New HCAL beam plug and additional shielding Michal Galka, Burkhard Schmidt December 20, 2016 1 Present status of the design • All components of the additional shielding have been designed in detail within CATIA in the last 3 months, and production drawings have been prepared. • In particular the additional shielding behind HCAL required the implementation of the HCAL design in CATIA, which was not done in the past. HCAL beam plug with beam-pipe when the C-side is closed (2014) • Large clearance between beam-pipe beam plug for both the HCAL and ECAL beam-plugs. • The reason is mainly that space had been foreseen for the bake-out instrumentation, which is however not permanently installed. • The beam-plug under M2 goes much closer to the bake-out instrumentation and the beam-pipe. 3 HCAL beam plug with beam-pipe when the C-side is closed 30mm 45 mm ~85 mm 1. 2. 3. • Clearance of 25mm - 45mm between beam-pipe beam plug for both the HCAL and ECAL beam-plugs. • The HCAL beam-plug has three parts (although it has been molded in one piece). The part close to M2 would need to be modified (in material and in radius). 4 HCAL beam plug with beam-pipe when the A-side is closed (2016) 74 mm 85 mm • Values for the clearance are not the same as on the C-side • We had overlooked so far that the beam-plug is topbottom asymmetric • A single plug made of lead is our preference 5 Design for shielding behind HCAL • The shielding behind HCAL has been implemented in CATIA , based on production drawings for the HCAL modules. • Total weight of tungsten shielding per side: 410kg The intention is to verify ones more all HCAL related dimensions in the cavern next week and to finalize the design then. The cost estimation with a potential supplier for tungsten is in progress Back side of HCAL We consider to cut this piece in order to ease the installation of the additional shielding 7 On the right side it is shown for another module Conclusions and next steps The EDR for the shielding and the beam plugs is scheduled for January 18, 2017 at 14:00 in 20-1-004 Gloria Corti and Yuri Guz agreed to act as reviewers We met end of November with the vacuum group, where the suggested dimensions for the HCAL plug and the procedure has been approved – Finalize and document the engineering design Requires some measurements of dimensions next week The production drawings for the new beam plugs are done and need to be checked – Some simulations need to be redone In particular important for the final choice of material At the same time we should implement the realistic design of the additional shielding behind HCAL (and update the beam-plug design (work mostly done by Robert Paluch) – Finalize the note summarizing the performance of the shielding – Document the procedure for HCAL closing 8 Backup 9
© Copyright 2026 Paperzz