APPROACH 6" SOLID WHITE EDGE LINE ROAD (TYP.) TAPER TRAFFIC FLOW DIAGRAM 4" BROKEN YELLOW LINE INTERSECTION WITH RIGHT TURN TAPER APPROACH ROAD TRAFFIC FLOW DIAGRAM 4" SOLID WHITE 6" SOLID WHITE LINE 25’ EDGE LINE ONLY 6" SOLID WHITE EDGE LINE ARROW & LEGEND MARKINGS (SEE NOTE 2) 4" BROKEN YELLOW LINE INTERSECTION WITH RIGHT TURN LANE Notes: 1. Paint intersection tapers greater than 50 ft in length. 2. Arrow and legend markings should be installed according to PAVE-900, PAVE-935 and PAVE-94O, if applicable. DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION Kirk T. Steudle BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR Michigan Department of Transportation PAVEMENT MARKINGS FOR PREPARED APPROVED BY: DIRECTOR, BUREAU OF FIELD SERVICES BY NON-SIGNALIZED INTERSECTIONS DESIGN DIVISION DRAWN BY: LMF CHECKED BY: JGM 01/20/12 APPROVED BY: DIRECTOR, BUREAU OF HIGHWAY DEVELOPMENT F.H.W.A. APPROVAL 10/18/11 PLAN DATE SHEET PAVE-930-B 1 OF 8 6" SOLID WHITE EDGE LINE (TYP.) 4" SOLID WHITE LINE 25’ TRAFFIC FLOW DIAGRAM 4" BROKEN YELLOW LINE APPROACH ROAD "T" INTERSECTION WITH PASSING FLARE 4" SOLID WHITE LINE TRAFFIC FLOW DIAGRAM 75’ MIN. 6" SOLID WHITE ONLY EDGE LINE 4" SOLID DOUBLE YELLOW LINE 6" SOLID WHITE EDGE LINE ARROW & LEGEND MARKING (SEE NOTE 2) 4" SOLID DOUBLE YELLOW LINE APPROACH ROAD "T" INTERSECTION WITH MANDATORY LEFT TURN LANE Notes: 1. Paint intersection tapers greater than 50 ft in length. 2. Arrow and legend markings should be installed according to PAVE-900, PAVE-935 and PAVE-940, if applicable. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION. 10/18/11 PLAN DATE SHEET PAVE-930-B 2 OF 8 APPROACH ROAD 4" SOLID WHITE LINE TRAFFIC FLOW DIAGRAM 6" SOLID WHITE EDGE LINE (TYP.) 25’ 4" BROKEN YELLOW LINE APPROACH ROAD FULL INTERSECTION WITH PASSING FLARE APPROACH ROAD 4" SOLID WHITE LINE TRAFFIC FLOW DIAGRAM 75’ MIN. 6" SOLID WHITE ONLY EDGE LINE 4" SOLID DOUBLE YELLOW 6" SOLID WHITE 4" SOLID DOUBLE YELLOW LINE EDGE LINE ARROW & LEGEND MARKING (SEE NOTE 2) APPROACH ROAD FULL INTERSECTION WITH MANDATORY LEFT TURN LANE Notes: 1. Paint intersection tapers greater than 50 ft in length. 2. Arrow and legend markings should be installed according to PAVE-900, PAVE-935 and PAVE-940, if applicable. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION. 10/18/11 PLAN DATE SHEET PAVE-930-B 3 OF 8 APPROACH ROAD 4" BROKEN WHITE LANE LINE (TYP.) TRAFFIC FLOW DIAGRAM 25’ 6" SOLID WHITE 4" SOLID DOUBLE YELLOW LINE EDGE LINE 25’ D/4 D W4-2R APPROACH ROAD FULL INTERSECTION WITH FAR SIDE LANE DROP APPROACH ROAD TRAFFIC FLOW DIAGRAM 6" SOLID WHITE EDGE LINE (TYP.) 4" BROKEN YELLOW ONLY ONLY LINE 4" SOLID DOUBLE 75’ MIN. YELLOW LINE APPROACH 4" SOLID WHITE LINE ROAD ARROW & LEGENDS MARKINGS (SEE NOTE 1) FULL INTERSECTION WITH PARTIAL FLARE WITH DEVELOPED CENTER LEFT-TURN LANE (MAJOR CROSS STREET) NOTE: 1. Arrow and legend markings should be installed according to PAVE-900, PAVE-935 and PAVE-940, if applicable. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION. 10/18/11 PLAN DATE SHEET PAVE-930-B 4 OF 8 APPROACH ROAD 4" SOLID YELLOW LINE 4" SOLID DOUBLE YELLOW LINE TRAFFIC FLOW DIAGRAM 6" SOLID WHITE EDGE LINE (TYP.) 4" BROKEN YELLOW LINE (TYP.) APPROACH ROAD 4" BROKEN YELLOW LINE FULL INTERSECTION PARTIAL FLARE WITH DEVELOPED CENTER LEFT-TURN LANE - CONVENTIONAL MARKINGS ( MINOR CROSS STREET) APPROACH ROAD 4" SOLID YELLOW LINE (TYP.) 4" SOLID DOUBLE YELLOW LINE (TYP.) TRAFFIC FLOW DIAGRAM 6" SOLID WHITE LINE (TYP.) LEFT TURN ARROW MARKING (OPTIONAL) 4" BROKEN YELLOW LINE APPROACH ROAD 4" BROKEN YELLOW LINE (TYP.) FULL INTERSECTION PARTIAL FLARE WITH DEVELOPED CENTER LEFT-TURN LANE - ALTERNATE MARKING ( MINOR CROSS STREET) NOTE: Arrow and legend markings should be installed according to PAVE-900, PAVE-935 and PAVE-940, if applicable. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION. 10/18/11 PLAN DATE SHEET PAVE-930-B 5 OF 8 RESIDENTIAL DRIVEWAYS AND OR MINOR COMMERCIAL DRIVEWAY 6" SOLID WHITE EDGE LINE (OPTIONAL IN CURBED AREAS) 4" SOLID YELLOW LINE 4" BROKEN YELLOW LINE 4" BROKEN WHITE LANE LINE MAJOR MINOR STOP COMMERCIAL DRIVEWAY CONTROLLED INTERSECTION STRIPING THROUGH MINOR (STOP CONTROLLED) INTERSECTIONS AND DRIVEWAYS 6" SOLID WHITE 6" SOLID WHITE EDGE LINE EDGE LINE 4" SOLID (OPTIONAL IN CURBED AREAS) (OPTIONAL IN CURBED AREAS) YELLOW LINE 4" SOLID YELLOW LINE 4" DOUBLE SOLID 4" BROKEN YELLOW LINE YELLOW LINE 6" SOLID WHITE 6" SOLID WHITE EDGE LINE EDGE LINE (OPTIONAL IN CURBED AREAS) 4" DOUBLE SOLID (OPTIONAL IN CURBED AREAS) 4" BROKEN YELLOW LINE YELLOW LINE GAPPING INTERSECTIONS AT MINOR (STOP CONTROLLED) STREETS NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION. 10/18/11 PLAN DATE SHEET PAVE-930-B 6 OF 8 4" BROKEN YELLOW LINE STOP BAR - OPTIONAL FOR STOP CONTROLLED (EXACT LOCATION TO BE DETERMINED BY THE ENGINEER) STOP BAR DETAIL (TRUNKLINE TO TRUNKLINE "T" INTERSECTION) Notes: 1. The width of stop bars shall be 24 in. 2. Stop bars should be placed between 4 ft and 30 ft from the nearest edge of the intersecting roadway. 3. To minimize vehicle exposure time, stop bars should be located as near the intersecting roadway as practical. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION. 10/18/11 PLAN DATE SHEET PAVE-930-B 7 OF 8 APPROACH ROAD STORAGE 25’ T ONLY ONLY ONLY TRAFFIC FLOW DIAGRAM ONLY STORAGE 75’ MIN 4" SOLID WHITE LINE APPROACH ROAD POSTED SPEED 35 75 40 100 45 130 50 180 55 225 RIGHT AND LEFT TURN LANES ON THE SAME APPROACH Note: Arrow and legend markings should be installed according to the layouts shown on PAVE-900, PAVE-935 and PAVE-940, if applicable. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION. 10/18/11 PLAN DATE SHEET PAVE-930-B 8 OF 8
© Copyright 2026 Paperzz