Bas Audit checklist for BELGIAN outdoor Hockey infrastructure Nbr Date Date of installation + FIH Licensed Manufacturer + type = Last FIH approval = ARBH - KBHB regs in Italic BLUE Last ARBH - KBHB approval = Description Conformity PITCH SURFACE 1 2 3 4 5 91.4 x 55 m run-off sideline min 1 m carpet + 1 m unobstructed ( 3 + 1 recommended ) run-off backline min 2 m carpet + 1 m unobstructed ( 3 + 2 recommended ) carpet joints: stitch gauge + 2 mm max LINES 6 7 8 9 10 11 12 13 14 15 16 lines 7.5 cm wide, in white 2 lines at 22.9 m from each back-line penalty spots 6.475 m from inner edge of goal-line, 15 cm diameter lines 30 cm outside the pitch on side-line at 14.63 m from & parallel to the outer edge of back-lines lines 30 cm outside the pitch on side-line with further edge at 5 m from & parallel to the outer edge of back-lines lines 30 cm outside the pitch on side-line on both sides of goals at 5 & 10 m from outer edge of goal-post 4 lines 15 cm, outside the pitch at 1.83 m from back-lines centers circle center-line straight 3.66 m at 14.63 m from outside back-line quarter-circles centered inside corner of goal-post broken lines with outer edge at 5 m outsie circle-lines 4 non-dangerous flag-posts 1.2 to 1.5 m high, flags ≤ 30 cm width & length GOALS 17 18 19 20 21 22 23 3.66 x 2.14 m inner bars cross-section 5 cm wide & 5 to 7.5 cm deep min depth above = 90 cm, below = 1.2 m side-boards 46 cm high & min 1.2 m long, dark color inside back-boards 46 cm high & 3.66 m long, dark color inside max net mesh 4.5 cm max net attachments distance 15 cm Any horizontal part of the net support frame across the back or sides of the goal must be outside the net and fixed in such a way that a ball entering the goal cannot rebound from it IRRIGATION ( where needed ) 24 1 full cycle = 8 min max 25 dishes every 10 m, avg 3 mm collection, 2 mm min 26 water permeability ≥ 150 mm / h LIGHTING ( non - televised ): control = 10 x 10 m @ 1.5 m height 27 28 29 30 DIVISION Honneur et Division 1 Division 1 (2015-2016) Autres divisions 2016-2017 Eh avg = 300 lux, Eh min = 210 lux TECHNICAL AREA 31 area in line with center-line, min 2 m from pitch sideline 2 TEAM BENCHES ( within Tech Area ) 2 dugout zones: min 10 m long, min 5 m from centerline, min 23 m from backline, 32 min 1 m from sideline 33 9 people by bench + space for equipment TECHNICAL TABLE ( within Tech Area ) Page 1 >4 >5 Bas 34 in line with center-line, min 2 m from pitch sideline 35 min 4 seats for suspended players 36 1st aid kit + defibrillator with user's guide SPECTATORS 37 recommended : safe & unobstructed viewing stand for 250 people MISCELLANEOUS 38 scoreboard + team names + countdown clock 39 TV tower: min 3 m high for 2 filming technicians 40 ? = cross if inappropriate / irrelevant Name & signature RBHA = Name & signature Club = CONCLUSIONS Terrain praticable jusqu'à quelles divisions? Points à améliorer: Points à verifier lors du prochain contrôle: Page 2 Bas voir ligne 63 Page 3 Bas A= b= Page 4
© Copyright 2026 Paperzz