a resolution of the grievance is not reached, a written determination as to the validity of the complaint and description of the resolution, if appropriate, shall be issued by ADA Title II Coordinator and a copy forwarded to the grievant no later than 90 days from the date of Mn/DOT’s receipt of the grievance. 5. The grievant may appeal the written determination. The request for reconsideration shall be in writing and filed with the Minnesota Department of Transportation Ombudsman within 30 days after the ADA Title II Coordinator’s determination has been mailed to the grievant. Mn/DOT’s Ombudsman shall review the request for reconsideration and make a final determination within 90 days from the filing of the request for reconsideration. P a g e | 25 6. If the grievant is dissatisfied with Mn/DOT’s handling of the grievance at any stage of the process or does not wish to file a grievance through the Mn/DOT’s ADA Grievance Procedure, the grievant may file a complaint directly with the United States Department of Justice or other appropriate state or federal agency. The resolution of any specific grievance will require consideration of varying circumstances, such as the specific nature of the disability; the nature of the access to services, programs, or facilities at issue and the essential eligibility requirements for participation; the health and safety of others; and the degree to which an accommodation would constitute a fundamental alteration to the program, service, or facility, or cause an undue hardship to Mn/DOT. Accordingly, the resolution by Mn/DOT of any one grievance does not constitute a precedent upon which Mn/DOT is bound or upon which other complaining parties may rely. File Maintenance Mn/DOT’s ADA Coordinator shall maintain ADA grievance files for a period of three years. July 21, 2010 P a g e | 26 Appendix B ADA Program Contacts Title II Coordinator Lynnette M. Geschwind 395 John Ireland Blvd. MS 200 St. Paul, MN 55155 Ph: 651-366-4717 Fax: 651-366-4155 E-mail: [email protected] ADA Implementation Coordinator Kristie M. Billiar 395 John Ireland Blvd. MS 670 St. Paul, MN 55155 Ph: 651-366-3174 Fax: 651-366-4155 E-mail: [email protected] ADA Design Engineer Todd Grugel 395 John Ireland Blvd. MS 670 St. Paul, MN 55155 Ph: 651-366-3531 Fax: 651-366-4155 E-mail: [email protected] P a g e | 27 Appendix C Mn/DOT Work Sites Priority One Sites LOCATION DULUTH VIRGINIA BEMIDJI CROOKSTON ERSKINE:SCALE THIEF RIVER FALLS(1) BRAINERD/BAXTER ST CLOUD DETROIT LAKES MOORHEAD: SCALE RED RIVER: SCALE MORRIS ROCHESTER OWATONNA MANKATO:EXISTING MANKATO WINDOM WORTHINGTON: SCALE WILLMAR MARSHALL LITCHFIELD: Joint Use HUTCHINSON: Joint use WATERSEDGE ROSEVILLE GOLDEN VALLEY OAKDALE GOLDEN VALLEY DAYTONPORT: SCALE ST CROIX: I94 SCALE ST PAUL:LEASED DOA ST PAUL: 222 PLATO PLYMOUTH EAGAN July 21, 2010 BUILDING TYPE/SERVICE HEADQUARTERS HEADQUARTERS HEADQUARTERS HEADQUARTERS SCALE: WEIGH TRUCK STATION HEADQUARTERS HEADQUARTERS HEADQUARTERS SCALE: WEIGH SCALE: WEIGH HEADQUARTERS HEADQUARTERS HEADQUARTERS HEADQUARTERS ANNEX HEADQUARTERS SCALE: WEIGH HEADQUARTERS HEADQUARTERS TRUCK STATION TRUCK STATION HEADQUARTERS RTMC BUILDING HEADQUARTERS HEADQUARTERS PATROL BUILDING SCALE BUILDING SCALE BUILDING TRANSP BLDG AERONAUTICS DRIVERS LICENSE DRIVERS LICENSE P a g e | 28 ARDEN HILLS MAPLEWOOD ARDEN HILLS ALBERTVILLE DRIVERS LICENSE MATLS & RES LAB TRAINING CENTER MNROAD BLDG Priority Two LOCATION THOMPSON HILL TIC/RA GRAND RAPIDS FERGUS FALLS MOORHEAD: Joint-use fac (2) WINONA ALBERT LEA MENDOTA HEIGHTS EDEN PRAIRIE FORT SNELLING BUILDING TYPE/SERVICE PATROL STAT OFF TRUCK STATION TRUCK STATION TRUCK STATION TRUCK STATION TRUCK STATION TRUCK STATION TRUCK STATION CENTRAL SERVICES P a g e | 29 Appendix D Rest Area Facility Condition Assessment Facility Location Adrian EB Site Features Site Features East Picnic Shelter West Picnic Shelter Main Building \Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Auto Parking Adrian EB Total $2,705 $4,581 $3,351 $3,351 $4,199 $7,639 $812 $1,017 $749 $2,601 $824 $1,802 $30,828 $214 $64,673 Pedestrian Paving Water Supply Slab on Grade Slab on Grade Exterior Doors Exterior Doors Fittings Fittings Fittings Plumbing Fixtures Plumbing Fixtures Communications & Security Special Purpose Room Parking Lots Replace Concrete Sidewalk 4" Thick (SF) Adrian WB Site Features Site Features Picnic Shelter Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Auto Parking Adrian WB Total $2,705 $4,581 $3,351 $4,057 $4,199 $7,639 $749 $812 $1,017 $824 $2,601 $1,802 $30,828 $214 $65,379 Pedestrian Paving Water Supply Slab on Grade Slab on Grade Exterior Doors Exterior Doors Fittings Fittings Fittings Plumbing Fixtures Plumbing Fixtures Communications & Security Special Purpose Room Parking Lots Replace Concrete Sidewalk 4" Thick (SF) July 21, 2010 Cost System Correction Replace Exterior Drinking Fountain; ADA Accessible Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Replace 3'-0" x 7'-0" aluminum door, incl. vision Automatic door opener on existing door Replace accessible restroom signage. Install grab bars in accessible stall. Install mirror at accessible height. Replace drinking fountain Provide protective insulation for exposed piping. Replace public telephone Remove one fixture and create accessible stall. Install ADA "Van Accessible" Parking Sign Replace Exterior Drinking Fountain; ADA Accessible Replace unfinished concrete floor unfinished Remove and replace concrete sidewalk, 4" wide Replace 3'-0" x 7'-0" aluminum door, incl. vision Automatic door opener on existing door Install mirror at accessible height Replace accessible restroom signage Install grab bars in accessible stall Provide protective insulation for exposed piping Replace drinking fountain Replace public telephone Remove one fixture and create accessible stall. Install ADA "Van Accessible" Parking Sign Distress Qty Unit Missing Inadequate Damaged Damaged Damaged Damaged Inadequate Missing Inadequate Inadequate Missing Inadequate Inadequate Inadequate 250 2 5 5 2 1 4 6 2 1 6 1 2 1 S.F. Ea C.S.F C.S.F Ea Ea Ea L.F. Ea Ea Ea Ea Ea Ea Missing Inadequate Damaged Damaged Damaged Damaged Inadequate Inadequate Missing Missing Inadequate Inadequate Inadequate Inadequate 250 2 5 100 2 1 2 4 6 6 1 1 2 1 S.F. Ea C.S.F L.F. Ea Ea Ea Ea L.F. Ea Ea Ea Ea Ea P a g e | 30 Anchor Lake Site Features Main Building Main Building Main Building Main Building Main Building Main Building Main Building Anchor Lake Total $5,721 $1,435 $749 $2,280 $4,270 $1,802 $6,779 $51,705 $75,341 Site Development Exterior Doors Fittings Fittings Fittings Communications & Security Communications & Security Special Purpose Room Replace Exterior Drinking Fountain; ADA Accessible Repair aluminum door Install mirror at accessible height Provide protective insulation for exposed piping Provide accessible service counter Replace public telephone Replace fire alarm control panel Construct Single-User Toilet Room Inadequate Damaged Missing Missing Inadequate Inadequate Inadequate Missing 1 2 2 8 14 1 1 1 Ea Ea Ea Ea L.F. Ea Ea Ea Baptism River Main Building Main Building Main Building Main Building Main Building Baptism River Total $406 $2,880 $1,802 $6,779 $51,705 $63,572 Fittings Fittings Communications & Security Communications & Security Special Purpose Room Replace accessible restroom signage Provide protective insulation for exposed piping Replace public telephone Replace fire alarm control panel Construct Single-User Toilet Room Inadequate Missing Inadequate Inadequate Missing 2 8 1 1 1 Ea Ea Ea Ea Ea Beaver Creek Site Features Site Features East Picnic Shelter Picnic Shelter East Picnic Shelter West West Picnic Shelter $2,705 $2,291 $3,351 $3,351 $3,351 $3,351 Pedestrian Paving Water Supply Slab on Grade Slab on Grade Slab on Grade Slab on Grade Replace Concrete Sidewalk 4" Thick (SF) 250 1 5 5 5 5 S.F. Ea C.S.F C.S.F C.S.F C.S.F Main Building Main Building Main Building Main Building Auto Parking Beaver Creek Total $5,231 $30,828 $1,623 $24,345 $214 $80,641 Exterior Doors Special Purpose Room Site Earthwork Site Earthwork Parking Lots Replace 3'-0" x 7'-0" aluminum storefront doors Remove one fixture and create accessible stall. Remove and replace concrete sidewalk, 4' wide Remove and replace concrete sidewalk, 4' wide Install ADA "Van Accessible" Parking Sign Missing Inadequate Damaged Damaged Damaged Damaged Beyond Useful Life Inadequate Damaged Damaged Inadequate 2 2 40 600 1 Ea Ea L.F. L.F. Ea Big Spunk Site Features Site Features Site Features Main Building Main Building $3,136 $31,527 $138 $1,425 $812 Pedestrian Paving Pedestrian Paving Water Supply Exterior Doors Fittings Replace Concrete Curb Cut with ADA Curb Cut Construct & provide ADA conc. ramp and steps Inadequate Missing Inadequate Damaged Inadequate 2 40 1 2 4 Ea L.F. Ea Ea Ea Replace Exterior Drinking Fountain; ADA Accessible Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Replace Exterior faucet handle with ADA lever type Repair aluminum door Replace accessible restroom signage. P a g e | 31 Main Building Main Building Main Building Main Building Auto Parking Big Spunk Total $2,033 $749 $1,802 $51,705 $607 $93,944 Fittings Fittings Communications & Security Special Purpose Room Parking Lots Install grab bars in accessible stall. Install mirror at accessible height. Replace public telephone Construct Single-User Toilet Room Blue Earth EB Site Features Site Features East Picnic Shelter West Picnic Shelter Main Building Auto Parking Blue Earth EB Total $2,705 $138 $3,351 $3,351 $1,802 $214 $11,561 Pedestrian Paving Water Supply Slab on Grade Slab on Grade Communications & Security Parking Lots Replace Concrete Sidewalk 4" Thick (SF) Blue Earth WB North Picnic Shelter South Picnic Shelter Main Building Auto Parking Blue Earth WB Total $3,351 $3,351 $1,171 $214 $8,087 Burgen Lake East Picnic Shelter West Picnic Shelter $1,623 $1,623 Main Building Main Building Main Building Main Building Main Building Main Building Main Building Burgen Lake Total $5,231 $812 $2,033 $749 $2,601 $1,802 $30,828 $47,302 Cass Lake Site Features Main Building Cass Lake Total July 21, 2010 $3,136 $1,190 $4,326 Missing Missing Inadequate Missing Inadequate 12 2 1 1 100 L.F. Ea Ea Ea L.F. Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Replace public telephone Install ADA "Van Accessible" Parking Sign Missing Inadequate Damaged Damaged Inadequate Inadequate 250 1 5 5 1 1 S.F. Ea C.S.F C.S.F Ea Ea Slab on Grade Slab on Grade Communications & Security Parking Lots Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Replace public telephone Install ADA "Van Accessible" Parking Sign Damaged Damaged Inadequate Inadequate 5 5 1 1 C.S.F C.S.F Ea Ea Slab on Grade Slab on Grade Remove and replace concrete sidewalk 4' wide Remove and replace concrete sidewalk 4' wide 40 40 L.F. L.F. Exterior Doors Fittings Fittings Fittings Plumbing Fixtures Communications & Security Special Purpose Room Replace 3'-0" x 7'-0" aluminum storefront doors Replace accessible restroom signage. Install grab bars in accessible stall. Install mirror at accessible height. Replace drinking fountain Replace public telephone Remove one fixture and create accessible stall. Damaged Damaged Beyond Useful Life Inadequate Missing Missing Inadequate Inadequate Inadequate 2 4 12 2 1 1 2 Ea Ea L.F. Ea Ea Ea Ea Pedestrian Paving Exterior Doors Replace Concrete Curb Cut with ADA Curb Cut Repair aluminum door Inadequate Damaged 2 2 Ea Ea Realign and Re-stripe Parking Space for ADA Access Replace Exterior faucet handle with ADA lever type P a g e | 32 Central Minnesota TIC Site Features Site Features Main Building Main Building Main Building Main Building Central Minnesota TIC Total $14,432 Clear Lake Site Features Site Features West Picnic Shelter Main Building Main Building Main Building Main Building Main Building Main Building Main Building Clear Lake Total $1,623 $2,291 $1,566 $2,880 $1,802 $4,270 Slab on Grade Water Supply Fittings Fittings Communications & Security Fixed Furnishings Remove and replace concrete sidewalk 4' wide Damaged Inadequate Inadequate Missing Inadequate Inadequate 40 1 25 8 1 14 $2,705 $2,291 $3,351 $2,033 $749 $812 $886 $2,601 $1,802 $51,705 $68,935 Pedestrian Paving Water Supply Slab on Grade Fittings Fittings Fittings Plumbing Fixtures Plumbing Fixtures Communications & Security Special Purpose Room Replace Concrete Sidewalk 4" Thick (SF) Replace unfinished concrete floor unfinished Install grab bars in accessible stall. Install mirror at accessible height. Replace accessible restroom signage. Provide protective insulation for exposed piping Replace drinking fountain Replace public telephone Construct Single-User Toilet Room Missing Inadequate Damaged Missing Missing Inadequate Inadequate Inadequate Inadequate Missing 250 1 5 12 2 4 8 1 1 1 $1,802 Communications & Security Replace public telephone Inadequate 1 Ea Replace Exterior Drinking Fountain; ADA Accessible Replace directional signage Provide protective insulation for exposed piping Replace public telephone Provide accessible service counter Replace Exterior Drinking Fountain; ADA Accessible L.F. Ea Ea Ea Ea L.F. S.F. Ea C.S.F L.F. Ea Ea Ea Ea Ea Ea Dayton Port Main Building Lobby Main Building Men’s Room Main Building Women’s Room Dayton Port Total $8,497 Toilet Partitions Replace toilet partitions Damaged 3 Ea $16,994 $27,293 Toilet Partitions Replace toilet partitions Damaged 6 Ea Des Moines River Site Features Site Features North Picnic Shelter NW Picnic Shelter South Picnic Shelter $2,705 $2,291 $3,351 $3,351 $3,351 Pedestrian Paving Water Supply Slab on Grade Slab on Grade Slab on Grade Replace Concrete Sidewalk 4" Thick (SF) Missing Inadequate Damaged Damaged Damaged Replace Exterior Drinking Fountain; ADA Accessible Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished 250 1 5 5 5 S.F. Ea C.S.F C.S.F C.S.F P a g e | 33 Main Building Main Building Main Building Main Building Main Building Des Moines River Total $4,199 $749 $2,880 $2,601 $30,828 Exterior Doors Fittings Plumbing Fixtures Plumbing Fixtures Special Purpose Room Replace 3'-0" x 7'-0" aluminum door, incl. vision Install mirror at accessible height. Provide protective insulation for exposed piping Replace drinking fountain Remove one fixture and create accessible stall. Beyond Useful Life Missing Inadequate Inadequate Inadequate 2 2 8 1 2 2 1 12 5 2 3 910 Ea Ea L.F. Ea Ea Ea L.F. Ea L.F. L.F. S.F. Ea $56,306 Dresbach TIC Site Features Main Building Main Building Main Building Main Building Auto Parking Auto Parking Dresbach TIC Total $4,581 $1,624 $2,033 $13,004 $30,828 $641 $3,655 $56,366 Water Supply Fittings Fittings Plumbing Fixtures Special Purpose Room Parking Lots Parking Lots Replace Exterior Drinking Fountain; ADA Accessible Realign and Re-stripe Parking Space for ADA Access Inadequate Inadequate Missing Inadequate Inadequate Inadequate Inadequate Elm Creek Site Features Patio Terrace Patio Terrace Main Building Main Building Elm Creek Total $10,486 $6,524 $2,724 $34,880 $2,673 $57,287 Pedestrian Paving Brick and Tile Plazas Brick and Tile Plazas Slab on Grade Exterior Doors Replace Concrete Curb Cut with ADA Curb Cut Remove and replace asphalt sidewalk, 4' wide Replace expansion joints in concrete pavement Mud jack floor slab. Repair aluminum frame and door Inadequate Damaged Damaged Failing Inadequate 5 10 50 500 2 Enfield Site Features Site Features Main Building Main Building Main Building Enfield Total $12,584 $138 $15,279 $1,498 $1,802 $31,301 Pedestrian Paving Water Supply Exterior Doors Fittings Communications & Security Replace Concrete Curb Cut with ADA Curb Cut Inadequate Inadequate Missing Inadequate Inadequate 6 1 2 4 1 Enterprise Site Features Site Features Main Building Auto Parking $2,705 $2,291 $30,828 $214 Pedestrian Paving Water Supply Special Purpose Room Parking Lots Replace Concrete Sidewalk 4" Thick (SF) Missing Inadequate Inadequate Inadequate 250 1 2 1 July 21, 2010 Ea Ea Ea Ea Ea Toilet partitions laminate clad-overhead braced Install grab bars in accessible stall. Replace drinking fountain Remove one fixture and create accessible stall. Install ADA "Van Accessible" Parking Sign Replace Exterior faucet handle with ADA lever type Automatic door opener on existing door Install mirror at accessible height. Replace public telephone Replace Exterior Drinking Fountain; ADA Accessible Remove one fixture and create accessible stall. Install ADA "Van Accessible" Parking Sign Ea Ea Ea Ea Ea S.F. Ea Ea Ea P a g e | 34 Enterprise Total $36,038 Fishers Landing Site Features Main Building Main Building Main Building Main Building Main Building $1,568 $7,639 $749 $1,186 $406 $24,395 Pedestrian Paving Exterior Doors Fittings Fittings Fittings Floor Finishes Replace Concrete Curb Cut with ADA Curb Cut Automatic door opener on existing door Install mirror at accessible height. Install grab bars in accessible stall. Replace accessible restroom signage. Replace quarry tile floor Inadequate Missing Missing Missing Inadequate Damaged 1 1 2 7 2 800 Ea Ea Ea L.F. Ea S.F. $720 $4,270 $51,705 Plumbing Fixtures Fixed Furnishings Special Purpose Room Provide protective insulation for exposed piping Provide accessible service counter Construct Single-User Toilet Room Inadequate Inadequate Missing 2 14 1 Ea L.F. Ea Site Development Exterior Doors Identifying/ Visual Aid Specialties Communications & Security Replace Concrete Sidewalk 4" Thick (SF) Automatic door opener on existing door 250 2 S.F. Ea Renew System Replace public telephone Missing Missing Beyond Useful Life Inadequate Repair aluminum storefront door Main Building Main Building Main Building Fishers Landing Total $92,638 Forest Lake Site Features Main Building $5,704 $15,379 Main Building Main Building Lobby Forest Lake Total $3,105 $1,802 $25,890 Frazee Main Building Frazee Total $1,650 $1,650 Exterior Doors Fuller Lake Site Features Main Building $138 $7,639 Water Supply Exterior Doors Replace Exterior faucet handle with ADA lever type Exterior Doors Fittings Fittings Floor Finishes Plumbing Fixtures Special Purpose Room Replace 3'-0" x 7'-0" aluminum door, incl. vision Install mirror at accessible height Replace accessible restroom signage Replace quarry tile floor Provide protective insulation for exposed piping Remove one fixture and create accessible stall. Main Building Main Building Main Building Main Building Main Building Main Building Fuller Lake Total $15,709 $899 $406 $2,439 $720 $30,828 $58,778 Automatic door opener on existing door 1 1 Ea Ea Damaged 3 Ea Inadequate Missing Beyond Useful Life Missing Inadequate Damaged Missing Inadequate 1 1 Ea Ea 2 2 2 80 2 2 Ea Ea Ea S.F. Ea Ea P a g e | 35 General Andrews Site Features Site Features Auto Parking Auto Parking General Andrews Total Goose Creek Site Features Site Features Main Building Main Building Main Building Lobby Auto Parking Auto Parking Goose Creek Total Gooseberry Falls Site Features Main Building Auto Parking Gooseberry Falls Total Hansel Lake Site Features Main Building Main Building Main Building Main Building Main Building Main Building Main Building. Main Building Main Building Hansel Lake Total Hayward July 21, 2010 $6,292 $275 $2,413 $2,204 Pedestrian Paving Water Supply Parking Lots Parking Lots Replace Concrete Curb Cut with ADA Curb Cut Inadequate Inadequate Inadequate Missing 3 2 800 3 Ea Ea L.F. Ea Pedestrian Paving Pedestrian Paving Exterior Doors Identifying/ Visual Aid Specialties Communications & Security Parking Lots Parking Lots Replace Concrete Curb Cut with ADA Curb Cut Remove and replace concrete sidewalk, 4' wide Automatic door opener on existing door Inadequate Inadequate Inadequate Beyond Useful Life Inadequate Inadequate Inadequate 3 150 1 Ea L.F. Ea 1 1 1 264 Ea Ea Ea L.F. Water Supply Slab on Grade Parking Lots Replace Exterior Drinking Fountain; ADA Accessible Re-Align & Re-stripe Parking Space for ADA Access Inadequate Damaged Inadequate 1 12 1120 Ea L.F. L.F. Pedestrian Paving Exterior Doors Exterior Doors Fittings Fittings Fittings Fittings Plumbing Fixtures Communications & Security Special Purpose Room Replace Concrete Sidewalk 4" Thick (SF) Replace 3'-0" x 7'-0" aluminum storefront doors Automatic door opener on existing door Install grab bars in accessible stall. Replace accessible restroom signage. Install grab bars in accessible stall. Install mirror at accessible height. Replace drinking fountain Replace public telephone Remove one fixture and create accessible stall. Inadequate Damaged Missing Missing Inadequate Missing Missing Inadequate Inadequate Inadequate 200 2 1 12 4 12 2 1 1 2 S.F. Ea Ea L.F. Ea L.F. Ea Ea Ea Ea Replace Exterior faucet handle with ADA lever type Re-Align & Re-stripe Parking Space for ADA Access Replace Metal Reserved Parking Sign and Post $11,184 $4,704 $6,086 $7,639 $2,155 $1,802 $214 $1,060 $23,660 $3,217 $730 $3,956 Renew System Replace public telephone Install ADA "Van Accessible" Parking Sign Realign & Re-stripe Parking Space for ADA Access Remove and replace concrete sidewalk, 4' wide $7,906 $2,164 $5,231 $7,639 $2,033 $812 $2,033 $749 $2,601 $1,802 $30,828 $55,892 P a g e | 36 Site Features East Picnic Shelter West Picnic Shelter Main Building Main Building Auto Parking Hayward Total $413 $507 $507 $5,665 $51,705 $214 $59,011 Water Supply Site Earthwork Site Earthwork Fittings Special Purpose Room Parking Lots Replace Exterior faucet handle with ADA lever type Remove & Replace Concrete Sidewalk, 4' wide Remove & Replace Concrete Sidewalk, 4' wide Replace toilet partitions Construct Single-User Toilet Room Install ADA "Van Accessible" Parking Sign Inadequate Damaged Damaged Inadequate Missing Inadequate 3 10 10 2 1 1 Ea L.F. L.F. Ea Ea Ea Heath Creek North Picnic Shelter Main Building Heath Creek Total $10,052 $609 $10,661 Slab on Grade Fittings Replace unfinished concrete floor unfinished Replace accessible restroom signage. Damaged Inadequate 15 3 C.S.F. Ea High Forest Site Features Site Features Main Building High Forest Total $2,705 $4,581 $30,828 $38,114 Pedestrian Paving Water Supply Special Purpose Room Replace Concrete Sidewalk 4" Thick (SF) Missing Inadequate Inadequate 250 2 2 S.F. Ea Ea Kettle River Site Features Auto Parking Auto Parking Kettle River Total $8,389 $2,204 $2,413 $13,006 Pedestrian Paving Parking Lots Parking Lots Replace Concrete Curb Cut with ADA Curb Cut Replace Metal Reserved Parking Sign and Post Inadequate Missing Missing 4 3 800 Ea Ea L.F. Lake Iverson Site Features Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Lake Iverson Total $6,872 $5,231 $7,639 $749 $25,492 $812 $2,033 $2,601 $1,802 $30,828 $84,059 Water Supply Exterior Doors Exterior Doors Fittings Fittings Fittings Fittings Plumbing Fixtures Communications & Security Special Purpose Room Replace Exterior Drinking Fountain; ADA Accessible Replace 3'-0" x 7'-0" aluminum storefront doors Automatic door opener on existing door Install mirror at accessible height. Replace toilet partitions Replace accessible restroom signage Install grab bars in accessible stall. Replace drinking fountain Replace public telephone Remove one fixture and create accessible stall. Inadequate Damaged Missing Missing Damaged Inadequate Missing Inadequate Inadequate Inadequate 3 2 1 2 9 4 12 1 1 2 Ea Ea Ea Ea Ea Ea L.F. Ea Ea Ea Lake Latoka Picnic Shelter East $2,029 Site Earthwork Remove and replace concrete sidewalk, 4' wide Damaged 50 L.F. Replace Exterior Drinking Fountain; ADA Accessible Remove one fixture and create accessible stall. Realign & Re-stripe Parking Space for ADA Access P a g e | 37 Picnic Shelter West Main Building Lake Latoka Total $2,029 $1,802 $5,860 Site Earthwork Communications & Security Remove and replace concrete sidewalk, 4' wide Replace public telephone Damaged Inadequate 50 1 L.F. Ea Lake Pepin Site Features North Picnic Shelter South Picnic Shelter Auto Parking Lake Pepin Total $6,086 $1,420 $923 $1,060 $9,489 Pedestrian Paving Slab on Grade Slab on Grade Parking Lots Remove and replace concrete sidewalk, 4' wide Remove and replace concrete sidewalk, 4' wide Remove and replace concrete sidewalk, 4' wide Inadequate Inadequate Inadequate Missing 150 35 35 264 L.F. L.F. L.F. L.F. Middle Spunk Main Building Main Building Main Building Main Building Main Building Main Building Site Features Site Features Auto Parking Middle Spunk Total $1,435 $812 $2,033 $749 $1,802 $51,705 $4,704 $2,434 $607 $66,281 Exterior Doors Fittings Fittings Fittings Communications & Security Special Purpose Room Pedestrian Paving Pedestrian Paving Parking Lots Repair aluminum door Replace accessible restroom signage. Install grab bars in accessible stall. Install mirror at accessible height. Replace public telephone Construct Single-User Toilet Room Replace Concrete Curb Cut with ADA Curb Cut Remove and replace concrete sidewalk, 4' wide Damaged Inadequate Missing Missing Inadequate Missing Inadequate Inadequate Inadequate 2 4 12 2 1 1 3 60 100 Ea Ea L.F. Ea Ea Ea Ea L.F. L.F. MN Valley Main Building Main Building Main Building Main Building Main Building Main Building Main Building Site Features Auto Parking MN Valley Total $15,279 $812 $1,017 $749 $2,880 $1,802 $30,828 $4,581 $214 $58,162 Interior Doors Fittings Fittings Fittings Plumbing Fixtures Communications & Security Special Purpose Room Water Supply Parking Lots Automatic door opener on existing door Replace accessible restroom signage. Install grab bars in accessible stall. Install mirror at accessible height. Provide protective insulation for exposed piping. Replace public telephone Remove one fixture and create accessible stall. Install ADA "Van Accessible" Parking Sign Inadequate Inadequate Missing Missing Missing Inadequate Inadequate Inadequate Inadequate 2 4 6 2 8 1 2 2 1 Ea Ea L.F Ea Ea Ea Ea Ea Ea Moorhead Site Features Moorhead Total $1,845 $1,845 Pedestrian Paving Replace Concrete Curb Cut with ADA Curb Cut Inadequate 1 Ea New Market July 21, 2010 Realign and Re-stripe Parking Space for ADA Access Realign and Re-stripe Parking Space for ADA Access Replace Exterior Drinking Fountain; ADA Accessible P a g e | 38 Main Building Site Features Site Features West Picnic Shelter New Market Total $609 $3,275 $138 $10,052 $14,074 Fittings Pedestrian Paving Water Supply Slab on Grade Replace accessible restroom signage. Replace Concrete Curb Cut with ADA Curb Cut Oak Lake Main Building Main Building Main Building Main Building Main Building Main Building Main Building Site Features East Picnic Shelter Oak Lake Total $7,639 $406 $749 $1,186 $2,439 $720 $30,828 $3,136 $811 $47,914 $863 $1,802 $51,705 $4,367 Oakland Woods Main Building Main Building Main Building Site Features Oakland Woods Total Replace unfinished concrete floor unfinished Inadequate Inadequate Inadequate Damaged 3 3 1 15 Ea Ea Ea C.S.F. Exterior Doors Fittings Fittings Fittings Floor Finishes Plumbing Fixtures Special Purpose Room Pedestrian Paving Slab on Grade Automatic door opener on existing door Replace accessible restroom signage Install mirror at accessible height. Install grab bars in accessible stall. Replace quarry tile floor Provide protective insulation for exposed piping Remove one fixture and create accessible stall. Replace Concrete Curb Cut with ADA Curb Cut Remove and replace concrete sidewalk, 4' wide Missing Inadequate Missing Missing Damaged Missing Inadequate Inadequate Damaged 1 2 2 7 80 2 2 2 10 Ea Ea Ea L.F S.F. Ea Ea Ea L.F. Exterior Doors Communications & Security Special Purpose Room Pedestrian Paving Repair aluminum door Replace public telephone Construct Single-User Toilet Room Replace Concrete Curb Cut with ADA Curb Cut Damaged Inadequate Missing Inadequate 2 1 1 4 Ea Ea Ea Ea Renew System 1 Ea 1 2 1 Ea Ea Ea Replace Exterior faucet handle with ADA lever type $58,737 Rum River Main Building $2,339 Identifying/ Specialties Main Building Main Building Main Building Main Building Men’s Room Main Building Women’s Room Main Building Women’s Room Site Features $1,042 $1,435 $7,639 Cabinets & Counters Exterior Doors Exterior Doors Renew System Repair aluminum door Automatic door opener on existing door Beyond Useful Life Beyond Useful Life Damaged Inadequate $5,665 Toilet Partitions Replace toilet partitions Damaged 2 Ea $11,330 Toilet Partitions Replace toilet partitions Damaged 4 Ea Plumbing Fixtures Pedestrian Paving Replace lavatory vitreous china Replace Concrete Curb Cut with ADA Curb Cut Inadequate Inadequate 8 3 Ea Ea $6,479 $6,292 Visual Aid P a g e | 39 Site Features Rum River Total $4,057 $46,278 Pedestrian Paving Remove and replace concrete sidewalk, 4' wide Missing St. Croix TIC Main Building Site Features St. Croix TIC Total $1,435 $10,486 $11,921 Exterior Doors Pedestrian Paving Repair aluminum door Replace Concrete Curb Cut with ADA Curb Cut Damaged Inadequate 2 3 $406 $6,779 $30,828 $4,581 $6,006 $8,828 $3,483 Fittings Communications & Security Special Purpose Room Water Supply Slab on Grade Slab on Grade Slab on Grade Replace accessible restroom signage Replace fire alarm control panel Remove one fixture and create accessible stall. Inadequate Inadequate Inadequate Inadequate Damaged Damaged Damaged 2 1 2 2 10 10 10 Ea Ea Ea Ea C.S.F C.S.F L.F Fittings Plumbing Fixtures Water Supply Slab on Grade Slab on Grade Replace accessible restroom signage Replace drinking fountain Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Inadequate Inadequate Inadequate Damaged Damaged 2 1 1 5 10 Ea Ea Ea C.S.F C.S.F Fittings Plumbing Fixtures Communications & Security Special Purpose Room Pedestrian Paving Parking Lots Install grab bars in accessible stall Replace drinking fountain Replace public telephone Remove one fixture and create accessible stall. Replace Concrete Curb Cut with ADA Curb Cut Install ADA "Van Accessible" Parking Sign Missing Inadequate Inadequate Inadequate Missing Inadequate 80 1 1 2 1 1 L.F. Ea Ea Ea Ea Ea Fittings Fittings Replace accessible restroom signage. Install mirror at accessible height. Inadequate Missing 4 2 Ea Ea Straight River NB Main Building Main Building Main Building Main Building East Picnic Shelter West Picnic Shelter West Picnic Shelter Straight River NB Total $12,154 Thompson Hill Main Building Main Building Main Building Main Building Site Features Auto Parking Thompson Hill Total $13,556 $2,601 $1,802 $30,828 $2,097 $214 $51,098 July 21, 2010 Replace unfinished concrete floor unfinished Replace unfinished concrete floor unfinished Remove and replace concrete sidewalk, 4' wide L.F. Ea Ea $60,911 Straight River SB Main Building Main Building Site Features East Picnic Shelter West Picnic Shelter Straight River SB Total Watonwan Main Building Main Building Replace Exterior Drinking Fountain; ADA Accessible 100 $406 $2,601 $138 $3,003 $6,006 $812 $749 Replace Exterior faucet handle with ADA lever type P a g e | 40 Main Building Site Features Site Features Auto Parking Watonwan Total $51,705 $1,092 $3,289 $214 $57,861 Special Purpose Room Pedestrian Paving Water Supply Parking Lots Construct Single-User Toilet Room Replace Concrete Curb Cut with ADA Curb Cut Install Domestic Water Faucet Piping and Drain Install ADA "Van Accessible" Parking Sign Missing Missing Missing Inadequate 1 1 1 1 Ea Ea Ea Ea $431 $2,033 $749 $3,660 $812 $25,492 $1,073 $3,604 $51,705 $4,581 $214 Exterior Doors Fittings Fittings Fittings Fittings Fittings Plumbing Fixtures Communications & Security Special Purpose Room Water Supply Parking Lots Repair aluminum door Install grab bars in accessible stall Install mirror at accessible height. Provide accessible service counter Replace accessible restroom signage Replace toilet partitions Provide protective insulation for exposed piping Replace public telephone Construct Single-User Toilet Room Damaged Missing Missing Inadequate Inadequate Damaged Missing Inadequate Missing Inadequate Inadequate 1 12 2 12 4 9 8 2 1 2 1 Ea L.F. Ea L.F. Ea Ea Ea Ea Ea Ea Ea Worthington TIC Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Main Building Site Features Auto Parking Worthington Total TIC $94,354 Grand Total $1,942,175 Note: The following Rest Areas have no ADA Deficiencies: Brainerd Lakes Welcome Center, Albert Lea TIC, and Marion Rest Area Replace Exterior Drinking Fountain; ADA Accessible Install ADA "Van Accessible" Parking Sign P a g e | 41 Appendix E Statewide Accessible Pedestrian Signal (APS) Prioritization Summary District 1 Trunk Highway Intersection 2 CSAH 62, W JCT (BN RR PRE-EMPT) 2 CSAH 62, E JCT (SPAN WIRE) 2 MIDWAY RD (CSAH 13) 2 BOUNDARY AVE 2 CSAH 63 (BN RR PRE-EMPT) 2 TH 38 (3rd AVE) 2 1st AVE NW 2 TH 169-W JCT (POKEGAMA AVE) 2 1st AVE NE 2 TH 169 - E JCT (6th AVE NE) 2 7th AVE NE (BN RR PRE-EMPT) 2 2nd ST (CSAH 11) 11 KEENAN DRIVE / VALLEY PINE CR 11 SHOREWOOD DRIVE 11 11th ST 11 6th AVE W 11 3rd AVE W (& TH 71 - E JCT) 23 W RAMP TERMINALS I-35 33 GILLETTE AVE (WAL-MART) 33 DODDRIDGE AVE 33 CARLTON AVE 33 CLOQUET AVE 33 NORTH RD & FREEMAN RD 38 (I.e.- 3rd AVE) & 14th ST NW 48 E RAMP TERMINALS I-35 48 WEBER AVE 48 CR134/140 (MORRIS AVE) 48 LADY LUCK DR (GRAND CASIO ENT) July 21, 2010 APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks Intersection Score 3 80 0 0 0 0 4 106 0 0 4 101 4 86 4 94 4 87 3 79 4 95 4 91 3 87 1 38 3 62 4 89 4 86 3 66 0 0 4 114 2 69 2 60 4 118 4 79 3 84 2 46 2 40 0 0 P a g e | 42 Trunk Highway Intersection 53 I-35 OFF RAMP (22nd AVE W) 53 HAINES RD 53 MALL DRIVE (WAL-MART) 53 ARROWHEAD RD 53 STEBNER RD 53 CIRRUS & SUGAR MAPLE DR 53 LAVAQUE RD 53 UGSTAD RD 53 CSAH 13 (MIDWAY RD) 53 PARK/GRANT AVES 53 17th ST 53 11th ST 53 7th ST 53 TH 11 (4th ST) 53 CSAH 23 (CN-DWP RR PRE-EMPT) 53 12th AVE W 53 13th ST S 53 TH 169 (WEST RAMP TERMINALS) 53 TH 169 (EAST RAMP TERMINALS) 53 CSAH 135 - N JCT & CSAH 102 61 CSAH 10 (BROADWAY AVE) 61 OUTER DRIVE 61 CSAH 11 CONN (SA ENT) 61 CSAH 26 (SUPER ONE) 61 7th AVE 61 6th AVE 61 4th AVE (CSAH 2) 73 TH 73/LAKE ST & 3rd AVE NW 73 CSAH 61 73 TH 27(E JCT) 169 CENTRAL AVE 169 1st AVE E 169 3rd AVE E 169 29th ST S 169 25th ST S APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks Intersection Score 0 0 2 69 0 0 3 108 0 0 0 0 0 0 0 0 3 91 3 73 4 74 4 75 4 69 4 69 2 48 4 106 4 125 1 31 1 20 2 56 4 72 3 66 3 76 4 76 4 51 4 67 4 62 4 47 0 0 4 95 4 58 4 61 4 61 2 62 3 77 P a g e | 43 Trunk Highway Intersection 169 21st ST S (TARGET) 169 13th ST SE 169 10th ST SE (CSAH 23) 169 1st ST SE (CSAH 3 - RIVER RD) 169 2nd ST N 169 3rd ST N 169 8th AVE NE 169 13th AVE NE 169 TH 73 (W JCT) WAL-MART 169 LOWES & IRON GATE MALL 169 9th AVE W (NEWBURG RD) 169 TH 37 (40th ST) 169 37th ST 169 25th ST (CSAH 63) 169 23rd ST 169 HOWARD ST (CSAH 73 - N JCT) 169 CSAH 7 (ENTERPRISE DR) 194 CSAH 13 (MIDWAY RD) 210 BLACK BEAR CASINO July 21, 2010 APS Status None None None None None None None None None None None None None None None None None None None Number of Crosswalks Intersection Score 4 104 4 82 4 107 4 78 4 95 4 77 4 90 4 79 3 89 3 90 1 35 4 105 2 72 3 81 3 80 3 90 3 80 0 0 2 69 P a g e | 44 District 2 Trunk Highway 2 2 2 2 2 2 2 2 2 2 2 2 11 11 11 11 32 32 32 34 34 34 34 59 59 59 59 59 71 71 89 197 197 197 197 71 Intersection TH 92 CSAH 11/MOBERG GRANT UTLEY TH 371 ASH ST. BROADWAY MAIN FISHER AVE. 2ND ST. 5TH AVE. NE TH 220 JOHNSON AVE. MAIN ST. TH 89 LAKE ST. TH 313 1ST ST. 2ND ST. T.H. 1 / 8TH ST. CENTRAL AVE. CSAH 6 MAIN ST. TH 71 TH 32 ATLANTIC LABREE 1ST ST. ANTHONY ANNE STREET S. JCT. TH 2 6TH STREET TH 71 MIDDLE SCHOOL RD HANNAH AVE. MALL ENTRANCE ANNE STREET APS Status None None Installed (A,B,C) None None None None None None None None None None None None None Installed (A,B,C,D) Installed (A,B,C,D) None None None None None Installed (A,B,C,D) None Installed (A,B,C,D) None None None None None None None None None None Number of Crosswalks 4 2 3 3 4 4 4 4 4 0 4 4 4 4 3 2 4 4 4 4 4 4 4 4 4 4 4 4 2 0 4 0 1 1 4 2 Intersection Score 84 63 74 82 94 89 88 121 61 0 103 79 61 83 70 51 70 69 89 93 101 103 110 86 81 66 113 112 50 0 97 0 36 42 81 50 P a g e | 45 Trunk Highway 197 197 197 197 197 197 197 197 197 197 220 371 371 371 1ST ST 1ST ST 1ST ST 2B 2ND ST. 2ND ST. 2ND ST. 4TH ST. CSAH 15 CSAH 7 IRVINE AVE. July 21, 2010 Intersection RIDGEWAY IRVINE AVE. 23RD ST. 15TH ST. 10TH ST. 5TH ST. 3RD ST. 2ND ST. 1ST ST. CSAH 50/P.B. DRIVE 14TH ST. T.H. 200 5TH ST. TH 34 3RD AVE. LABREE PENNINGTON 2ND ST. NE BROADWAY MAIN DEMERS DEMERS ANNE STREET HIGH SCHOOL 5TH ST. APS Status Installed (A,B,C,D) None None Installed (A,B,C,D) Installed (A,B,C,D) Installed (A,C,D) Installed (A,B,C,D) None None None None None None None None Installed (A,B,C,D) None None None None None None None None None Number of Crosswalks 4 4 4 4 4 3 4 4 4 2 4 0 4 2 4 4 2 2 4 4 4 4 4 2 4 Intersection Score 65 101 89 71 59 60 52 83 113 63 106 0 85 51 77 64 35 40 91 112 80 71 89 49 93 P a g e | 46 District 3 Trunk Highway 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 12 12 12 12 12 12 15 15 15 15 15 15 15 Intersection Liberty La. Rolling Ridge <CR81> & (17) 25 E Jct. Lake St (5) Eagle Lake Rd. CR 43 24 (6) Center St. Waco St NW Joplin Ave. - 185th Ave. <44>Upland Ave. (1) Proctor Ave. Jackson Ave. Main St. (2) (12) (21) -26 E. St. Germain St. (7) 15th Ave. S.E. (11) 2.5 Mi E of Becker 27 East Ramp 27 West Ramp (43 / 42) 4th St. (10=2 Ave.) TH 10/TH 210 (6th St.) 71 Jefferson St. Master (20) / (50) (3) Bdwy (12=Cokato St) (30) Bridge Ave. -30 Tiger Drive <139> County Line Rd. 25/(12) Buffalo Ave. S. W. Jct. CSAH 47 Lt/CR 136 Rt 23/2nd St. S.JCT 23/75 (23=Division)N.JCT <135> 3rd St. No (4) 8th St. N. 12th St. N. (120) 20th St. N.(was CR 134) APS Status None None None None None None None None None None None None None None None None None None None None None None None None Installed (A,B,C,D) Installed (C,D) Installed (A,B,C,D) None None None None None None None None None Number of Crosswalks 1 0 4 4 3 4 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 4 4 0 4 4 4 1 2 4 Intersection Score 41 0 82 119 85 127 97 150 100 103 107 104 105 114 110 116 130 118 102 51 120 107 93 94 119 60 108 114 91 0 108 137 90 33 66 133 P a g e | 47 Trunk Highway 15 15 15 15 18 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 24 24 25 25 25 25 July 21, 2010 Intersection -1 -29 CSAH 33 (Benton) 18th St N TH 25 Mi. E. of Brainerd (2) Red River Ave. Chapel Street TH25- .9 Mi. W of Foley (36) Old US 169/Central 95 (8) 65 N Jct. (6) Forest Ave. 65 S Jct. 1.3 Mi S of Mora Washburn Ave. (23=Hoffman) CSAH 71 Lt/CR 67 Rt 33rd Ave. (23=Division St.) 29th Ave. (23=Division St.) 25th Ave. (23=Division St.) 22nd Ave. (23=Division St.) Cooper Ave Memorial Dr. (23=Division St.) 14th Ave. S. (23=Division St. ) 12th Ave. S. (23=Division St.) 7th Ave. S. (23=Division St. ) 5th Ave. S. (23=Division St. ) Wilson Ave. (23=Division St.) Lincoln Ave. 14th Ave. SE CSAH 1 28TH AVE S. 10th Ave. S. 6th Ave. S. (23=2nd St. S.) <135> 2nd Ave. (23=2nd St.) Waite Ave (23=2nd St S) -75 -8 5TH Street NE -35 55 (25=Central Ave) Wal-Mart/High School Entrance APS Status None None None Installed (C,D) None None None None None None None None Installed (A,B,C,D) None None None None None None To Be Installed To Be Installed To Be Installed To Be Installed To Be Installed To Be Installed None None None None None None None None None None None None None None Number of Crosswalks 4 4 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 1 4 4 4 4 4 4 3 4 4 4 4 4 4 4 4 4 4 Intersection Score 117 94 72 55 137 80 107 114 73 153 87 105 73 93 110 107 108 97 120 132 131 50 131 130 115 116 120 113 80 110 96 106 122 141 100 104 94 149 111 P a g e | 48 Trunk Highway 25 25 25 25 25 25 25 25 25 25 27 27 27 27 27 27 55 55 55 55 55 55 55 55 65 65 65 65 71 71 71 71 71 94 94 94 94 94 94 Intersection School Blvd Chelsea Road (94) WB Ramp <117> Oakwood Dr.(94ebrmp) (58) 7th St. (75) Broadway (25=Pine) River St. (25=Pine St.) (11) / (14) (37) Forest City Rd NE 210 (25=Mill Ave./8th Ave. NE) 2nd St. NW/ (52) Lindb Dr. 1st St. SE (27=Broadway) 1st St. SE @ 1st Ave. SE 4th St. NE 11th St. NE Wal Mart Entrance (5) /Excelsior Avenue 3rd Ave NE <114> -35 1st St. NE 3rd St So./2nd St. So. -34 -134 (8) Parkdale (55=Oak) (30) /<43> Main St. 95 W Ramp 95 E Ramp -5 <186> 12th St S (17) Sinclair Lewis Ave (38) 2nd Ave. SE 29 Colfax (71=Jefferson) Bryant (71=Jefferson) 94 WB OFF RAMP/(37) 24 North Ramp 24 South Ramp EB RAMP CSAH 18 WB RAMP CSAH 18 241 (36) 94WBRMP APS Status None None None None None None None None None None Installed (A,B,C,D) None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 2 1 4 Intersection Score 114 109 50 96 89 79 86 110 110 136 95 86 65 67 102 114 115 82 89 84 86 52 60 94 133 87 83 113 97 91 93 79 76 89 94 92 74 41 83 P a g e | 49 Trunk Highway 95 95 95 95 95 95 95 95 169 169 169 169 169 169 169 169 210 210 210 210 210 210 210 210 210 210 210 241 241 241 241 241 371 371 371 371 371 371 371 July 21, 2010 Intersection Fern St/1st Ave. W 293 Dellwood (95=1st St) (30) Main St 95=1st Ave. (27) Buchanan St. Garfield St. (34) Xylite St. NE Flanders St. (29) Rum River 10 North Ramp (12) Main St./Nowthen Rd. School St./Elk Hills Dr. Jackson Ave./193rd 197th Ave. NW (4) Fremont Ave 210 S. Jct. Minn Ave. - 2nd St. Grand Casino Ent. (48) Highland Senic Dr. Knollwood Dr. 371 W. Jct. Golf Course Rd. Delmont Rd./Westgate Ent. (20) 4th St. NW 210=Wash N 4th St. (210=371=Wash) 371 E. Jct. Wash/& 6th 18 8th St. 210=Washington (5) 13th St/Gillis Ave. 4th Ave. NE Edgewood St. (19) (35) Main St. Nabor Ave 4TH ST NE Larabee Ave NE <160> Excelsior Rd. (48) Highland Scenic Dr. College Rd./Glory Rd. Woida Road (77)/(49) Buffalo Hills Ln. Quince St. (371=S 6th) APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 4 4 4 4 4 4 0 4 3 4 3 4 4 2 3 4 4 4 4 4 4 3 4 4 2 4 4 2 4 4 4 4 4 4 4 4 4 Intersection Score 89 74 97 79 101 105 105 91 0 126 83 125 87 93 85 59 71 119 105 125 103 102 92 84 96 102 61 114 138 54 125 128 107 130 132 124 119 116 80 P a g e | 50 Trunk Highway 371 371 371 371 371 371 371 CSAH 75 Intersection Laurel St. (371=S 6th) 371 S. 6th St. (322=Oak St.) (77) / (13) (18) Hazelwood Dr. (11) Main St. 84 Mill St. (16) Myers Rd CSAH 18/39 APS Status None None None None None None None None Number of Crosswalks 4 4 4 4 4 4 4 1 Intersection Score 80 99 117 106 75 78 110 41 P a g e | 51 District 4 Trunk Highway 9 9 9/ 59 10 10 10 10 10 10 10 10 10 10 27 28 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 34 59 59 59 59 July 21, 2010 Intersection TH 12 (Atlantic Avenue) 7th Street TH 28 (5th Street) Airport Road/Wine Lake Road Kris Street Main Street C.S.A.H 19 (Parke Avenue) and CO. RD. 117 34th Street 32nd Street 1st Avenue N and 21st Street 14th Street 11th Street 8th Street McKay Avenue TH 29 and TH 104 (Franklin Street) Nokomis Street Broadway C.S.A.H. 43/CO. RD. 70 (McKay Avenue) 5th Avenue 6th Avenue 7th Avenue 10th Avenue 15th Avenue 17th Avenue 22nd Avenue 30th Avenue TH 27 (34th Avenue) Dakota Street 50th Avenue Ramps C and D TH 9/TH 12 (Atlantic Avenue) C.S.A.H. 21 (Roosevelt Avenue) TH 34 (Birch Drive) C.S.A.H. 6 TH 108 (1st Avenue) TH 108 (Mill Street) APS Status None None None None None None None None None None None None None None None None Installed (A,B,C,D) None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 4 2 4 4 4 4 4 4 2 4 4 2 4 4 4 2 4 4 4 4 4 2 3 4 4 3 4 3 4 4 3 4 4 4 Intersection Score 92 69 52 52 132 85 87 101 129 140 52 86 106 55 77 93 93 69 55 72 71 87 85 54 76 115 137 73 107 96 113 105 74 105 81 75 P a g e | 52 Trunk Highway 75 75 75 75 75 231 231 231 231 I-94 Intersection 12th Avenue S 20th Avenue S 24th Avenue S 30th Avenue S 40th Avenue S 4th Street 5th Street 6th Street TH 75 (8th Street) 20th Street APS Status None None None None None None None None None None Number of Crosswalks 4 4 4 3 4 4 4 4 4 1 Intersection Score 112 96 121 87 111 94 60 69 83 23 P a g e | 53 Metro Trunk Highway 3 3 3 3 3 3 3 3 3 3 3 3 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 July 21, 2010 Intersection (74) 50 S.JCT. CHPPND-ASH w/ MASTER 50 N. JCT. CHIPPENDALE-ELM CSAH 46/ 160th St. (42) 150TH STREET 145TH ST. W. (3=MAIN AV) CONNEMARA TRAIL MCANDREWS RD CSAH 38 LT/ROSMNT RED PINE LANE (32) CLIFF ROAD w/ MASTER (30) DIFFLEY ROAD 110 ROBERT TRAIL S. RAMP 110 ROBERT TRAIL N. RAMP Oak OAK AVE @ COMMUNITY DR CSAH 32 TH 284 /OLIVE STREET/CO RD 57 CO RD 59 / MAIN ST, WACONIA (11) VICTORIA DR (13) ROLLING ACR Bavaria RD 41/ HAZELTINE BLVD Century GALPIN BLVD AUDUBON (17) POWERS BLVD MARKET BLVD (101) GREAT PLAINS BLVD w/ MASTER DAKOTA AV (101) DELL ROAD (4) EDEN PRAIRIE RD VENTURE LANE / FULLER RD w/MASTER S Ramp & Mitchell Rd N Ramp & Mitchell Rd POST RD/NORTHWEST DR. - WR (68) (34) McKnight -MHAHA STILLWATER & LAKEWOOD 5 S JCT/Stillwater Blvd APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 4 4 4 2 2 2 4 3 0 0 4 3 3 4 3 4 0 4 2 2 2 3 2 2 2 4 4 3 3 3 0 4 4 4 Intersection Score 115 125 112 115 89 62 51 52 112 85 0 0 135 57 120 110 98 93 0 97 81 91 83 81 58 76 76 111 106 87 75 83 0 106 85 121 P a g e | 54 Trunk Highway 5 5 5 5 5 5 5 5 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 13 13 13 13 13 13 13 13 13 13 Intersection GRANADA AVENUE HADLEY AVE w/MASTER IMATION PLACE (13) IDEAL AVE. N. (15) MANNING AVE. N. 58TH ST. N. W/ MASTER 36 NORTH RAMPS 36 SOUTH RAMPS (92) MAIN ST (113) Smithtown Rd TH 41 w/MASTER (19) OAK STREET CHRISTMAS LAKE RD OLD MARKET ROAD VINEHILL RD 101 w/ MASTER WOODLAND/TONKAWOOD RD WILLISTON RD (61) SHADY OAK RD (73) 17TH AV N MASTER 12TH AV N 5TH AV N / Oakridge (20) Blake/Aquila TEXAS AV LOUISIANA AV WOODDALE AV TH 100 @ TH 7 WEST RAMP TH 100 @ TH 7 EAST RAMP (23) FIVE HAWKS AVE. DULUTH Ave / 1st Conn w/ MASTER (21) EAGLE CREEK (44)160TH ST/MAIN AV FISH POINT ROAD South Park Dr/Boudin ST/Com Ave. -42 CONNELLY PKWY (16) MCCOLL w/MASTER 126th ST APS Status None None None None None None None None None None None None None None None None None None None None None None To Be Installed None None None None None None None None None None None None None None Number of Crosswalks 3 4 3 3 2 3 1 1 3 3 2 1 2 1 4 4 4 4 4 4 4 4 4 4 4 4 0 0 2 4 4 2 4 3 3 4 3 Intersection Score 84 143 88 73 63 78 22 27 75 66 69 49 48 30 117 115 94 114 106 120 96 104 139 103 106 112 0 0 56 120 120 71 105 99 94 111 93 None 0 0 P a g e | 55 Trunk Highway 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 21 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 41 41 41 July 21, 2010 Intersection 101 (31) LYNN AV w/ MASTER WASHBURN AV S (DUMP RD) -5 NICOLLET AVE. PORTLAND AVE 12TH AVE S/PARKWOOD DR. (11) W. RIVER HILLS DR. (32) CLIFF ROAD RIVER HILLS DRIVE (30) DIFFLEY/CEDAR SILVER BELL ROAD BLACKHAWK RD (28) YANKEE DOODLE ROAD MENDOTA HEIGHTS RD. (31) PILOT KNOB ROAD 13 w/ MASTER CAB 13 N.B. CONNECTION 282 2ND ST / 21=BROAD (50) HAMLINE AV N. RAMP / MASTER (50) HAMLINE SR/COMMERCE (53) DALE STREET SO. RAMP (53) DALE STREET NO. RAMP / MASTER ENGLISH STREET (68) MCKNIGHT RD S RAMP (68) MCKNIGHT RD N RAMP MARGARET STREET MASTER CAB 120 DIVISION ST HADLEY AVE (36) HILTON TRAIL (17) LAKE ELMO AVE. (15) MANNING AVE WASHINGTON AVE. (68) OAKGREEN / GREELEY (24) (67) OSGOOD AVE. N. (36=95=MAIN) NELSON ST / MASTER (10) 4TH ST Crosstown Blvd / Victoria Dr ENGLER ROAD APS Status None None None None None None None None Installed (A,B,C,D) To Be Installed To Be Installed None None None None None None None Installed (A,B,C,D) None None None None None None None None None None None None Installed (A,B,C) None None None None None None None Number of Crosswalks 2 4 2 4 3 4 4 4 4 4 4 3 3 3 1 3 4 3 4 4 4 2 2 4 1 1 4 4 3 2 0 3 4 4 4 4 4 4 4 Intersection Score 66 128 71 136 98 112 115 118 114 114 126 106 78 100 34 88 106 86 80 111 99 43 53 120 30 29 103 117 75 62 0 77 122 129 114 91 73 96 119 P a g e | 56 Trunk Highway 41 41 41 41 41 41 41 41 47 47 47 47 47 47 47 47 47 47 47 47 47 47 47 47 47 47 47 51 51 51 51 51 51 51 51 51 55 55 55 Intersection CANYON RD M 279 RT/CHASKA US 212 & TH 41 South Ramp US 212 & TH 41 North Ramp HUNDERTMARK Pioneer Trail / Jonathan Blvdl HAZELTINE BLVD CHASKA (18) LYMAN BLVD 82nd Street 37TH AV NE 40TH AV NE 44TH AV NE 49TH AV NE MASTER 53RD AV NE 57TH AV NE 61ST AV NE (6) MISSISSIPPI ST w/ MASTER 69TH AV NE 73RD AV NE (8) OSBORNE RD 81ST AV NE 85th AVE / <132> (3) UNIV AVE (30) PLEASANT (116) Bunker Lake Blvd (5)Nowthen/Xkimo St. SUNWOOD (149th Ave N) Alpine Drive (153rd) MASTER MIDWAY / DAN PATCH (56) HOYT AV (30) LARPENTEUR AV w/Master (114) ROSELAWN AV HAR-MAR MALL ENT. (25) COUNTY ROAD B (23) COUNTY ROAD C MASTER CAB COUNTY ROAD C2 LYDIA AV (20) MAIN ST (50) Rebecca Park Trail w/ MASTER CSAH 92 (DOGWOOD ST) APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Installed (A,B,C,D) Installed (A,B,C,D) None None None None None None Number of Crosswalks 2 1 1 4 4 3 4 2 3 3 3 3 3 4 4 4 4 4 4 4 4 0 4 4 2 4 2 4 3 4 4 4 4 4 4 3 4 4 0 Intersection Score 52 38 28 92 130 73 93 51 81 76 79 88 85 130 115 131 99 130 128 137 121 0 91 123 54 95 66 107 76 120 74 102 116 124 111 85 107 109 0 P a g e | 57 Trunk Highway 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 July 21, 2010 Intersection -19 Willow Dr. (118) ARROWHEAD DR (116) PINTO DR CLYDESDALE CONNECTION (101) W Jct/Sioux Trail (101) E JCT/PEONY LA (24) ROCKFORD RD VICKSBURG LANE NIAGARA LANE FERNBROOK LANE (61) XENIUM LANE INDUSTRIAL PK BLVD -6 (154) W MEDICINE LK (73) S SHORE DRIVE REVERE LANE BOONE AV N (156) WINNETKA AV MASTER RHODE ISLAND AV (40) GLENWOOD AV (102) DOUGLAS DRIVE 55 & TH 100 SINGLEPOINT SCHAPER / OTTAWA MEADOW LANE THEODORE WIRTH PKWY TH.62 North Ramp TH.62 South Ramp MENDOTA HGTS ROAD EAGANDALE BLVD. (43) LEXINGTON/BLUE GENTIA 149 DODD RD N. JCT / MASTER (26) LONE OAK RD 149 DODD RD S. JCT (63) ARGENTA TRAIL GENERAL SIEBEN DRIVE PLEASANT DRIVE WESTVIEW DRIVE RIVER ST. / MASTER APS Status Installed (B,C) None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 2 0 3 3 0 3 3 1 4 4 2 4 3 2 2 2 4 2 3 2 2 3 0 4 4 4 2 2 3 0 3 3 3 3 1 4 4 4 4 Intersection Score 62 0 98 98 0 93 112 38 130 158 74 109 83 62 66 68 134 63 79 64 55 101 0 115 128 115 58 55 78 0 105 84 96 109 34 130 100 93 78 P a g e | 58 Trunk Highway 55 62 62 62 62 62 62 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 Intersection PINE ST. 62@CLEARWATER/BEACH RD MASTER Valley View XERXES AVE (31) N R XERXES AVE (31) S R (35) PORTLAND AV N . RAMP (35) PORTLAND AV. S. RAMP (2) 40TH AV NE 41ST AV NE 44TH AV NE 45TH AV NE 47TH AV NE MASTER CAB (4) 49TH AV NE 50TH AV NE (6) MISSISSIPPI ST w/ MASTER 52ND AV NE 53RD AVE NE (35) MEDTRONIC/OLD CENTRAL E/W MOORE LAKE-RICE CREEK 73RD AV NE (8) OSBORNE RD 81ST AV NE (32) 85TH AV NE/CO. RD J 89TH AV NE 93RD LN NE/CLOV PKWY 99TH AV NE (87) 105TH AV NE w/Master (12) 109TH AV NE 117TH AVE. N.E./ CLOUD DR. 121ST AV NE/PAUL PKWY 242 (14) 129TH AV NE (116) BUNKER LK BLVD ANDOVER BLVD LT 147TH AV/HM LK (60) CONSTANCE BLVD (18) CROSSTOWN BLVD (22) VIKING BLVD (86) / SIMS AV (24)/ 237TH AV N.E. APS Status None None None None None None None Installed (A,B,C,D) None None None None None None None None None None To Be Installed None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 2 1 3 3 3 3 4 4 4 4 2 2 4 4 4 4 3 4 4 4 4 3 3 3 3 4 4 3 0 1 0 3 3 3 2 3 3 3 Intersection Score 74 71 32 66 69 62 72 103 101 98 102 56 48 108 114 102 120 96 107 123 121 143 89 82 83 97 114 145 78 0 54 0 104 91 97 72 100 88 92 P a g e | 59 Trunk Highway 77 77 77 77 77 77 77 95 95 95 95 97 97 97 100 100 100 100 100 100 100 100 100 100 100 100 100 101 101 101 101 101 101 101 101 101 101 101 101 July 21, 2010 Intersection (32)CLIFF RD. - EAST RAMP (32)CLIFF RD. - WEST RAMP (30) DIFFLEY RD E RAMP (30) DIFFLEY RD W RAMP (30) DIFFLEY AT NICOLS w / MASTER (1) OLD SHKPE RD. E. RAMP TH 62 @ TH 77 Bus Lane Only TANGER DR / FLINK AVE. OAKVIEW AVE. (30) FOREST BLVD. MYRTLE ST (95=MAIN ST) EVERTON AV N FENWAY AVENUE NO. GOODVIEW AVE N/ 8TH ST SE W 77TH ST. EAST RAMP W 77TH ST. WEST RAMP W 70TH ST E RAMP W 70TH ST W RAMP w/ MASTER W 50TH ST E RAMP W 50TH ST W RAMP GLENWOOD AV E RAMP MASTER GLENWOOD AV W RAMP TH 100 West Ramp at 36TH AV N TH 100 ER at 36TH Ave N w/ MASTER (152) BROOKLYN BLVD (10) 57TH AV E RAMP (10) 57TH AV W RAMP S JCT (101) "Y" PIONEER TRAIL ( CSAH-14) CHANH LYMAN BLVD CSAH (18) MASTER TH 212 & TH 101 South Ramp TH 212 & TH 101 No. Ramp/Lake Susan Dr (144) 141ST ST (36) East Ramp (37) SB Off Ramp (37) NB Off Ramp (42) RIVER RD NE RAMP (42) River Rd. SW Ramp (39) OTSEGO TWP APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 3 3 3 3 4 4 0 3 4 4 4 1 0 3 2 2 3 3 1 2 2 3 3 3 3 2 3 2 4 4 2 4 3 2 2 2 2 2 2 Intersection Score 75 80 77 74 109 122 0 89 121 76 80 31 0 66 55 67 76 90 33 55 52 73 78 79 87 34 61 56 108 111 62 115 89 60 61 55 44 63 54 P a g e | 60 Trunk Highway 110 110 110 110 120 120 120 120 120 120 120 120 120 120 120 120 120 149 149 149 149 149 149 156 156 156 156 156 156 252 252 252 252 252 252 280 280 610 Intersection (43) LEXINGTON AVE 149 DODD RD w/ MASTER (63) DELAWARE AVE (14) MENDOTA RD/SOUTHVIEW 3M ROAD / MASTER CONWAY AVE 7TH ST (70) 10TH ST N/(34) MINNEHAHA HARVESTER AV/ 15TH ST N (30) LARPENTEUR AV 5 N JCT CENTURY-34TH / MASTER (25) CR "B" SO AV/40TH ST N 7TH AV E/ 47TH ST N JOY RD (19) CO RD D/60TH ST/LG LK MASTER CAB CENTURY COLLEGE ENTRANCE WOODLAND DR. / NO. ENTRANCE WESCOTT RD (73) OPPERMAN/BECKER RD w/ MASTER (28) YANKEE DOODLE ROAD LONE OAK PARKWAY NORTHWEST PKWY/BLUE GENTIA / MASTER MENDOTA HGTS ROAD 156 CONCORD ST N RAMP w/ MASTER VILLAUME AV (156=CONCORD) ARMOUR AV (156=CONCORD) (14) GRAND AVE / JOHN CARROL BLVD WENTWORTH (156=CONCORD) BRYANT AV (156=CONCORD) 66TH AV N 70TH AV N 73RD AV N BROOKDALE DR MASTER 81ST AV / Humboldt Ave 85TH AV (109) Larpenteur Ave. East Ramp w/Master Larpenteur Ave. West Ramp Broadway S Ramp w/ MASTER APS Status None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 4 2 4 2 3 4 4 2 2 4 3 4 4 3 2 3 3 4 4 Intersection Score 104 106 111 51 90 60 70 110 93 58 74 91 74 98 123 64 65 76 108 149 113 None None None To Be Installed None None None None None None None None None None To Be Installed To Be Installed None 4 3 0 4 2 4 2 3 4 2 3 4 4 0 2 2 2 97 84 0 90 61 105 57 62 118 71 109 110 131 0 53 53 57 P a g e | 61 Trunk Highway 610 610 610 610 610 610 610 610 610 610 I35 I35 I35 I35 I35 I35 I35 I35 I35 I35 I35 I35 I35 I35E I35E I35E I35E I35E I35E I35E I35E I35E I35E I35W I35W I35W I35W I35W I35W July 21, 2010 Intersection Broadway N Ramp 97th & W Broadway / Winnetka Noble Pkwy@95th Av N. Zane Ave S Ramp w/ MASTER Zane Ave N RAMP NOBLE AV S RAMP w/MASTER NOBLE AV N RAMP E RIVER RD (1) N RAMP E RIVER RD (1) S RAMP COON RAPIDS BLVD (3) E RAMP 185TH AV/(60) WEST RAMP 50 (5) WEST RAMP 50 (5) EAST RAMP CSAH 46/162ND ST - WEST RAMP CSAH 46/162ND ST - EAST RAMP East Ramp & TH 97 West Ramp & TH 97 (2) BROADWAY AV.W. RAMP (2) BROADWAYAV. E. RAMP / MASTER 61/VIKING - WEST RAMP / MASTER 61/VIKING - EAST RAMP I35 EAST RAMP I35 WEST RAMP / MASTER (11) SOUTH RAMP (11) NORTH RAMP (30) DIFFLEY RD E RAMP (30) DIFFLEY RD W RAMP 110 E RAMP 110 W RAMP (30) LARPENTEUR E RAMP (30) LARPENTEUR W RAMP / MASTER (21) LIT CAN RD E RAMP / MASTER (21) LIT CAN RD W RAMP BURNSVILLE PKWY E RAMP w/ MASTER BURNSVILLE PKWY W RAMP W 106TH ST E RAMP W 94th ST E RAMP W 94TH ST W RAMP MASTER W 90TH ST E RAMP APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None To Be Installed To Be Installed None None None None Number of Crosswalks 2 0 0 3 3 3 3 3 2 1 1 2 2 1 1 0 0 3 3 1 1 3 3 3 3 3 3 1 1 3 3 3 3 3 3 3 3 3 3 Intersection Score 53 0 0 63 58 67 67 102 53 38 22 66 53 31 34 0 0 60 58 38 23 67 58 72 70 74 84 41 30 64 71 71 66 86 85 71 79 86 69 P a g e | 62 Trunk Highway I35W I35W I35W I35W I35W I35W I35W I35W I35W I35W I35W I35W I35W I35W I394 I394 I394 I394 I394 I394 I394 I394 I394 I394 I394 I394 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 Intersection W 90TH ST W RAMP MASTER W 82ND ST. EAST RAMP W 82ND ST. WEST RAMP W 76TH STREET WEST RAMP LYNDALE AV N RAMP LYNDALE AV S RAMP (46) CLEVELAND AV LONG LAKE ROAD COUNTY ROAD D EAST RAMP COUNTY ROAD D WEST RAMP COUNTY ROAD I W RAMP / MASTER COUNTY ROAD I - EAST RAMP COUNTY ROAD J WEST RAMP / MASTER COUNTY ROAD J EAST RAMP PLYMOUTH RD (61) N RAMP PLYMOUTH RD (61) S RAMP w/ MASTER RIDGEDALE DR N RAMP RIDGEDALE DR S RAMP (73) N RAMP (CONTROLLER @ N FR RD) (73) S RAMP S Ramp & General Mills Blvd w/Master N Ramp & General Mills Blvd LOUISIANA AV N RAMP LOUISIANA AV S RAMP XENIA AV/PARK PL NR PARK PL BLVD SR 24TH AV. (MALL OF AMERICA) 12TH AV. NORTH RAMP w/Master 12TH AV. SOUTH RAMP (35) PORTLAND NORTH RAMP (35) PORTLAND SOUTH RAMP NICOLLET AV. NORTH RAMP NICOLLET AV. SOUTH RAMP LYNDALE AV. NORTH RAMP LYNDALE AV. SOUTH RAMP 494 N RAMP w/ MASTER 494 S RAMP 494 N Ramp & Prairie Center Drive 494 N RAMP APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 3 3 3 1 3 3 3 2 3 4 0 1 0 1 1 1 0 1 1 1 2 1 2 2 3 2 2 2 2 3 3 3 3 3 3 0 0 1 2 Intersection Score 70 79 78 29 67 63 73 54 74 110 0 35 0 30 35 31 0 29 33 31 50 41 59 55 81 53 73 46 59 87 73 64 64 77 74 0 0 26 59 P a g e | 63 Trunk Highway I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I494 I694 I694 I694 I694 I694 I694 I694 I694 I694 I694 I694 I694 I694 I694 I94 I94 I94 I94 July 21, 2010 Intersection 494 S RAMP/TECH DR MASTER VALLEY VIEW @ EAST RAMP VALLEY VIEW @ WEST RAMP w/ MASTER I 494 at E RAMP I494 at W RAMP Carlson Pkwy ER w/ MASTER Carlson Pkwy WR 494 E RAMP MASTER 494 W RAMP Tamarack @ west ramp East Ramp & Tamarack LAKE ROAD WEST RAMP LAKE ROAD EAST RAMP w/ MASTER BAILEY ROAD - WEST RAMP BAILEY ROAD - EAST RAMP w/MASTER 156 CONCORD ST S RAMP 149 DODD RD N RAMP 149 DODD RD S RAMP (31) PILOT KNOB N RAMP w/ MASTER (31) PILOT KNOB S RAMP (1) E RIVER RD N RAMP (1) E RIVER RD S RAMP UNIV AV & 694 N RAMP UNIV AV & 694 S RAMP 65 S. RAMP 65 N. RAMP 61 NORTH RAMP 61 SOUTH RAMP w/ MASTER 120 E CO LINE RD N. RAMP 120 E CO LINE RD S. RAMP 5 WEST RAMP (Controller @ EAST RAMP) 5 EAST RAMP (10) 10TH ST. N. WEST RAMP w/ MASTER (10) 10TH ST N. EAST RAMP So. Diamond Lk (49) ROGERS DR MASTER 94 S RAMP 94 N RAMP (30) West Ramp APS Status None None Number of Crosswalks 3 0 Intersection Score 78 0 None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None 0 1 1 2 2 3 3 0 1 2 2 0 2 1 1 1 1 1 1 1 2 2 0 0 3 3 3 3 0 0 2 1 3 0 1 1 0 28 26 69 63 73 75 0 35 59 53 0 50 31 46 30 41 28 41 49 45 27 0 0 65 76 67 72 0 0 53 28 91 0 16 27 P a g e | 64 Trunk Highway I94 I94 I94 I94 I94 I94 I94 I94 I94 I94 I94 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US10 US12 US12 US12 US12 US12 US12 US12 US12 US12 Intersection (30) East Ramp w/ MASTER BOONE AVE 70th St/ N RAMP BOONE AV S RAMP w/ MASTER SHINGLE CRK PKWY N R w/ MASTER SHINGLE CRK PKWY S R (68) MCKNIGHT RD N RAMP (68) MCKNIGHT SR-BURNS W/MASTER 120 CENTURY AVE N RAMP 120 CENTURY AVE S RAMP 95 SOUTH RAMP w/ MASTER 95 NORTH RAMP 171st Ave (83) Armstrong Blvd <56> RAMSEY BLVD <57> Sunfish Blvd & MASTER CAB THURSTON AVE/PARK ST FAIROAK AV 47 FERRY N JCT N RMP w/ MASTER 47 FERRY N JCT S RMP 288(7) 7TH AV N RAMP (7) 7TH AV S RAMP w/ MASTER Hanson Blvd SINGLE-POINT w/MASTER (11)FOLEY/101ST N RAMP MASTER FOLEY BLVD/(11)SR FOLEY BLVD/99TH AVE (3) UNIVERSITY AV S RMP w/ MASTER (3) UNIVERSITY AV N RMP 10 NORTH RAMP (NEW 10) 10 SOUTH RAMP (NEW 10) -96 (83) Halgren Road CSAH 29 (Baker Park RD) CSAH 6/SOUTH RAMP CSAH 6/NORTH RAMP MASTER OLD CRYSTAL BAY RD WILLOW DRIVE w/ MASTER Brown Rd (146) LAKE ST (42) WAYZATA BLVD APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 1 1 2 2 4 2 2 3 3 0 0 3 1 3 1 2 4 3 3 3 3 2 2 1 2 4 3 0 0 4 2 2 1 1 4 3 4 4 0 Intersection Score 26 35 68 58 106 51 59 57 64 0 0 96 35 91 34 61 100 63 78 64 78 96 74 25 53 124 106 0 0 146 62 75 24 33 106 77 108 87 0 P a g e | 65 Trunk Highway US12 US12 US12 US12 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 July 21, 2010 Intersection 101 W JCT N RAMP 101 W JCT S RAMP CARLSON PKWY N Ramp Deer Crk MASTER CARLSON PKWY S Ramp Oakland Rd TH 169 @ CSAH 3 (5) LAREDO ST 282 (9) TH 41 <69> Old Brickyard Rd (17) S RAMP (17) N RAMP w/ MASTER (83) S RAMP (83) N RAMP MASTER River View Road W Ramp 108TH ST E RAMP (1) (1) PIONEER TRAIL - WEST RAMP (1) PIONEER TRAIL- EAST RAMP MASTER Anderson Lks Pkwy/ Henn. Twn Rd W Ramp Anderson Lk Pkwy/Bloomington Ferry Rd E. Ramp HIGHWOOD/W 78TH ST (39) VALLEY VIEW RD W R MASTER (39) VALLEY VIEW RD E R BREN RD/Londonderry E RAMP BREN/LONDONDERRY W R MASTER 169 E RAMP 7 W RAMP MINNETONKA BLVD E R MINNETONKA BLVD W R MASTER CEDAR LK RD (16) E R CEDAR LK RD (16) W R MASTER BETTY CROCKER DR E R BETTY CROCKER DR W R MASTER PLY AV E RAMP MASTER PLY AV / 13TH AV WR 36TH AV E RAMP 36TH AV W RAMP MASTER E RAMP 49 TH AV w/ MASTER APS Status None None Number of Crosswalks 3 3 Intersection Score 65 69 None None None None None None None None None None None None None None None None 2 2 0 3 3 4 2 3 3 3 3 2 2 2 2 3 67 57 0 86 85 116 72 71 73 78 75 44 54 54 58 100 None None None None None None None None None None None None None None None None None None None 2 4 2 2 3 3 0 0 3 3 3 3 2 2 2 2 3 3 1 52 118 38 38 72 75 0 0 70 64 69 66 53 50 59 46 61 73 21 P a g e | 66 Trunk Highway US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US169 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 US212 Intersection W RAMP 49 TH /SCHMIDT LK RD (109)85TH AV N MASTER (30)93RD AV N 169 S Ramp 109TH AV 114th AV/ELM CRK PKWY 117TH AV N 120TH AV N HAYDEN LAKE RD w/MASTER (12) SE JCT W RIVER RD (12) NW JCT MILLER / DAYTON E Frontage Rd Ferry St Pedestrian Signal MAIN & FERRY 5 25 (33) REFORM ST w/ MASTER FAXON RD (11) J Carver Pkwy Ramps CSAH 10 (Engler Blvd.) West Ramp CSAH 10 (Engler Blvd.) East Ramp TH 41 / (CHESTNUT) w/ MASTER (12) WALNUT ST (15) <17> AUDOBON RD CSAH 17 Powers Blvd. & North Ramp CSAH 17 Powers Blvd. & South Ramp W JCT (101) E JCT (101) MASTER N JCT (101) "Y" DELL RD & NORTH RAMPS/LINWOOD CT DELL RD & SOUTH RAMP TH 212 @ Charlson Rd. (1) PIONEER TRAIL COLLEGE VIEW DR - TECH ENT ANDERSON LK PKWY FOUNTAIN PLACE PRAIRIE CENTER DRIVE REGIONAL CENTER DR SINGLE TREE LANE LEONA RD / EDEN DR <39> VALLEY VIEW E R APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 2 4 4 0 1 3 2 1 1 1 4 2 1 4 3 4 0 1 1 4 4 3 1 1 0 0 1 4 3 1 4 4 4 4 4 3 4 4 2 Intersection Score 47 139 127 0 32 102 66 42 40 37 104 45 45 122 84 115 0 21 27 111 113 75 31 29 0 0 25 108 77 25 121 111 113 111 104 83 97 113 78 P a g e | 67 Trunk Highway US212 US212 US212 US52 US52 US52 US52 US52 US52 US52 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 July 21, 2010 Intersection <39> VALLEY VIEW WR Bryant Lake RD (61) SHADY OAK E R (61) SHADY OAK W R w/ MASTER 117TH ST.E. / WEST RAMP w/ MASTER 117TH ST. E. / EAST RAMP (CSAH 56) BRODERICK BLVD./ N. RAMP UPPER 55TH ST/CENEX DR WR UPPER 55TH ST. E. RAMP (14) SOUTHVIEW BLVD W RAMP / MASTER (14) SOUTHVIEW BLVD E RAMP (47) VERMILLION RD. 15TH ST. (61=VERMILLION) 55 DRIVEWAY ENTRANCE w/ MASTER 10TH ST. (61=VERMILLION) 4TH STREET (61=VERMILLION) "HASTINGS" TH 10 - .5M N. OF HASTINGS 95 HADLEY AV-GRANGE BLVD MASTER CAB GRANGE/80TH ST. EAST RAMP GRANGE/80TH W. RAMP CSAH 22 CR 74 EAST RAMP CSAH 22 CR 74 WEST RAMP GLEN RD. - SINGLEPOINT TH 61 @ Maxwell Ave/Bailey Rd. East Ramp TH 61 @ Maxwell Ave/Bailey Rd. West Ramp (43) CARVER AVE (39) LOWER AFTON RD (27) FROST / PARKWAY (26) ROSELAWN AVE. (25) COUNTY ROAD B w/ MASTER (23) COUNTY ROAD C (19) BEAM AV County Rd. D BUERKLE RD WILLOW LAKE BLVD. 244 (15) CO. RD E CEDAR AVE (12) CO RD F/(95) ASH ST APS Status None None None None None None None None None None None None None None Number of Crosswalks 1 1 1 3 3 2 2 1 3 3 2 4 3 4 Intersection Score 35 32 26 96 83 57 70 31 73 69 58 95 76 83 None None None None None None None None None None None None None Installed (A,B,C,D) None None None None None None None None None None 4 2 0 4 3 3 1 1 1 1 1 2 2 4 2 4 4 3 3 3 2 4 4 4 83 66 0 108 68 77 32 27 56 25 33 56 61 103 52 114 112 84 90 93 57 126 108 113 P a g e | 68 Trunk Highway US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US61 US8 US8 US8 US8 US8 US8 US8 US8 US952A US952A US952A US952A US952A Intersection (65) WH BR AV/(146)HOFFMAN (96) LAKE AVE/SO. JCT. 2ND STREET w/ MASTER 4TH STREET "WHITE BEAR LAKE" 7TH ST (116) 96 12TH STREET (No. JCT.) (8) BUFFALO ST/6TH ST COUNTY ROAD "J" /120TH ST (8A) 140TH / EGG LAKE RD. (8) FRENCHMAN RD. w/MASTER (8) 145TH ST.N. (HUGO) Headwaters Parkway/FOREST LK 97 S. JCT. 5MI S FOREST LK 97 N. JCT. / MASTER (83)/(34) 11TH AVE 8TH AV SE (2) BROADWAY (61=LAKE) 259TH ST / FAIRVIEW BLVD. (30) (31) VIKING BLVD. N.E. RAMP @ TH 61 GREENWAY AVE. (23) Green Lake Tr/ Pioneer Rd (22) (36) VIKING/JOHNSON (24) 77 OLD TOWN / LOFTON SHOQUIST LANE (20) OAK ST/LAKES AVE. 95 (14) MENDOTA RD (ROBERT) MARIE AV (ROBERT) LOTHENBACH AV (952=ROBERT) (8) WENTWORTH (ROBERT) (6) THOMPSON (ROBERT) APS Status None None None To Be Installed None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 3 4 3 4 2 4 1 3 2 3 2 4 4 4 3 4 3 4 0 4 3 2 4 4 4 0 4 4 4 4 4 Intersection Score 110 82 128 78 97 53 94 32 84 58 61 48 76 127 136 105 86 100 91 0 96 72 56 100 104 76 0 118 84 98 102 90 P a g e | 69 District 6 Trunk Highway 3 3 3 3 3 3 3 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14 19 19 19 21 21 35 35 43 43 43 43 43 43 52 July 21, 2010 Intersection Jefferson Parkway TH 246 Woodley Street Hester St CSAH 1 Honey Locust Dr TH 19 S. Jct. TH 19 N. Jct. TH 65 TH 69 1ST Ave CSAH 5 10th Ave W. Circle Dr. N. Ramp W. Circle Dr. S. Ramp Memorial Parkway Crossroads Dr Crossroads Dr Hyvee Access TH 63 E. Circle Dr CSAH 11 TH 74 Cottonwood Dr Main Street I-35 W. Ramp TH 20 7th St 30th St TH 14 E. Ramp Bridge St W. Ramp Riverbend RD Frontenac Dr CSAH 17 Broadway 5th St 4th St N. Jct. CSAH 24 APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 4 4 4 4 4 4 2 3 4 4 3 3 4 1 1 0 2 4 4 2 4 0 4 4 4 2 2 3 2 3 4 4 4 3 Intersection Score 97 122 104 116 136 99 106 55 55 68 115 113 88 65 121 36 40 0 82 99 72 53 95 0 76 99 121 52 54 84 63 95 62 56 62 86 P a g e | 70 Trunk Highway 52 52 52 52 52 52 52 52 52 52 52 57 58 58 60 60 60 60 60 60 60 60 60 61 61 61 61 61 61 61 61 x 61 61 61 61 61 61 61 Intersection S. Jct. CSAH 24 TH 74 19th St W. Frontage Rd 19th St Single Pt. 19th St E. Frontage Rd 37th St W. Ramps 37th St E. Ramps 41st St W. Ramps 41st St E. Ramps 55th St E. Ramps 41st St, E. Frontage Rd Main St Pioneer Rd TH 63 Western Ave 30th Ave TH 21 8th Ave 4th Ave 2nd Ave Central Ave 3rd St, Ravine St Division St TH 14 and TH 16 I-90 Ramp TH 58 (Plum St) Bush St Broad St Old Main St Bench St Tyler Road Bench St and Tyler Road TH 63 Marion St TH 43 Huff St Vila St Gilmore Ave TH 14 (Pelzer St) APS Status None None None None None None None None None None None None None None None None None None None None Installed (A,B,C,D) Installed (A,B,C,D) Installed (A,B,C,D) None None None None None None None None None None None None None None None None Number of Crosswalks 3 4 3 2 3 3 3 3 3 3 4 4 3 4 1 0 4 4 4 4 4 4 4 3 0 4 4 4 2 4 3 4 4 4 4 0 4 0 4 Intersection Score 85 78 94 83 109 87 104 72 79 70 104 83 91 52 35 0 113 62 64 59 62 71 87 88 0 66 65 91 49 125 89 119 68 70 115 0 92 0 127 P a g e | 71 Trunk Highway 61 63 63 63 63 63 63 63 63 63 63 63 63 63 63 65 65 65 65 65 65 90 105 105 218 218 July 21, 2010 Intersection 44th Ave 40th St S. W. Ramp 40th St Woodlake Dr 40th St Commercial Dr TH 52 S. Ramp TH 52 N. Ramp 28th St S 25th St S 20th St S 16th St S 14th St S Northern Heights Dr 37th St N 20th St N TH 30 Margaretha Ave Front St College St Newton Ave Garfield Ave Sorensen Rd 4th St 12th St 14th St I-90 N. Ramp CSAH 27 APS Status None None None None None None None None None None None None None None None None None None None None None None None None Installed (A,B) None Number of Crosswalks 4 1 1 2 0 0 4 3 4 4 4 3 4 4 4 3 4 4 4 4 3 2 3 4 2 2 Intersection Score 101 27 33 59 0 0 126 85 86 103 98 95 154 107 72 93 86 54 55 92 86 35 64 86 44 70 P a g e | 72 District 7 Trunk Highway 4 4 5 13 13 13 14 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 15 15 15 19 19 19 19 22 22 22 22 22 22 22 Intersection 1ST AV S / 7TH ST 1ST AV S / ARMSTRONG TH 5 / MAIN TH 13 / 7TH AVE TH 13 / 13TH AVE TH 13 / 22ND AVE TH 14 / TH 4 (3RD AVE) TH 14 / 1ST AVE TH 14 / JACOB ST TH 14 / GARDEN TH 14 / 16TH ST TH 14 / 7TH ST TH 14 / LOR RAY DR TH 14 / 4TH TH 14 / STATE ST TH 15 / ADAMS ST TH 15 / TILDEN ST TH 15 / BLUE EARTH AVE TH 15 / 4TH ST N TH 15 / WINNEBAGO ST TH 15 / TORGERSON DR TH 15 / GOEMANN RD TH 15 / 20TH ST S TH 15 / 10TH ST S TH 15 / CENTER ST TH 15 / 3RD ST N TH 19 / MAIN ST TH 19 / TH 22 / E. JCT TH 19 / 1ST AVE. TH 19 / 10TH AVE (37) TH 22 / TH 83 TH 22 / HOFFMAN RD TH22/BASSETT TH 22 / MADISON AVE TH 22 / ADAMS ST TH 22 / TH 14 N. RAMP TH 22 / TH 14 S. RAMP APS Status None None Installed (B,D) None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 4 4 4 4 4 4 0 4 4 4 3 4 4 4 4 4 4 4 4 3 4 4 4 4 4 4 4 4 4 4 4 4 4 3 3 Intersection Score 87 85 82 70 117 95 101 68 0 120 87 96 71 100 88 96 80 92 97 112 107 90 99 86 89 88 74 67 87 126 114 113 134 98 122 91 83 P a g e | 73 Trunk Highway 22 22 59 59 60 60 71 71 75 169 169 169 169 169 169 169 169 169 July 21, 2010 Intersection TH 22 / CSAH 3 TH 22 / CSAH 12 TH 59 / HUMISTON OMAHA AVE TH 60 / 10TH ST TH 60 / 6TH ST TH 71 / SHERMAN ST TH71 / NORTH HWY TH 75 / MAIN ST TH 169 / OWATONNA ST BELGRADE N. RAMP BELGRADE S. RAMP TH 169 / WEBSTER TH 169 / LIND ST TH 169 / JEFFERSON TH 169 / MULBURY TH 169 / NASSAU TH 169 / TH 99 APS Status None None None None None None None None None None None None None None To Be Installed To Be Installed To Be Installed To Be Installed Number of Crosswalks 4 4 4 4 4 4 4 4 4 3 3 3 3 1 4 4 4 4 Intersection Score 164 103 97 104 68 103 61 58 71 82 54 63 78 28 100 85 85 88 P a g e | 74 District 8 Trunk Highway 7 7 7/22 7/22 7/22 7/29 7/29 12 12 12 12 12 12 12 12 12 12 12/22 14 15 15 15 15 15 15 15 19 19 19/68 19/68 19/68 19/68 19/68 19/71 19/71 Intersection CSAH 41 TH 71 School Rd TH 15 Bluff St Benson Rd CSAH 15 CSAH 5 10th St 7th St 3rd St 2nd St Lakeland Dr 5th St 3rd St Davis Ave TH 15 Depot Dr TH 71 Edmonton Ave Denver Ave Century Ave So Grade Rd 2nd Ave So Washington Ave 1st Ave No Saratoga St 2nd St TH 23 Mustang Trail Bruce St Lyon St TH 59 Swain St Dekalb St APS Status None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None None Number of Crosswalks 0 4 4 4 4 2 4 2 4 4 2 1 4 4 4 4 1 4 0 2 2 3 4 4 4 4 4 1 1 4 4 4 4 4 4 Intersection Score 0 98 93 126 101 58 96 60 74 80 47 28 115 81 60 91 30 94 0 54 50 66 104 75 101 90 61 36 39 87 79 77 98 70 95 P a g e | 75 Trunk Highway 23 23 23/212 23/75 29/59 59 59 59 59 59 59 59/68 59/68 59/68 75 212 212 July 21, 2010 Intersection South St CSAH 10 Granite St TH 30 TH 212 Canoga Dr Susan Dr TH 23 Southview Dr C St TH 68 3rd St 4th St 5th St TH 212 9th St CSAH 5 APS Status None None None None None None None None None None None None None None None None None Number of Crosswalks 4 4 4 4 4 3 2 1 4 4 3 3 4 4 0 4 4 Intersection Score 95 115 114 111 108 101 78 46 89 84 72 68 86 86 0 83 69 P a g e | 76 Appendix F Curb Ramp Inventory General Information Date/Time Inspector City/Highway Reference Point Feature ID Curb Ramps Width of the Ramp Type Layout Location Design Area (Sq ft) • • • • • • • • • • • • • • • • • • • • • • • • • • Concrete Bituminous Other None Perpendicular Diagonal Parallel Blended Transition Other None Intersection corner Aligned with crosswalk Median Mid-block Pork chop Other Exposed aggregate Detectable warning Truncated dome Dragged Contrasting color Imprinted Sprinkled aggregate Smooth concrete Other None • Flat landing (< 2% slope and cross slope) at top of ramp that at least 4’ x 4’ Flat landing (< 2% slope and cross slope) at bottom of ramp that at least 4’ x 4’ • P a g e | 77 Running slope (%) Cross slope(%) Flare slope (%) Condition Rating Sidewalks Type Width (ft) Length (ft) Slope Direction Number Obstacles within Pedestrian Access Route July 21, 2010 • Gutter count slope < 5% • • • • 1 to 4 Vertical inconsistencies / lip (< 0.50 in) Horizontal gap Obstacles • • • • Concrete Bituminous Other (Joints, Stamped pattern, pavers, etc) None • • Continuous – Connects to next intersection Gap Note locations where longitudinal (running) slope is greater that 1:12 (8.33%) or cross slope is greater than 1:50 (2%) What side of the road? • None • Lightpole • Fire hydrant • Tree (Horizontal and vertical clearance) • Guardrail • Stoplight pedestal • Sign post • Benches • Building • Catch basin • Grate • Guy wire • Utility box • Newspaper box • Other street furniture • Temporary items (sandbags, signs, etc) • Faulted pavement: Note locations with greater than 1/4 inch and greater than ½ inch vertical displacement • Other P a g e | 78 Boulevard/buffer width Condition Rating Curb and Gutter Type Design Gutter Pan Width (in) Curb Height (in) Condition Rating Crosswalk Type 1 to 4 • • • • Concrete Bituminous Integrant Other • • • • B D V S 12 to 48, with 24 set as default 3 to 10, with 6 set as default 1 to 4 • • • • • • • • Uncontrolled Controlled Crossing Distance Orientation Width Linked to median / pork chop / Bumpouts Cross slope Running slope Surface Type • • • • Bituminous Concrete Brick Other Painted Marking • • • • None Zebra stripes (rect. blocks) 2 parallel stripes Diagonal striping Tape • • • None Milled Rolled Crosswalk Design Aesthetic Design Treatments None • Stamped • Painted P a g e | 79 Stop Bar Roadway Speed Condition Rating Signal Walk/Don’t Walk Countdown APS Pedestrian Phase Push button Push Button distance from curb ramp Are push button separated at least 10’ apart Hand holes Signs Crosswalk Crosswalk Ahead Flashing yellow lights Transit Stop July 21, 2010 • • • • • Stamped & dyed Running bond (std.) Herringbone Basket weave Other • • Yes No 1 to 4 • • • • • • • • • • • • • • • Yes No Yes No Audible Tactile Vibro Locator tone Automatic Activation required None On stoplight pole On pedestal station Accessible Other • • Yes No • • Yes No • • • • • • • • • • Yes No Yes No Yes No Continuous Activated Yes No P a g e | 80 School Crossing Intersection Type • • Yes No • • • • • • • 2-way x 2-way 2-way x 4-way 4-way x 4-way Divided highway Side street Median Other • Bus stop boarding and alighting areas must provide a clear length of 8 feet minimum, measured perpendicular to the curb or street or highway edge, and a clear width of 5 feet minimum, measured parallel to the street or highway. Bus stop boarding and alighting areas must connect to streets, sidewalks, or pedestrian paths by a pedestrian access route. The grade of the bus stop boarding and alighting area must be the same as the street or highway, to the maximum extent practicable and the cross slope of the bus stop boarding and alighting area must not be greater than 2 percent. Transit Stops • • P a g e | 81 Appendix G Pedestrian Overpass and Underpass Inventory Bridge Number 69857 96093 27X02 97682 97680 10X02 27816P 9218 56X01 97753 24848 24849 24850 4175 69855 82009 96823 34X03 82812 96517 82811 69858 27908 69804 69805 9482 69885A 82012 27V53 27V54 69838 69843 69885 62872 6512 62804 9618 9888 27985 27987 27868 27710 July 21, 2010 Facility Carried PEDESTRIAN US 61 TH 5 WB US 59 TH 13 TH 5 PEDESTRIAN PEDESTRIAN TH 210 TH 29 (NOKOMIS ST) PEDESTRIAN PEDESTRIAN PEDESTRIAN Pedestrian PEDESTRIAN TH 36 TH 9 TH 23 I 694 NB TH 371 I 694 SB PEDESTRIAN PEDESTRIAN PEDESTRIAN PEDESTRIAN PEDESTRIAN BIKEWAY AT MESABA PED I 494 SB I 494 NB PED AT 17TH AVE E PED AT 25TH AVE PED AT MESABA PED at Bayard Ave GATEWAY TRAIL PED at Walnut St PED at 40th St PED at 73rd Ave PED @ Summer St PED @ 5th St SE PED @ 24th St E PED @ Pennsylvania Feature Crossed 1ST AVE E BIKE PATH BIKE TRAIL BIKE TRAIL BIKEWAY Bluff Creek Trail BNSF RR CEDAR RIVER CENTRAL LAKES TRAIL CENTRAL LAKES TRAIL CO DITCH # 15 CO DITCH # 15 CO DITCH # 15 County 101 Minnesota R DITCH DNR Gateway Trail DNR GLACIAL LAKES TRL DNR RECREATION TRAIL DNR TRAIL DNR TRAIL DNR TRAIL EB I35 RAMP & MICH RAMP ELM CREEK EXCURSION TRACKS EXCURSION TRACKS FAYAL TRAIL FILL GORGE HENN CO TRAIL HENN CO TRAIL I 35 I 35 I 35 & TWO RAMPS I 35E I 35E I 35E & Thompson St I 35W I 35W I 35W & NB off ramp I 35W & off-on ramps I 35W NB, TH 65 & STS I 394 Year Built 1989 1986 1998 1996 1993 2000 1982 1958 1995 1994 1990 1989 1989 1927 1973 1987 1994 2002 1967 1987 1967 1989 1973 1989 1989 1960 1987 1968 2005 2005 1988 1990 1968 1984 1960 1987 1965 1960 1973 1971 1971 1989 P a g e | 82 Bridge Number 27711 27755 27757 27V57 9078 62822 50802 62849 9773 9736 9737 9892 27958 73871 27864 62809 62869 27955 62868 27003 36015 36016 69853 62023 27407 43X01 95154 96697 69122 31020 9600F 27004 73029 5953 6847 62096 2017 2021 2022 18X01 27X06 60X02 10X03 08X04 10X08 86X05 38X03 Facility Carried PED @ Florida Ave PEDESTRIAN PED @ Cedar Lk Rd PED AT MAYWOOD LN PED at 2nd Ave S RECREATION TRAIL PEDESTRIAN PED at ALDINE PED at Grotto PED at Chatsworth PED at Mackubin St PED at 22nd Ave PED @ Seymour PEDESTRIAN PED @ Shingle Crk GRIGGS ST PED PED at Hazelwood PEDESTRIAN PED at Maple PED at Whitney PEDESTRIAN PEDESTRIAN PEDESTRIAN PED at Winifred St TRAIL TH 7 TH 25 I 494 US 53 US 169 NB Ped Trail Ped at St Anthony PEDESTRIAN PEDESTRIAN PEDESTRIAN PEDESTRIAN PED @ 49th Ave PEDESTRIAN PED @ 80th Ave NE TH 210 TH 100 US 2 TH 41 US 14 TH 5 TH 241 TH 61 Feature Crossed I 394 I 394 & 394R Frontage Rd I 394, I394R & Frontage I 494 I 494 & N & S Front Rds I 694 I 90 I 94 I 94 I 94 I 94 I 94 I 94 I 94 I 94 & I 694 I 94 & RAMP 16A I 94 EB on ramp I 94 On/Off Ramps-Huron I 94, Hudson & Pacific I 94, Lyndale & Henn Av JACKFISH BAY JACKFISH BAY KEENE CREEK Lafayette Rd (US 52) LEGION LAKE LUCE LINE ST TRAIL LUCE LINE TRAIL LUCE LINE TRAIL MILLER CREEK MINE RD Minnesota River Mississippi River MN 15 MN 23 MN 23 MN 36 MN 47 MN 65 MN 65 & Frontage Rd Paul Bunyan Trail PED PED PED PED PED PED PED Year Built 1989 1989 1988 2005 1960 1966 1997 1966 1963 1964 1963 1962 1967 1977 1980 2009 1974 1965 1973 1988 1978 1978 1973 1969 2008 1999 1982 1989 2003 1976 1980 1883 1987 1941 1958 2007 1967 1970 1973 2003 2001 2001 2001 2004 2004 2005 2005 P a g e | 83 Bridge Number 69124 27810 03X01 52X02 62X02 62X02X 62X02Y 10X09 6995 6996 8654 96882 69811 91191 91533 96058 16X01 6692 96758 24867 27253 27068 6654 85821 10X04 96690 7033 69X04 69X02 69X03 38014 3717 27284 27649 27012 27038A 27038B 27615 27105 9896 9895 27278 27272 27061 19901 27685 6402 July 21, 2010 Facility Carried US 53 I 94 US 59 US 169 TH 35E TH 35E NB off Ramp 35E SB on ramp TH 101 I 90 I 90 US 61 TH 5 PEDESTRIAN US 61 US 59 US 59 TH 61 US 61 US 52 PEDESTRIAN TH 7 WB Connection TH 7 TH 5 PED TH 5 SKYWAY TH 22 US 53 SB US 53 off ramp US 53 NB PED MN 210(SNWMBL TRL) PED at 39th Ave PEDESTRIAN Ped at 26th St PED Brooklyn Blvd PED Brooklyn Blvd PED at 59th Ave N PED at 41st St PED at Windsor Ave PED at S View Lane Trail A Luce Line Trail PED at 61st St PED @ I 494 PED AT 85th AVE BN Regional Trail Feature Crossed PED CONCOURSE PED PATH PED TRAIL PED TRAIL Ped Trail Ped Trail Ped Trail PED TRAIL PED TUNNEL PED TUNNEL PED TUNNEL PED TUNNEL PED WALK WAY PED WALKWAY PED WALKWAY PED WALKWAY PED-BIKE PED-BIKE TRAIL Pedestrian Trail RAVINE Recreation Tr & Trolley Recreation Trail Recreation Trail RELIEF (IN REST AREA) Riley Creek Trail S BROADWAY (US 63) SAKATAH STATE TRAIL SNOWMOBILE TRAIL Snowmobile Trail SNOWMOBILE TRAIL SOIL STONEY BROOK TH 100 TH 100 TH 100 TH 100 TH 100 TH 100 & SB off ramp TH 100 & Vernon Ave TH 100, Frontage Roads TH 100, Frontage Roads TH 12 & BNSF RR TH 12 & BNSF RR TH 121 TH 13 TH 252 TH 36 Year Built 2003 1982 1998 1998 2001 2001 2001 2007 1957 1957 1936 1990 1967 1951 1977 1984 2009 1951 1990 1973 2001 1981 1952 2008 2000 2008 1999 2004 2001 2004 2004 1922 2000 1983 1978 1976 1976 1980 1968 1971 1971 2005 2003 1962 1982 2003 1954 P a g e | 84 Bridge Number 10531 55044 27202 27220 27R15 27530 27535 27520 5114 27028 36017 36018 31023 31024 97254 31019 27X09 02J30 27866 19R03 2044 27135 85003 27B42 70539 70536 43006 27R30 10048 19025 82032 82028 55019 27R17 Facility Carried PED PED AT 16th ST NW PEDESTRIAN PEDESTRIAN PED PED at 40th Ave S PED at 14th Ave PEDESTRAIN Recreation Trail PED AT 88TH ST PEDESTRIAN PEDESTRIAN US 169 SB US 169 NB TH 23 US 169 SB FLYING CLOUD DR MN 47 PED Linden Avenue US 52 SB PEDESTRIAN PED at Ridgeview PED (ST MARYS) PED-BIKE PED W OF CR 79 PED E OF CSAH 17 PEDESTRIAN PED/BIKE PED/BIKE PED @ Lewis St PED PED PEDESTRIAN PED OFF TH 610 Feature Crossed TH 5 TH 52, & W & E FRONT RD TH 55 & NB off ramp TH 610 TH 610, CSAH 81,RMP,& RR TH 62 TH 62 TH 62 & W 64th St TH 7 TH 77 TILSON BAY TILSON BAY TRAIL TRAIL TRAIL TRAIL TRAIL TRAIL UP RAIL UP RAIL US 10 US 12 & Ridgeview Dr US 14 US 169 US 169 US 169 US 212 US 212 US 212 US 52 US 61 7th Ave BN &CP RR US 61, Hasting Ave, 7th US 63 WET LANDS Year Built 1995 2004 1998 1998 2005 1966 1967 1963 1934 1978 1978 1978 1976 1974 1993 1976 2006 2006 1972 2003 1997 1970 1963 2008 2002 2002 1971 2006 2007 1973 2003 2003 1963 2005 P a g e | 85 July 21, 2010 P a g e | 86 Appendix H Policies and Procedures under Review by Mn/DOT 2008 Signal & Lighting Certification Manual 60% REVIEW CHECKLISTS 95% REVIEW CHECKLISTS Accessibility Grievance Procedure ADA Checklist ADA IMPLEMENTATION PLAN FOR METRO DESIGN D-7 PRESERVATION PROJECT GUIDELINES Design Layout Checklist GDSU Process of Layout Review Guidebook for Minnesota Public Transit Providers Guideline for the Application of Tubular Markers and Weighted Channelizers Guidelines for Changeable Message Sign (CMS) Use Hear Every Voice (HEV): Mn/DOT Public and Stakeholder Participation Guidance Hear Every Voice II: Public Involvement Guidance 2008 HPDP Accessibility Requirements HPDP Geometric Layouts Layout Approval Process Maintenance Manual Minnesota Manual on Uniform Traffic Control Devices (Mn MUTCD) CH 4E Mn/DOT Road Design Manual (RDM) Mn/DOT Traffic Signal Timing and Coordination Manual No Passing Zone Workbook Off-site accessibility checklist OLM's Right of Way Manual section 5-491.810 Scoping and Cost Estimating Scoping Worksheets Standard Plan - Acceleration and Deceleration Lane (Urban) Rigid Design (5-297.210) Standard Plate 7105C Standard Plate 7107H Standard Plate 7108F Standard Plate 7109C Standard Plate 7113A Standard Plate 8400E Standard Plate 8401 Standard Plate Pedestrian installation Standard Sign Summary Standard Signs Manual Tech. Memo. Minnesota Work Zone Safety and Mobility Policy Tech. Memo. Pedestrian Countdown Signals (PCSs) Usage. TRAFFIC ENGINEERING MANUAL Work Zone Field Handbook P a g e | 87 Appendix I Glossary of Terms ABA: See Architectural Barriers Act. ADA: See Americans with Disabilities Act. ADA Transition Plan: Mn/DOT’s transportation system plan that identifies accessibility needs, the process to fully integrate accessibility improvements into the Statewide Transportation Improvement Program (STIP), and ensures all transportation facilities, services, programs, and activities are accessible to all individuals. ADAAG: See Americans with Disabilities Act Accessibility Guidelines. Accessible: A facility that provides access to people with disabilities using the design requirements of the ADA. Accessible Pedestrian Signal: A device that communicates information about the WALK phase in audible and vibrotactile formats. Also known as APS. Alteration: A change to a facility in the public right-of-way that affects or could affect access, circulation, or use. An alteration must not decrease or have the effect of decreasing the accessibility of a facility or an accessible connection to an adjacent building or site. Americans with Disabilities Act: The Americans with Disabilities Act; Civil rights legislation passed in 1990 and effective July 1992. The ADA sets design guidelines for accessibility to public facilities, including sidewalks and trails, by individuals with disabilities. Also known as ADA. Americans with Disabilities Act Accessibility Guidelines: ADAAG contains scoping and technical requirements for accessibility to buildings and public facilities by individuals with disabilities under the Americans with Disabilities Act (ADA) of 1990. APS: See Accessible Pedestrian Signal. Architectural Barriers Act: Also known as ABA. Class I Rest Areas: Rest area buildings are open 24 hours per day and offer modern facilities, drinking fountains, display case maps, travel displays, vending machines and public phones. They feature picnic facilities; lighted walkways; and lighted car, recreational vehicle and commercial truck parking lots. July 21, 2010 P a g e | 88 Class II Rest Area: Class II rest areas feature vault toilet facilities with separate facilities for men and women, a water well, picnic facilities, paved parking lots and other site amenities. They are seasonally operated. Detectable Warning: A surface feature of truncated domes, built in or applied to the walking surface to indicate an upcoming change from pedestrian to vehicular way. DOJ: See United States Department of Justice Federal Highway Administration (FHWA): A branch of the US Department of Transportation that administers the federal-aid Highway Program, providing financial assistance to states to construct and improve highways, urban and rural roads, and bridges. FHWA: See Federal Highway Administration PROWAG: An acronym for the Guidelines for Accessible Public Rights-of-Way issued in 2005 by the U. S. Access Board. This guidance addresses roadway design practices, slope, and terrain related to pedestrian access to walkways and streets, including crosswalks, curb ramps, street furnishings, pedestrian signals, parking, and other components of public rights-of-way. Right of Way: A general term denoting land, property, or interest therein, usually in a strip, acquired for or devoted to transportation purposes. “Right of way” also may mean the privilege of the immediate use of the highway. (MN 169.01 Subd. 45) Section 504: The section of the Rehabilitation Act that prohibits discrimination by any program or activity conducted by the federal government. Travel Information Centers: Travel Information Centers (TICs) and Regional Welcome Centers are Class I rest areas that offer expanded customer services and feature a staffed travel information counter. The TICs offer a broad range of statewide travel information while the Welcome Centers provide more regional travel information. Statewide Transportation Improvement Program: The Statewide Transportation Improvement Program (STIP) is Minnesota’s four year transportation improvement program. The STIP identifies the schedule and funding of transportation projects by state fiscal year (July 1 through June 30). It includes all state and local transportation projects with federal highway and/or federal transit funding along with 100% state funded transportation projects. Rail, port, and aeronautic projects are included for information purposes. The STIP is developed/updated on an annual basis. STIP: See Statewide Transportation Improvement Program Uniform Accessibility Standards (UFAS): Accessibility standards that all federal agencies are required to meet; includes scoping and technical specifications. P a g e | 89 United States Access Board: An independent federal agency that develops and maintains design criteria for buildings and other improvements, transit vehicles, telecommunications equipment, and electronic and information technology. It also enforces accessibility standards that cover federally funded facilities. United States Department of Justice: The United States Department of Justice (often referred to as the Justice Department or DOJ), is the United States federal executive department responsible for the enforcement of the law and administration of justice. July 21, 2010
© Copyright 2026 Paperzz