Who we are and why we are here 1 Levitt Bernstein Architects, GVA Grimleys, WSP Masterplan of wider strategic are Kinnear Landscape Architects Masterplan for public realm & park areas only What is our brief? Why are we here? Camden Council has commissioned a team of consultants to carry out a study of the Abbey Road area, A public exhibition was held in July 2010 to show initial ideas for the strategic development framework for from Loudoun Road in the east through to the Abbey Co-op and the Belsize Road Car park in the west. the Abbey Area, along with 3 options for the redevelopment of the Abbey Co-op Estate. The study will set out a clear vision for regeneration of the area which will include: This exhibition presents more detailed proposals for one of the options for the Abbey Co-op Estate (Option An over-arching Strategic Development Framework for the Abbey Road Area B(1). It covers more detail on the number of new homes proposed, the heights of the buildings, and the other commercial and community uses proposed. A focussed Masterplan for the Abbey Co-op / Belsize Road Car Park area leading to an outline planning application for any new development; and The suggested framework for the wider area, including the Abbey Estate and the Alexandra and Ainsworth Estate, previously shown to you is also presented to show how the new proposals for the Abbey Co- A detailed development brief for the 1-8 Langtry Walk site on Loudoun Road. op Estate could fit into the longer term changes in the wider area. A separate master planning study by Kinnear Landscape Architects for the public realm and park areas within the Alexandra & Ainsworth Estate will be presented separately. Redevelopment of the Abbey Co-op / Belsize Road Car Park area will: Provide new council homes for existing residents to modern standards which meet their current housing needs Why your views are important The lease on the Belsize Road Car Park site is due to end in 2013. The council plan to submit an outline Provide additional new affordable homes for rent, of a range of sizes and tenures, which should new include 3 and 4 bedroom homes planning application in early 2011 to enable redevelopment plans for this site to be prepared in good time. This means that the Council will start to make decisions which will affect the redevelopment of the Car Park Building, and potentially other areas of the Abbey Co-op Estate based on the response to this exhibition. Provide a range of new shops and services which better respond to the needs of the local area than the existing uses Generate funds through the provision of new homes for private sale; which will help fund the above, and Please fill out one of the feedback forms provided by officers if you can, or forward any comments to: Estate Regeneration Team London Borough of Camden Investigate the opportunities to generate funds for improvements to the wider area, including Decent Homes programme goals 33 - 35 Jamestown Road London NW1 7DB www.camden.gov.uk/abbey area At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition Camden What we showed you last time: Wider Area Existing 2 Towards Finchley Road tube station Towards West Hampstead rail station lk Public open space with play equipment Railway line forms a barrier between residential areas Local retail area 0m -6 in wa m -7 KEY 50 d Lan e Community facility West En Play space Swiss Cottage 50 0m -6 -7m in w alk South Hampstead K il bu rn Hi d oa R gh oad ze R si Bel e Av Entrance from east to Alexandra and Ainsworth estates ad Ro oad yR ar und Bo be Ab 500m - 6 Kilburn High Road -7min walk Road Finchley Loudoun Road Public open space with play equipment, recreation courts and seating spaces 50 0m -6 -7 mi nw alk d oa yR St. John’s Wood Play areas within open spaces of the estate Local retail area Proposed Local retail area Towards Edgware Road and Marylebone tube stations Towards Finchley Road tube station Maintain and enhance the public open space creating a better play area and providing improved visual and physical connection to Belsize Road Towards West Hampstead rail station Maintain and enhance the public open space - creating better play areas and public spaces within the park area, with improved northsouth pedestrian routes to better link Alexandra and Ainsworth Estate Lane Creating a new hub at the junction of Belsize Road and Abbey Road - redeveloping the Abbey Co-op site, reproviding existing facilities , improving the public spaces and realm with the potential to create a new mixed use residential node at this junction West End Swiss Cottage South Hampstead rn bu Kil gh Hi Redevelop 1-8 Langtry Walk site to provide a better entrance way into the estates - a gateway building with a mixed use element of retail and residential to compliment and add to the retail offer of the hub to the north of South Hampstead Station d a Ro oad ze R si Bel Improve and enhance entrance to the TRA Hall, creating better north south pedestrian link along its western edge oad yR ar und Finchley Loudoun Road Road Bo Kilburn High Road The Abbey Estate has the long term potential to be redeveloped into a new neighbourhood along Abbey Road. Currently, the estate feels cut off due to the convoluted pedestrian pathways through the area. Improving east - west access and better linkages through the estate will prove beneficial for the wider area. St. John’s Wood Redevelop the ‘Abbey Hive’ to create a more sensitively designed building - one which provides a better frontage to and connection into the linear public open space between Ainsworth and Alexandra estates At Home in the Abbey Area Local retail areas should be improved and well connected to each other - this can be done through improving the public spaces and sidewalks along Abbey Road and by creating better visual and physical linkages into the residential estates along this route. Abbey Co-op Estate Regeneration Exhibition Towards Edgware Road and Marylebone tube stations Camden What we showed you last time: Abbey Co-op Estate 3 Existing Open space to the rear of Snowman & Casterbridge: Valuable resource in area Emminster Building: Existing retail along ground floor - shops cut off from main road Ab be yR ize Bels oa d ay ailw d Car Park facing Belsize Road - cuts off access to the open space from the road Roa e Lin R Community Centre along Belsize Road: No room for expansion. Entrance not visible / welcoming enough ad o eR Ab iz ls Be be y Ro ad Entrance to Snowman and Casterbridge: No surveillance from above to help security. Very windy at times due to open areas around the base of the towers and no canopies to help deflect the wind The Car Park Building: Mainly car based uses. Are these appropriate in a mainly residential area? Proposed Belsize Road / Abbey Road Junction - Fast traffic, unfriendly for pedestrians Option A1 Car Park along Abbey Road / Belsize Road - Poor sense of local character for such a important road junction marked by local shops and services Option B1 Option B2 Redevelop the car park site Redevelop the car park site As Option B1, plus; New secure entry to Casterbridge & Snowman New development at base of Casterbridge & Snowman Create new tower landmark working with Casterbridge and Retain and refurbish existing homes Redevelop community centre, Hinstock & Emminster sites Snowman Total - 115 new homes New public space and road junction Create more new homes Total - 235 new homes Invest more in public space and community benefits Total - 330 new homes At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition Camden Results from the previous exhibition What you said Interest in the proposals at the previous exhibition was very high with 250 questionnaires received 4 What was decided No new tower blocks to be proposed covering a wide range of issues. No loss of existing green space Generally there was a very positive response to the consultation from those most affected by the proposals No loss of existing play spaces Option B(1) was the most popular option in responses from residents currently living on the Abbey Co-op No new buildings to the sides of Casterbridge and Snowman, with new facilities built between the towers estate No loss of existing parking spaces Significant numbers of residents living in the surrounding area had strong concerns on the effect that development may have on local schools and services, levels of traffic and parking, safety and antisocial No loss of affordable homes behaviour A new replacement community facility The results of the consultation were discussed in detail with local Kilburn ward councillors, and based on the responses received from the consultation, Camden instructed the consultant team to develop Additional affordable family housing for rent must be included more detailed proposals based on Option B(1), so that any revised design responds to the consultation comments shown on the diagram above Existing residents in Emminster and Hinstock to be offered first choice of a new home A local lettings policy must be agreed with existing Abbey Co-op residents before any decisions are made to demolish existing homes Proposals to provide extra school places and health services to be explored and agreed as part of the planning process At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition Camden The revised proposals for the Abbey Co-op Ab Connect the new public space around the junction to the existing open green space behind the towers be yR oa d 5 Create new play areas and enhance the existing open space which will be used by existing and new residents on the estate Play area Slow the traffic down through the junction to make it suitable to use the outdoor space around the junction for seating and make it safer for pedestrians oad eR z i s l e B Mark all the approach to the junction with new street trees on either side of the road Create private courtyards behind the new housing blocks Create a vibrant new character for road junction to mark its importance as a local centre surrounding on all sides by shops and community facilities to serve the local area Create secure play areas within the courtyards Improve / widen the pavements across the railway bridge to help improve links to both the Abbey Estate and the Alexandra & Ainsworth Estates to the south ey a Ro d Mark all the approach to the junction with new street trees on either side of the road b Ab Existing car park building redeveloped to provide new homes and shops Plant a green barrier to shelter the housing courtyards from the railway noise ad Locate new flats away from the railway where possible o eR lsiz Be ilw Ra ne li ay Concept plan of Abbey Co-op Estate following proposed redevelopment The proposed buildings are currently being tested and any final proposals will be designed to ensure that an overshadowing of existing properties will be strictly within recommended limits. The sunlight study illustrated below shows the effect on 21st April of the current proposals on the surrounding area and the new outdoor spaces formed around the junction. Key issues: 9.00 11.00 13.00 15.00 At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition The existing 74 existing homes in Hinstock and Emminster would be demolished These would be replaced with 265 new homes, of which up to 114 would be for affordable rent In addition to this some of the new homes would be shared ownership All existing bedsits would be replaced with 1 bed flats Up to 40 of the new homes would be new 3 or 4 bedroom homes for families At least 27 of these would be suitable for wheelchair users All new homes would be built to lifetime homes standards, and would also have better sound insulation, better thermal insulated and be more efficiently heated than your existing homes, and so would need less energy to heat them All new homes would either have a balcony, a private garden or a roof terrace. This would match or be larger than typical existing balconies in Emminster and Hinstock All new homes would be built to the latest environmental standards (Code for Sustainable Homes Level 4) The new buildings would be built to a high standard of construction, with both affordable and private sale homes built to the same external quality: this is called tenure blind A design code would form part of any planning application. This would contain information on the minimum design standards for key elements of the design such as: the size of the new homes; the number of homes sharing common areas such as lifts and courtyards (e.g.. keeping this low so that people feel a greater sense of ownership over where they live); the quality of external materials etc; to ensure that the overall quality of the scheme is maintained throughout the development Camden The revised proposals for the Abbey Co-op 6 Use the existing towers as a landmark for a new community hub building built around the base of the towers Abb ey R oad New building at base of towers (no more than 2-storeys high) help enclose the space around the junction to give it a more defined character. Green roofs could be added to provide visual amenity from the towers iz ls Be ad o eR Existing green space would be upgraded, including a strong new edge treatment along Belsize Road Create a high quality landmark building on the corner of the Car Park Site to mark the entrance to the road junction and new public space. This corner will be visible from a long distance along Abbey Road from the South Buildings stepped down in height where they meet the existing buildings to reduce over shadowing d e z i ls a Ro Gaps formed in new buildings along Belsize Road to let light in, views out and increase sunlight reaching the private courtyards behind the new blocks to the north Be New buildings on this corner to be lower than the existing buildings to let more light into the public space in the afternoon Ab be yR oa d Artists impression of aerial view of Abbey Co-op Estate following redevelopment A high quality landmark building is proposed on the corner of the Car Park site. This would be the tallest of the proposed new buildings and would be prominent in views looking north along Abbey Road. Studies 12 ST TOWER? for a 10 storey building and a 12 storey building (both with the same number of flats in) are illustrated below to show different ways how this might be achieved. 10 storey option 1 storey Ab be Be lsiz yR oa d eR oad This option is shorter, but is 2 storeys 4 storeys significantly wider on the side 5 storeys facing Abbey Road. This would 6 storeys 7 storeys cast a shorter midday shadow, 10 storeys but a wider shadow over the Abbey 11 storeys 12 storeys junction and the buildings to the Road east along Belsize Road in the oad R bey Ab afternoon. 20 storeys Proposed building heights diagram Key issues: 12 storey option Ab Be lsiz be yR eR oa d oad This option is taller but much narrower on the side facing Abbey Road, giving it a thinner appearance. This would cast a longer shadow at midday, but a Abbey Road oad R bey Ab much narrower shadow over the junction and the buildings to the east along Belsize Road in the afternoon. The existing community centre, health centre and rows of shop units would be demolished A new community centre would be built as part of any redevelopment to re-provide the existing centre Any proposals would also show a location for a new health centre. A decision on whether the new heath centre would be relocated on the estate or elsewhere in the area will not be made until later due to recent changes in the health service New retail and commercial spaces would be built as part of the development which would replace the existing shop units and provide additional retail space to serve the extra homes being built New outdoor seating / display spaces would also be created to encourage small café’s, restaurants, florists etc to move to the area All new buildings would be designed to the latest police advice to make access into and around the buildings safer. Extra shops, busier public spaces, and the wider range of housing tenures would also help to improve safety in the area Aerial view looking north west along Abbey Road Aerial view looking south towards the Abbey Estate At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition Camden Housing 7 Artists impression of view looking east along Belsize Road, with the Car Park site on the right of the image All new homes built by the railway would have whole house mechanical ventilation and extra sound insulation, and glazed in balconies to help keep the noise of the train out and avoid the need to open windows to let fresh air in Buildings designed so that approximately 90% of all new homes will be dual aspect and so will naturally stay cool in the summer and warm in the winter 2 bed 3 bed 4 bed Indicative typical upper floor showing new housing New 3 and 4 bed homes generally located at ground level with private rear gardens within the courtyards A green barrier would also help protect outdoor spaces from train noise 1 bed 1 bed 2 bed 3 bed Illustration of how the new homes could be built by the railway What the new homes could look like Key Issues: Emminster and Hinstock residents Key Issues: Decent Homes Residents who wish to stay on the estate would be offered a range of housing options. These shall include the option to live in a new home built either on the Car Park site or on the current Emminster and Hinstock site Residents would also be given the option to move off the estate if they prefer and would be given additional points in order to bid for new properties through the Choice-based lettings programme The number of bedrooms in your new home would be based on your housing needs, not the size of your current flat The size of all new homes would either match or be larger than the size of your existing home A local lettings policy would be agreed with existing residents prior to the start of building any new homes Leaseholders would get compensation in line with Camden’s standard terms of compensation for redevelopment of council land and would be offered the option of buying a new home in the new development Outstanding Decent Homes works for Snowman and Casterbridge would be funded from proceeds from private sales. Upgrade works to the common areas in Snowman and Casterbridge would also be carried out when new building works are carried out between the towers. Decent homes works to other properties in the wider Abbey area could also be funded through the development, but this would be dependent on the level of new affordable a and private sale homes that would be built, which the Council would not decide until 2011 at the earliest. 4 bed Indicative ground upper floor showing new housing At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition Camden Retail and Commercial Spaces 8 Artists impression of view looking south along Abbey Road towards new shops and the new public space UPDATE? larger shops and/or showrooms smaller shops possibly including cafes but not fast food small shops and/or offices or start up studio’s local cafe / small restaurant Artists impression of view looking west along Belsize Road toward new shops and the new public space Proposed ground floor showing retail and commercial spaces Key Issues: Retail and Commercial Spaces New commercial spaces would be created around the road junction These would mostly be small spaces for local shops or offices. New outdoor seating / display spaces would be created to encourage small café’s, restaurants, florists etc to move to the area The amount of additional commercial space would be limited to serve just the extra new homes in the development, so that they would not affect existing shops in the surrounding areas Existing shopkeepers would be given the opportunity to rent new units in the area if they wish. Commercial leaseholders who would prefer to relocate elsewhere would be compensated. New delivery bays would be created to avoid delivery lorries affecting traffic The new shop unit on the corner of the Car Park Site would be large enough for a small supermarket or other large store, with a dedicated service yard to the rear for deliveries Belisze Road / Abbey Road junction today Examples around the area of how the shops could look like At Home in the Abbey Area Examples of how new shops could use the new public spaces Abbey Co-op Estate Regeneration Exhibition Camden Community Facilities 9 Artists impression of view of the new community buildings and new public spaces around the base of the towers Tower Concierge: Option 1 Medical Centre could be located at first floor to maintain privacy for visitors Community Centre Health Centre Communal Entrance Foyer Proposed first floor showing community spaces Single storey building with a community centre and a small new cafe Separate new entrances to existing towers formed 24hr concierge located to either tower with remote cameras / access control for other tower (subject to cost) New pedestrian entrance to the open space behind the towers formed to the side of Casterbridge on Belsize Road. This would be gated at night. Tower Concierge: Option 2 2-storey building with a community centre, a health centre, a small café and a pharmacy Entrances to both towers, the community centre and the health centre all accessed from a communal glazed foyer space 24hr concierge located in foyer space serving all 3 uses (subject to cost) New entrance to the open space as option 1, with access to the open space also possible through the glazed foyer during the day Tower Concierge: Option 3 Separate 2-storey buildings Community centre / café in one building with a health centre / pharmacy in the other 2 separate entrances formed to the tower blocks as Option 1, but entrances located opposite each other so that a concierge on one side overlooks an entrance on the other New canopy added over the gap between the new buildings to form a gateway linking the square to the open space. This would be gated at night Key Issues: Community Facilities Community Centre could be located at ground floor with private outdoor spaces to the rear for a crèche and/ or nursery. Both community buildings could be accessed via a shared central glazed foyer which also opens out onto the green space Community Centre: The existing community centre would be replaced by a new centre built on the estate. This would be designed to provide at least the same quality of services as the existing buildings, and potentially could be larger to provide additional services The preferred location for the new centre would be at the base of the towers, subject to further consultation with residents Health Centre: The existing health centre could be re-provided in the area, but any decision as to what type of facility this might be, or whether this would be located on the estate or elsewhere in the area would not be made until 2011 at the earliest. School provision The new homes would house up to 80 additional children . This equates to an average of 5 additional children per year group (e.g. 80 ÷ 16 = 5) A financial contribution would be made to cover the costs of providing additional school places for this number of children. The Council is currently in the process of formulating plans to assess how best this could be spent on schools in the area Community Centre Health Centre Communal Entrance Foyer Proposed ground floor showing community spaces At Home in the Abbey Area Examples of new community buildings and common foyer areas Abbey Co-op Estate Regeneration Exhibition Camden Public Spaces 10 Artists impression of view looking across the new public space towards the new community buildings with the new entrance to the green space visible behind Ab be New public spaces could be created either side of Abbey Road. New traffic calming would reduce traffic noise and street trees would provide both shade and help screen noise from seating areas reaching existing flats in the towers above. The activity in these spaces would also help to make the entrance areas to the towers safer. yR oa d New outdoor space by shops would be partially shaded but designed for short term activities with trees and benches, but could be large enough for temporary cafe seating d e Proposed section looking north along Abbey Road through the new public space showing new outdoor areas Existing towers force wind down towards the ground making it difficult to enter towers or use the street level space between them Creating either new buildings or horizontal canopies above ground level deflects the wind making it easier to enter the towers and allowing the areas at ground level for cafe seating etc. Examples of how busy roads can be made much safer for pedestrians by introducing new crossing areas / central strips At Home in the Abbey Area New outdoor space in front of community buildings would catch the sun all day, and would be large enough to allow spill out seating for a local cafe / restaurant iz s l e a Ro B Proposed new public spaces created around the road junction Key Issues: Public Spaces New traffic calming measures would be added around the road junction to slow traffic speeds which would increase traffic safety, and also make it easier and safer for pedestrians to cross between the new shops and community facilities These would include introducing pedestrian only strips in the centre of the roads allowing pedestrians to cross more safely in 2 stages when traffic is moving slowly The existing bus stops would be retained but repositioned to make them easier to use with more room to wait without obstructing pavements New buildings around the base of the towers and the new street trees planted around the road junction would help cut down wind speed, noise and pollution making the new pedestrian areas suitable for outdoor seating Existing trees would be retained wherever possible with new street trees planted to provide shade and screen noise from the new public space to residents living in flats above Diagrams showing how building new buildings around the base of the towers will help reduce wind speeds at ground level Abbey Co-op Estate Regeneration Exhibition Camden Open Space & Play Facilities Ab be yR Possible jogging track running around the periphery of the open space oa 11 Play spaces and active open spaces d d oa R ze Quieter seating areas for older people si Bel Private communal courtyards to individual residential blocks access only by the residents who look onto them – possible play areas and spaces – quieter seating areas – routes for walking and strolling along pleasant planter beds a ilw Ra If the car park was moved this area could be landscaped as a prominent new sunny part of the open space or even a new play area y be Ro e a Ro Ab New main entrance into the open space. This could be between both the towers or to the side of Casterbridge. All entrances to the open space would be gated at night for security d iz els ne i l y New gated pedestrian entrance into the open space off Belsize Road ad B St ab airs ov to e fla r uffe ed b lant ly p hick Quiet seating area en t Raised planter bed to define courtyard space and separate space and separate vehicular access route to housing on western edge Timber deck u hic Ve R s nit u ail et lar s es c ac Active open area Public space along Abbey Road Raised planter bed to define courtyard space Gre Bac k Terr garde ace ns t o Prio ry Play area ts Proposed landscape plan of Abbey Co-op Estate following redevelopment D e iz els A RO B Shops screened off from courtyard. No access to shops New Infant Play Area New Formal Play Area Upgraded of Existing Informal Play Areas Proposed plan showing new play spaces on the Abbey Co-op estate Possible layout of a new private courtyard Key Issues: Open Space and Play Facilities There would be an overall increase in open space in the area following redevelopment through the provision of new private courtyards behind the new buildings These would also have new play areas in them to provide for younger children in the new buildings The existing public open space area behind Snowman and Casterbridge would be retained and improved with new play facilities and the existing car parking area opened up as part of the green space The open space would primarily be designed for use by both the existing and the new residents on the estate. It would remain a public area as the existing space is, and so would also be open to the general public This could include the relocation of the existing car parking area behind Snowman house which would improve the open space, but would mean the car park would be accessed off a busy road. Any parking area would still provide the same number of parking spaces as existing Examples of high quality private residential courtyards like those proposed behind the new buildings for use just by residents At Home in the Abbey Area Examples of different types of play spaces. Some of these would be in the private courtyards, with others in open space behind the towers Abbey Co-op Estate Regeneration Exhibition Camden Parking & Deliveries A planting buffer could be added along the boundary for security to adjacent houses, with trees helping to visually screen cars from the flats above Ab be yR 12 Alternative location for parking area to the north side of Snowman House. This would mean access to the car park would be off a busier road, but would make the open space more visible from the road, and allow residents to make better use of the sunnier part of the open space where the existing car park is located. oa d P Bus stops all located outside of new public space to keep this uncluttered d P oa R ze si Bel Out of hours servicing lane for retail units e.g.. early AM or late PM deliveries only ne li ay ilw Ra Existing car park location could be retained, but car park currently blocks views and access to the open space from Belsize Road and occupies an area which could be made into a sunny new open space. Communal green courtyards at ground level only for amenity space. No parking provision within courtyards Bus P Bus Stop On-Street Pay & Display Parking On Street Resident Permit Parking Bike Parking Stand y be P Estate residents only car park P Estate residents only car park (underground) ad Ro New covered service yard formed at ground level to serve retail units on corner of block, with landscaped courtyard for flats built above Ab New underground parking Ro area created by re-using e z i ls basement of existing e B buildings. This would be the only new car parking for all the new buildings Proposed parking plan for the Abbey Co-op Estate following redevelopment ad Proposed section through new buildings on Car Park Site showing covered service yard and entrance to underground resident car park Key Issues: Parking & Deliveries All existing on-street parking spaces, drop off-bays, and parking spaces to Snowman and Casterbridge and the Community Centre would retained and/or relocated Up to 70 parking spaces for the new homes would be provided in an new underground car park on the car park site, including new wheelchair parking spaces These 70 new spaces would replace approximately 250 car parking spaces currently in the car park building, meaning there would be much less traffic using the estate overall if it was redeveloped New residents would not be eligible for street parking permits in the area All new homes would also be provided with a secure place to park a bicycle Existing car park cuts off access to open space from road and could create a new sunny part of the open space if relocated. New underground car park could be naturally lit from above / or from the side making it feel lighter and safer At Home in the Abbey Area View of possible new location for car park behind towers Abbey Co-op Estate Regeneration Exhibition Examples of upgraded street parking combined with tree planting Camden Local Lettings Policies Council tenants who need to move because of the regeneration: Will get priority for any new homes that are built. It is anticipated that the majority of tenants will only have to move once. Where a temporary move is necessary tenants will be able to return to a new property on the Abbey Co-op Estate. If they wish to move away from Abbey Co-op, tenants will get extra priority when bidding for homes on the Choice Based Lettings Scheme. Will be entitled for moves both within and outside the Abbey Area to be offered a home of the size needed as measured by Camden’s bedroom standard. This means that those currently living in bedsits, will be entitled to move into a one-bed home. Homeloss payment- tenants who need to move because of the regeneration programme will be entitled to receive a statutory Home Loss Payment £4700. We hope to avoid the need for any temporary moves but in cases where tenants are required to move temporarily prior to taking up a new permanent home, disturbance payments will be paid for each move and covers: – The cost of removals. – The cost of disconnection/re-connection of washing machines, telephone lines, satellite or terrestrial television aerials (but only in cases where authority to erect the aerial / dish was obtained from the Council. – Any costs for redirection of mail and the cost of informing service providers of change of address (doctors, dentists, banks etc) – Legal costs. – Transport costs relating to schools where a tenant moves temporarily. 13 Leaseholders who need to move because of regeneration: Will receive priority to purchase new homes that are built, either on an outright or shared ownership basis. Will be offered full market value for the purchase of their property. Compensation for home-loss at 10% of the value of the property to a maximum of £75,000. Disturbance payments to cover removal costs, legal and surveyors fees, and stamp duty on a new property where this is purchased within one year of the repurchase. Leaseholders in financial hardship may be able to benefit from a discretionary scheme allowing leaseholders to convert to a secure Council tenancy – in these circumstances the Council would only offer around 37% of the market value of the leaseholder’s current property. Where the leaseholder has not been in occupation for minimum of one year prior to the resolution to purchase on the following terms: Full market value for the property. Compensation for basic loss at 7.5% of the value of the property to a maximum of £75,000. Legal and surveyors fees. We will work with individual leaseholders to give them opportunities to buy properties, either outright or on a shared ownership basis, in any new development. Tenants not directly affected, but in housing need: Future lettings: Many residents living at Abbey Co-op will not be directly affected by the building of new homes (i.e. they won’t need to move home). However we know that there are residents who need to move, or would like to move because their current home is either too small or too large for their needs. In these circumstances residents may be able to apply to receive extra points that will enable them to bid for new properties that are built in the area. In this way residents living on the estate will be able to share directly in the benefit of new homes being built. The Council has a sustainable estates policy, which means that households with drug, alcohol or mental health problems are not considered for bed-sit and 1 bedroom properties on some estates. If this was considered relevant, this policy could potentially apply to any new homes for rent to be managed by Abbey Co-op. A new set of local lettings criteria could also be implemented that would cover the existing homes and the new homes. Practical help: Please note: All tenants and leaseholders who are directly affected will be visited at home at least 12 months before moving to discuss housing needs and preferences, and to discuss removal and compensation arrangements. The Council will arrange help with packing for vulnerable, elderly and disabled tenants, where needed, and will provide help during the removal process and settling-in period for those vulnerable tenants who need it. Care packages for tenants currently receiving health and/or Social Services support will be co-ordinated by the Council so that they continue after residents move into their new home. The Council will assist those not directly affected to apply and bid for new homes being built on the estate. At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition This is the same wording that has been previously circulated to Abbey Co-op residents. The above policy is still under discussion with the Council’s Allocations team- initial discussions about some element of ring-fencing of new stock for those in housing need current living on the estate could be possible – how would this work in practice is still under consideration, and this will also require further discussion with the Abbey Co-op Management Committee. Camden Questions raised during the consultation 14 Why does this need to happen? We want to provide a sustainable community for all. Currently there is a shortage of housing and funding for decent homes work. The development of the car park, and potentially other areas, could produce funding for decent homes improvements. It will also provide a high quality building which contributes to the community and creates a vibrant neighbourhood, which suits the needs of local people. How will the new buildings be paid for? The scheme does not rely on separate government funding to build the new affordable housing or improvements to the public spaces, which would be paid for through the sale of some of the new homes. The current proposals have also been tested by independent consultants and Council officers to check its viability. Why do the new buildings need to be so high? The proposed heights of the buildings are largely set by the amount of new affordable housing the Council wish to provide and the need to generate funds for Decent Homes improvements to the homes retained on the estate. The buildings could only be made lower if either these are reduced, or the quality of the new homes is reduced (by creating more single aspect homes (e.g.. without natural ventilation)) Will the new buildings overshadow my windows or garden? The new buildings are likely to have some overshadowing affect on surrounding buildings, but any planning application would have to clearly demonstrate that this affect is within national guideline limits. The height of the proposed buildings currently reduces near the existing buildings on Belsize Road and Priory Terrace to reduce any impact on these properties. What will happen to the existing link bridges? These would be removed under the current proposals, including the bridge over the railway. Could the new courtyards on the Car Park Site face the road instead of the railway? This option would mean that more of the new homes would be nearer the railway and any communal outdoor space, including play areas for younger children would have to face the road and so would have much less privacy. How many of the new homes will be for private sale? In the current proposals 151 of the 265 proposed new homes would be for private sale Will there be a lift to my new home? Massing options explored during development of Option B(1) since the last public exhibition The current proposals assume a lift will be provided to all new homes above ground level. Will my new home have more bedrooms? All existing residents affected by demolition will be offered a new home within the new development which would be allocated on your existing housing needs, not the size of your existing home. Who will manage the new homes? This has not been decided yet, but the Council is currently in discussion with the Abbey Co-op to see if they would like to manage the new affordable homes, and potentially other areas of the new development. What are the options for the location of the Community Centre? The location of the new community centre has not yet been agreed. The location shown is the existing centre’s preferred location but other locations could be looked at. What facilities will the community centre provide? As a minimum the new community centre building would provide a similar range of facilities as the existing centre, but this could be expanded if there was interest in providing a wider range of services (subject to funding being available), such as somewhere to hire for children’s birthday parties etc. What happens to the proposed new community building if the health centre moves off the estate? Any planning application will include options for the community building both with, and without a health centre on the site. This will generally mean a smaller and/or lower building near the towers without a health centre. I like the way the existing towers look. Can any new buildings near Snowman and Casterbridge be separate from the towers? If the new buildings were separated from the towers this would not stop the existing problem of high wind speeds at the base of the towers making the area around them Public Space studies during development of Option B(1) since the last public exhibition difficult to use, and is likely to make this problem worse by creating smaller gaps between the buildings. This would restrict the way any new buildings could use the outdoor space around them, such as providing outdoor crèche areas for a community building or outdoor seating for a new cafe. Will the shops and community buildings create noise problems for the flats living above them? The new shops and community buildings will be designed to minimize noise affecting those living nearby. This could be achieved by recessing the shop fronts and/or adding horizontal canopies to the shop fronts so that the new homes above overhang the shops to deflect any noise; and by planting a canopy of street trees to filter any noise from any outdoor seating areas created in front of the new buildings Will the new homes increase the existing parking problems in the area? Competition for existing on street parking spaces would not be affected by the redevelopment as new residents would not be able to apply for resident parking permits for on-street parking bay. Parking for new residents would be provided in an underground level on the Car Park site instead. Will the new traffic calming increase congestion? The new traffic calming measures would only slow traffic around the junction, and so would have a minimal impact on overall congestion, but would make it safer and easier for pedestrians to cross between the new shops and community facilities What impact will the development have on schools in the area? The current proposals would mean approximately 5 extra children per year group attending schools in the local area. A financial contribution would be made as part of any development which would be used to fund improvements to local schools, but no decision has been made yet as to how or where this would be spent How can you be sure the quality of the development will be high enough? If a planning application is made for the scheme, it will include a ‘Design Code’ which will define the quality of key areas of the scheme. What this will cover has not been decided yet, but it could include the quality of materials used; minimum flat size; minimum standards of sound proofing, daylighting, and natural ventilation (e.g.. dual aspect) for new homes; maximum number of homes sharing a lift on each floor etc. Will the redevelopment provide benefits for the other estates in the area? Benefits to the other estates in the area will largely be determined by the size of the new buildings and the number of new affordable homes built. Final decisions on these have not been made by the Council, but benefits provided by the current proposals are largely to the Abbey Co-op Estate When would construction start and how long would this last? No decision on when to start construction has been made. The existing car park building would form the first phase of any redevelopment. Construction would not start on this site until mid 2012 at the earliest, with new homes potentially becoming available in 2014. At Home in the Abbey Area Abbey Co-op Estate Regeneration Exhibition Consultation model / plans using during development of Option B(1) Camden What is happening next? Project team develop design of Council’s preferred option 15 Series of consultation events focusing mostly on the residents/ stakeholders most affected Public exhibition preferred option Council review exhibition feedback Project team finalise designs based on council comments Council submits outline planning application Planning process designs open for public comment Planning committee make decision on planning application What is happening next The information on these boards will form part of a public exhibition for the project which will be on display in the Abbey Hive between 22-27th November Following this exhibition, Camden will review all comments made on the current proposals to date, and these comments will be discussed with your local Kilburn Ward councillors who will make a recommendation as to what to do next to Camden Council’s Cabinet Committee in December 2010 The Council’s Cabinet Committee will then make a decision on whether to proceed or not with the scheme If the Cabinet decide to proceed further with the scheme, the proposals are then likely to be developed further and an outline planning application submitted for the scheme The planning application would be made public, so that anyone can have their say on the application The earliest an application could be made would be in late January 2010, and it would take approximately 4 months for the council to make a decision on the planning application At Home in the Abbey Area Outline Planning Applications An Outline Planning Application covers limited details for a new development, to allow further details to be decided at a later date If an Outline Planning Application is submitted for the scheme, it is likely that it would only cover the overall size and shape of the new buildings; the number of new homes and amount of new commercial and community space; and the location of parking and delivery areas for the new buildings. It is unlikely to cover what they would be made of, what they would look like, or the landscape design of the spaces around them Camden would also submit a ‘Design Code’ as part of any outline application. This would contain information on other issues which are felt to be important for the success of the scheme but are not covered in the application drawings, such as design quality; design features for new homes (such as flexible layouts); landscape design features etc. Camden would like to hear your views on what should be included in the ‘Design Code’ as part of this consultation. Please include any comments you may have on the feedback forms provided Abbey Co-op Estate Regeneration Exhibition How the Council makes its decision Any decision to proceed with a planning application will be made by the Council’s Cabinet Committee The Cabinet is made up of the Leader of the Council and nine other councillors (called Cabinet Members) chosen by the Full Council. The Cabinet meets eight times a year. All Cabinet decisions must be taken in public apart from exceptions for things like personnel matters, commercially sensitive information or confidential legal advice. Even where a decision is taken by an individual Cabinet councillor this is done at a public meeting with publicly available agendas and reports. Officers are not able to put decisions into practice until the seven-day ‘call-in’ period has elapsed (except for decisions taken under emergency procedures). The Cabinet is allowed by law to meet in private, but cannot take decisions in private or discuss in private session a matter on which a decision is to be taken in the next 28 days. Camden
© Copyright 2026 Paperzz