BASE AND DUCTING DETAILS FOR 75 TO 500 kVA TRANSFORMERS 200 900 1630 200 200 900 900 2,3,12 (TYP.) 1 DUCTS ARE TO BE INSTALLED DIRECTLY BELOW THE WINDOW 1780 IN THE BASE 1420 A 1 A 3 900 6 300 MIN MAXIMUM 4 CONDUCTORS 1990 PER PIPE, DUCTS MUST BE COMPLETELY VISIBLE 200 AND ACCESSIBLE THROUGH WINDOW (SEE DETAIL A) SEE GUARD RAIL B CONSTRUCTION 2,4,12 (TYP.) PRIMARY SIDE SECONDARY SIDE OF TRANSFORMER OF TRANSFORMER 915 355 DRAWING 114 3 LEFT FRONT 114 TOP VIEW 241 1143 A 358 178 241 SCALE: N.T.S. 421 WINDOW DETAIL SCALE: N.T.S. NOTES: 1. WHEN SETTING BASE, OBSERVE 250 mm MINIMUM AND 300 mm MAXIMUM REQUIREMENT FOR ELEVATION FROM TOP OF BASE TO FINISHED GRADE (NOT ROUGH GRADE). 2. INSTALL GUARD RAIL 200 mm OUTSIDE OF GROUND GRID. GUARD RAIL SHALL BE FRONT REMOVABLE. 3. ENSURE 5.0 m OF 4/0 Cu IS COILED IN BASE FOR EACH GRADIENT CONTROL CONNECTION TO GROUND BUS. 4. TRANSFORMERS INSTALLED ON PRIVATE PROPERTY SHALL REQUIRE A GUARDRAIL. 5. ANY CONTRACTOR SUPPLIED BASES SHOULD BE CONSISTENT WITH EPCOR SPECIFICATION. 6. 75 TO 500 kVA TRANSFORMERS CAN ACCOMODATE MAXIMUM 6 CONDUCTORS PER PHASE. 7. ALL CABLES TO HAVE A MINIMUM OF 5 m OF EXTRA LENGTH COILED IN BASE AS MEASURED FROM TOP OF PIPE OR AT CABLE ENTRY POINT. 20170126 15:11 rlawrie ALL DIMENSIONS IN MILLIMETERS (INCHES) UNLESS OTHERWISE SPECIFIED. INSTALLATION OF PRECAST CONCRETE BASE FOR THREE PHASE TRANSFORMERS CUSTOMER CONNECTI ON GUI DE DATE REVISED: 2016-12 -07 REFERENCE NO. DRAWING NO.: 009 PAGE NO. 65 CC 07 00 27 133 1 4 BASE AND DUCTING DETAILS FOR 750 TO 2500 kVA TRANSFORMERS 200 900 1900 200 200 900 2,3,12 (TYP.) 900 1 DUCTS ARE TO BE INSTALLED DIRECTLY BELOW THE WINDOW 2060 1700 IN THE BASE B 2 A 3 900 6 MAXIMUM 4 CONDUCTORS 300 MIN PER PIPE, DUCTS MUST 2260 BE COMPLETELY VISIBLE AND ACCESSIBLE THROUGH 3 CONSTRUCTION LEFT FRONT 2,4,12 (TYP.) DRAWING PRIMARY SIDE SECONDARY SIDE OF TRANSFORMER OF TRANSFORMER 964 382 SEE GUARD RAIL 102 (TYP.) 200 WINDOW (SEE DETAIL B) B 102 (TYP.) TOP VIEW 152 178 SCALE: N.T.S. 1168 B 332 368 548 WINDOW DETAIL SCALE: N.T.S. NOTES: 1. WHEN SETTING BASE, OBSERVE 250 mm MINIMUM AND 300 mm MAXIMUM REQUIREMENT FOR ELEVATION FROM TOP OF BASE TO FINISHED GRADE (NOT ROUGH GRADE). 2. INSTALL GUARD RAIL 200 mm OUTSIDE OF GROUND GRID. GUARD RAIL SHALL BE FRONT REMOVABLE. 3. ENSURE 5.0 m OF 4/0 Cu IS COILED IN BASE FOR EACH GRADIENT CONTROL CONNECTION TO GROUND BUS. 4. TRANSFORMERS INSTALLED ON PRIVATE PROPERTY SHALL REQUIRE A GUARDRAIL. 5. ANY CONTRACTOR SUPPLIED BASES SHOULD BE CONSISTENT WITH EPCOR SPECIFICATION. 6. 750 TO 1000 kVA TRANSFORMERS CAN ACCOMODATE MAXIMUM 6 CONDUCTORS PER PHASE AND 1500 TO 2500 kVA TRANSFORMERS CAN ACCOMODATE MAXIMUM 8 CONDUCTORS PER PHASE. 7. ALL CABLES TO HAVE A MINIMUM OF 5 m OF EXTRA LENGTH COILED IN BASE AS MEASURED FROM TOP OF PIPE OR AT CABLE ENTRY POINT. 20170126 15:14 rlawrie ALL DIMENSIONS IN MILLIMETERS (INCHES) UNLESS OTHERWISE SPECIFIED. INSTALLATION OF PRECAST CONCRETE BASE FOR THREE PHASE TRANSFORMERS CUSTOMER CONNECTI ON GUI DE DATE REVISED: 2016-12 -07 REFERENCE NO. DRAWING NO.: 009 PAGE NO. 65 CC 07 00 27 133 2 4 BASE AND DUCTING DETAILS FOR 75 TO 500 kVA AND 750-2500 kVA TRANSFORMERS TEMPORARY DUCTS TO 300 MIN 1100 MAX 1500 (3%-10% SLOPE) 300 MAX. CONDUCTORS FINISHED GRADE 250 MIN. GRADIENT CONTROL 203 3 (8") ENSURE PROPER ALIGNMENT C 11 (TYP.) SECONDARY DUCTS 8 (TYP.) SEE NOTE 1 7 (TYP.) DO NOT PUT PRIMARY OR SECONDARY SEE NOTE 2 DUCTS THROUGH "KNOCK-OUTS" SECTION A SCALE: N.T.S. TEMPORARY DUCT 6 (2 X 5.0 m USED TO ASSURE COILED IN BASE) PROPER ALIGNMENT CORNER POST 3%-10% SLOPE C DETAIL 250 MIN 300 MAX 300 300 MIN MIN 1100 MAX 1500 SCALE: N.T.S. 5 10 B SECTION SCALE: N.T.S. NOTES: 1. ADAPTER COUPLING IS REQUIRED FOR DB2 CONDUIT. 2. 36" RADIUS BENDS ARE PREFERRED FOR ALL DUCT BENDS. 20170126 15:13 rlawrie ALL DIMENSIONS IN MILLIMETERS (INCHES) UNLESS OTHERWISE SPECIFIED. INSTALLATION OF PRECAST CONCRETE BASE FOR THREE PHASE TRANSFORMERS CUSTOMER CONNECTI ON GUI DE DATE REVISED: 2016-12 -07 REFERENCE NO. DRAWING NO.: 009 PAGE NO. 65 CC 07 00 27 133 3 4 ITEM 1 STOCK No. PART DESCRIPTION AS REQ'D BASE PRECAST TRANSFORMER 75 - 500 kVA CONCRETE 11794 750 - 2500 kVA CONCRETE 11636 1 2 ROD GROUNDING 5/8" x 5' 17288 8 3 CONNECTOR GROUND ROD 9136 2 4 CONNECTOR GROUND 31914 2 5 SAND 6 WIRE #4/0 STRANDED COPPER BARE 7 BEND PVC RIGID 3/4" - 250 DOUBLE WIRE 3/4" ROD - 250 1/C AS REQ'D A/R 44327 22960 17787 AS REQ'D PIPE DUCT DB2 - 4" 53283 DB2 - 6" 42236 RIGID PVC - 4" 10083 A/R 10692 AS REQ'D COUPLINGS 4" DB2 - 4" PVC/FRE 38916 4" PVC 26695 6" DB2 - 6" PVC/FRE 10284 6" PVC 34751 10 ROAD CRUSH - 3/4" 11 BELL END COLLAR 12 A/R 36m 4" 90 DEGREE 36" RADIUS PLAIN ENDS RIGID PVC - 6" 9 N/A 45655 4" 90 DEGREE 24" RADIUS PLAIN ENDS 6" 90 DEGREE 36" RADIUS PLAIN ENDS 8 20170126 15:15 rlawrie QTY. A/R N/A A/R AS REQ'D A/R RIGID PVC - 4" 20574 RIGID PVC - 5" 20731 COUPLER - GROUND ROD 17289 4 INSTALLATION OF PRECAST CONCRETE BASE FOR THREE PHASE TRANSFORMERS CUSTOMER CONNECTI ON GUI DE DATE REVISED: 2016-12 -07 REFERENCE NO. DRAWING NO.: 009 PAGE NO. 65 CC 07 00 27 133 4 4
© Copyright 2026 Paperzz