QUOTE SHEET SCHOOL ZONE IMPROVEMENTS –HAWK SIGNAL UPGRADE & SOLAR POWERED FLASHING BEACON INSTALLATIONS (ST 1705) TO: City of Dodge City 806 Second Avenue P.O. Box 880 Dodge City, Kansas 67801 The City of Dodge City and USD 443 are looking to make safety upgrades to three school zones through the installation of solar powered flashing 20 mph beacons and the conversion of a crosswalk signal to a HAWK signal. These improvements call for the installation of 7 solar powered beacons with an add alternate of one beacon (8 total with add alternate) and one crosswalk signal conversion to a HAWK. This work is to be completed in the summer months while school is out. All signal materials are to be purchased from Gades Sales out of Wichita, KS. Material estimates for the beacons and the signal conversion are attached, along with approximate beacon locations and concrete signal base specs (KDOT pedestal bases). ANTICIPATED START DATE: CONSTRUCTION DAYS NEEDED: The undersigned hereby proposes to comply with the City of Dodge City’s Standard Specifications and complete the project for the following prices: DESCRIPTION UNIT QUANTITY 1. Solar School Beacon, Installed 2. HAWK Signal Upgrade Each L.S 7 1 UNIT PRICE $ $ AMOUNT $ $ BASE BID AMOUNT BID ALTERNATE 1. Solar School Beacon, Installed Each 1 $ $ TOTAL BID AMOUNT The above unit prices should include all costs associated with installation, including mobilization and traffic control. These costs will be considered incidental for which no additional payment will be made. Each submitted quote shall remain valid for at least 45 days from the due date of this quote. The City reserves the Right to Refuse any and all Quotes. Per City policy, Performance Bonds are not required on projects under $50,000. Q-1 FIRM: ___________________________________ BY: ___________________________________ POSITION: _______________________________ ADDRESS: _________________________________ _________________________________ _________________________________ PHONE: _________________________________ DATE: _________________________________ Questions about the existing crosswalk signal may be directed to Corey Keller at [email protected] Quote Sheet needs to be returned to the Engineering Office by 2:00 pm on Tuesday, March 14th, 2017. Quote sheet may be mailed, hand delivered, or emailed to [email protected]. Q-2 Quote Date: Quote to: Mr. Tanner Rutschman City of Dodge City Job: 10/04/16 6th Street Pedestrian Crossing "Hawk" Signal Upgrade [email protected] Qty 4 2 2 2 1 1 1 Description 3 Section Signals "Hawk" Configuration with Backplates and Mast Arm Mounting Brackets Pedestrian Signals w/Countdown LED's and Clamshell Mounting Brackets Standard ADA Pushbuttons w/Signs R10-23 Signs w/Mast Arm Mounting Brackets EPAC Controller, Conflict Monitor, Load Switches, Flash Transfer Relays, and Miscellaneous Equipment to Convert Existing Cabinet to "Hawk" Configuration Technical Assistance to Modify Cabinet Lot Price Unit Price Line Total $7,860.00 $7,860.00 Upgrade to Audible Pedestrian Stations would cost an additional $986.00 Price reflects re-using the existing controller cabinet, pedestal pole, mast arms and signal poles. If any of this equipment needs to be replaced, additional pricing will be provided. Total Delivery is approximately 30 - 45 days after approval and release of order. By: Sharon Quaney [email protected] PO Box 9003, Wichita, KS 67277 - 316-943-1219 $7,860.00 Quote Date: Quote to: Mr. Tanner Rutschman City of Dodge City Job: 10/04/16 School Beacons [email protected] Qty 2 Description Solar School Beacon Pedestal Assembly: (1) 15' Aluminum Pedestal w/Collar and Anchorage (3) 12" Yellow LED Beacons w/Mounting (1) S5-1 Fluorescent Green School Sign (1) S5-2 End School Zone Sign (2) SH0206 Sign Mounting Brackets (1) Solar Controls w/85 Watt Solar Panel, Mounting Bracket, Battery/ Control Cabinet w/100 Amp Gel Cell Battery, Flasher, Regulator and Time Clock Unit Price $3,465.00 Please note that the unit price above is Per Pedestal Pole. There are two poles per School Zone. Total Delivery is approximately 30 - 45 days after approval and release of order. By: Sharon Quaney [email protected] PO Box 9003, Wichita, KS 67277 - 316-943-1219 Line Total $6,930.00 $6,930.00 57
© Copyright 2026 Paperzz