2010 Concentrating Solar Projects USA Location Daggett, CA Daggett, CA Kramer Junction, CA Kramer Junction, CA Kramer Junction, CA Kramer Junction, CA Kramer Junction, CA Harper Dry Lake, CA Harper Dry Lake, CA Red Rock, AZ Boulder City, NV Bakersfield, CA Lancaster, CA Peoria, AZ Indiantown, FL San Bernardino, CA Lancaster, CA Tonopah, NV Primm, NV Santa Teresa, NM Rice, CA Phoenix, AZ Harper Dry Lake, CA Blythe, CA Riverside, CA Riverside, CA Ridgecrest, CA Imperial Valley, CA Project Name SEGS I SEGS II SEGS III SEGS IV SEGS V SEGS VI SEGS VII SEGS VIII SEGS IX Saguaro Power Plant Nevada Solar One Kimberlina Solar Thermal Power Plant Sierra SunTower Maricopa Solar Project Martin Next Generation Solar E Center Calico-Solar One Alpine SunTower Crescent Dunes Solar Energy Ivanpah solar E Generating Station New Mexico SunTower Rice Solar Energy Project Solana Abengoa Mojave Solar Project Blythe Solar Power Project Genesis Solar Energy Project Palen Solar Power Project Ridgecrest Solar Power Project Imperial Vally - Solar Two Technology Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Linear Fresnel Power Tower Dish/engine Parabolic Trough Dish/engine Power Tower Power Tower Power Tower Power Tower Power Tower Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Parabolic Trough Dish/engine Capacity (net MW) 13.8 30 30 30 30 30 30 80 80 1 72 5 5 1.5 75 850 92 100 440 92 150 280 250 250 250 250 250 750 Status Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Under Development Under Construction Under Development Under Development Under Development Under Development Under Development Under Development Under Development Under Development Under Development Under Development Under Development Under Development Under Development 2 Start Year Area (m ) 1984 82,960 1985 190,338 1985 230,300 1989 230,300 1989 250,500 1989 188,000 1989 194,280 1989 464,340 1990 483,960 2006 100,000 2007 357,200 2008 26,000 2009 27,670 2010 2011 2011 2012 2013 1,071,361 2013 2,295,960 2013 519,107 2013 1,071,361 2013 2013 2013 1,450,000 2013 2013 1,450,000 2013 1,400,000 2014 Category Parabolic Trough Dish/engine Power Tower Linear Fresnel Operational Under Development State California Nevada Arizona New Mexico Florida Capacity (net MW) 2031.8 1601.5 879.0 5.0 436.8 4080.5 Status Operational Under Development Operational Under Development Operational Under Development Under Development Under Development http://www.nrel.gov/csp/solarpaces/ Capacity (net MW) 363.8 3092.0 72.0 540.0 1.0 281.5 92.0 75.0
© Copyright 2026 Paperzz