TRAINING WORKSHOP ON CONTAINERISATION TRENDS AND CUSTOMS CLEARANCE FOR REGULAR BLOCK TRAIN TRANSPORTATION BAKU – 17 APRIL 2012 Speech of National Secretary of Azerbaijan Intergovernmental Commission TRACECA Mr. Akif Mustafayev & SCANDINAVIA, BALTICS & RUSSIA NORTH ASIA EUROPE Black Sea Caspian Sea Bosporus Mersin Mediterranean Sea SOUTH NEAR EAST PERSIAN GULF GEORGIA BOYUK KESIK RUSSIAN FEDERATION KAZAKHSTAN BAKU REPUBLIC OF AZERBAIJAN ALYAT SEA PORT CASPIAN SEA TURKMENISTAN ISLAMIC REPUBLIC OF IRAN ILYICHEVSK CASPIAN SEA POTI MARABDA BOYUK KESIK BATUMI AKHALKALAKI ISTANBUL KARS ALYAT SEA PORT PRESIDENTS OF AZERBAIJAN, GEORGIA AND TURKEY AT THE SOLEMN OPENING CEREMONY OF THE CONSTRUCTION OF BAKU-TIBILISI-KARS RAILWAY СONSTRUCTION OF BAKU-TIBILISI-KARS RAILWAY СONSTRUCTION OF BAKU-TIBILISI-KARS RAILWAY CASPIAN SEA AKHALKALAKI KARS MARABDA BOYUK KESIK ALYAT SEA PORT • The completion of the construction of Kars–Tbilisi–Baku railway is expected by the end of 2012. The railway is 98 km long, with 68 km within Turkey and 30 km within Georgia. • By this time, the reconstruction of 503 km long Baku-Georgian border railway route will also be carried out. • Thus the region of Middle and Central Asia will be for the first time connected by direct rail links without transshipment through Azerbaijan, Georgia and Turkey to Europe. • Railway trains moving from China and Kazakhstan through Central Asia, the Caspian region, Baku and Tbilisi will be able to get to Istanbul and then proceed to Europe through the Bosporus tunnel. REPUBLIC OF AZERBAIJAN BOYUK KESIK BAKU ALYAT • The new Baku International Sea Trade Port Complex will be constructed in three stages. • An important feature of the future port is an international logistics center, as proposed by the EU TRACECA project "International Logistics Centers for Western NIS and the Caucasus". • The port plans to build 11 ferry bridges, six of which will be built in the first stage until 2014. • The construction of the port, which is supposed to meet international standards, will be completed in 2015. International Eurasian transport corridors TRACECA - 4577 km (main axis). North-South - 6978 km (on the territory of Russia) + 5853 km branch lines; Trans-Siberian Railway - 9200 km (on the territory of Russia) + 17732 km branch lines; Southern Rail Corridor - 11 700 km (main axis). TRACECA: Eastern Europe - Central Asia via the Black Sea, the Caucasus and the Caspian Sea, Aktau - Dostyk: The distance from the port of Poti to the railway station Boyuk-Kesik is 395 km; The distance from the railway station Boyuk-Kesik to Baku is 503 km; The distance from Aktau to Baku by sea is 468 km; The distance from Aktau to Dostyk is 2878 km; The distance from Baku to Istanbul is 2512 km. The distance from the border crossing between Kasakhstan and China (Dostyk) to the border between Georgia and Turkey is 4244 km; The distance from the border crossing between Kasakhstan and China (Dostyk) to Istanbul is 6756 km; The distance from Bulgaria to London is 2304 km. The distance from the border crossing between Kasakhstan and China (Dostyk) to London is 9060 km.
© Copyright 2026 Paperzz