LINE 1 – IN EXECUTION URBAN LINE CANOAS, BRAZIL LOCATION CONTRACTOR STATUS Canoas Canoas City Hall Implementation stage TRANSPORTATION CAPACITY STATUS Six vehicles (300 passengers each) Public Line for Commercial Operation SOLUTION FOR QUICK TRAFFIC The first application of the Aeromovel System focused on urban traffic was developed for Canoas, a city in the metropolitan region of Porto Alegre, in the south of Brazil. It is an important complement to other means of transportation, as it goes in the north-south x south-north direction. The local train, which runs in the east-west x west-east direction, is then supplemented by the Aeromovel. As soon as implemented, it will become the main vehicle of transportation of the city. This system, which was contracted in 2015, is part of a plan which aims at the reformulation of the city traffic in Canoas. By the deployment of the technology, there will be a reduction of 30% in commutation time between the areas of Guajuviras and the Downtown. It is expected to take only nine minutes, while currently this same journey by bus takes up to 40 minutes at busy times. LINE 1 (HIRED/IN CONSTRUCTION) EXPANSION BR-116 ROUTE LINE LINE 1 SPECIFIC TABLE – IN EXECUTION The Aeromovel in Canoas predicts a route that, in all its extension, will have 18 kilometers of lines, passing through 26 stations. The expected capacity is to carry up to 12,000 passengers per hour at busy times and 82,000 per day. Line extent 4,6 km Minimum radius 40 m The project plans the construction of two main lines. The East-West Line will have 12 kilometers and will go through 17 stations. The North-Downtown Line will connect the Lutheran University of Brazil (Ulbra) to downtown, going through nine stations over a six kilometers path. Maximum slope 3,0% Vehicles/Capacity 6 vehicles/ 300 passengers each Maximum speed 65 km/h The first project, under construction, will have 4.6 km and will include seven stations from the Military Police, on April 17 Avenue (Guajuviras) up to Mathias Velho train station. Propulsion 6 propellers of 500 kW each Route configuration Double lane Number of stations 7 Information source: Canoas City Hall/ July, 2016 aeromovel.com.br
© Copyright 2026 Paperzz