Audit checklist for BELGIAN outdoor Hockey infrastructure Date

Bas
Audit checklist for BELGIAN outdoor Hockey infrastructure
Nbr
Date
Date of installation + FIH Licensed Manufacturer + type =
Last FIH approval =
ARBH - KBHB regs in Italic BLUE Last ARBH - KBHB approval =
Description
Conformity
PITCH SURFACE
1
2
3
4
5
91.4 x 55 m
run-off sideline min 1 m carpet + 1 m unobstructed ( 3 + 1 recommended )
run-off backline min 2 m carpet + 1 m unobstructed ( 3 + 2 recommended )
carpet joints: stitch gauge + 2 mm max
LINES
6
7
8
9
10
11
12
13
14
15
16
lines 7.5 cm wide, in white
2 lines at 22.9 m from each back-line
penalty spots 6.475 m from inner edge of goal-line, 15 cm diameter
lines 30 cm outside the pitch on side-line at 14.63 m from & parallel to the outer
edge of back-lines
lines 30 cm outside the pitch on side-line with further edge at 5 m from & parallel to
the outer edge of back-lines
lines 30 cm outside the pitch on side-line on both sides of goals at 5 & 10 m from
outer edge of goal-post
4 lines 15 cm, outside the pitch at 1.83 m from back-lines centers
circle center-line straight 3.66 m at 14.63 m from outside back-line
quarter-circles centered inside corner of goal-post
broken lines with outer edge at 5 m outsie circle-lines
4 non-dangerous flag-posts 1.2 to 1.5 m high, flags ≤ 30 cm width & length
GOALS
17
18
19
20
21
22
23
3.66 x 2.14 m inner
bars cross-section 5 cm wide & 5 to 7.5 cm deep
min depth above = 90 cm, below = 1.2 m
side-boards 46 cm high & min 1.2 m long, dark color inside
back-boards 46 cm high & 3.66 m long, dark color inside
max net mesh 4.5 cm
max net attachments distance 15 cm
Any horizontal part of the net support frame across the back or sides
of the goal must be outside the net and fixed in such a way that
a ball entering the goal cannot rebound from it
IRRIGATION ( where needed )
24 1 full cycle = 8 min max
25 dishes every 10 m, avg 3 mm collection, 2 mm min
26 water permeability ≥ 150 mm / h
LIGHTING ( non - televised ): control = 10 x 10 m @ 1.5 m height
27
28
29
30
DIVISION Honneur et Division 1
Division 1 (2015-2016)
Autres divisions 2016-2017
Eh avg = 300 lux, Eh min = 210 lux
TECHNICAL AREA
31 area in line with center-line, min 2 m from pitch sideline
2 TEAM BENCHES ( within Tech Area )
2 dugout zones: min 10 m long, min 5 m from centerline, min 23 m from backline,
32 min 1 m from sideline
33 9 people by bench + space for equipment
TECHNICAL TABLE ( within Tech Area )
Page 1
>4
>5
Bas
34 in line with center-line, min 2 m from pitch sideline
35 min 4 seats for suspended players
36 1st aid kit + defibrillator with user's guide
SPECTATORS
37 recommended : safe & unobstructed viewing stand for 250 people
MISCELLANEOUS
38 scoreboard + team names + countdown clock
39 TV tower: min 3 m high for 2 filming technicians
40 ? = cross if inappropriate / irrelevant
Name & signature RBHA =
Name & signature Club =
CONCLUSIONS
Terrain praticable jusqu'à quelles divisions?
Points à améliorer:
Points à verifier lors du prochain contrôle:
Page 2
Bas
voir ligne 63
Page 3
Bas
A=
b=
Page 4