H O WA R D S G R O V E S C H O O L D I S T R I C T AUDITORIUM AND CAPITAL IMPROVEMENTS REFERENDUM W HAT T Y PE OF R E F E R E N DUM I S BEI NG PROP O SE D ? Residents will vote on a $4.7 million referendum specifically for the construction of an auditorium with remaining funds going to address other capital improvement projects within our existing facilities and to upgrade and improve our technology infrastructure. W HAT I S I NC LU DED IN TEC H NOLO GY U P G R ADES? The technology upgrades include adding data storage, improving the wireless access points, updating the Network Core, and updating staff computers. W HAT I S I NC LU DED IN THE C APITA L MA I N T ENANC E PROJ EC T S? The capital maintenance projects will include replacing the remaining original windows at the High School, some asphalt repair at various buildings, the re-roofing of the maintenance shed, repair/replacement of aging maintenance equipment (lawn mowers, plow truck, auto scrubber), and other misc. projects. All of these projects will depend on remaining funds following the completion of the auditorium. Potential layout of auditorium and surrounding area Artist rendition of a potential auditorium WHY DO WE NEED AN AUDITORIUM? ○ Allows HGSD to offer a wider variety of Fine Arts opportunities ○ Allows HGSD to offer Technical Engineering and Industrial Arts opportunities ○ Allows HGSD to offer real-life business and event management opportunities to students ○ Allows the community access to quality performances, for all ages and interests, never before hosted in Howards Grove ○ Generates revenue for the district through rentals to outside groups ○ Attracts new families to the district through open enrollment and retains current students due to being able to offer what other schools all around us have as standard programming and facilities ○ Increases patronage to local businesses like gas stations and restaurants due to performances being held in Howards Grove ○ Allows the district more flexibility in scheduling due to no longer having to rent out space at Lakeland College or the Weill Center ○ Improves accessibility to events by students and attendees by allowing us to hold events locally in Howards Grove ○ Allows the district to provide a balance to a currently sports-centric district ○ Allows the district to host a variety of events that would appeal to many different generations of community members WHY NOW? The Howards Grove School District has an opportunity to add this referendum debt with minimal tax implications. The District has consistently seen a decrease in the mill rate over the past three years. Should this referendum pass, it is possible to see a minimal increase or even a flat tax rate in the levy. Regardless, the mill rate will stay well below the $10.00 mark. Additionally, the district has a robust financial position, which is a strength when compared with school districts nationwide. Our Moody rating is Aa3, which means we are rated as high quality and very low credit risk. Having a strong credit position will help us secure lower interest rates on any borrowing. The rating also reflects a strong socioeconomic profile with a limited tax base. Potential views of the inside of an auditorium including a possible art gallery space COST FOR TAXPAYERS Property Value Annual Expense Monthly Expense $75,000 $125,000 $175,000 $225,000 $275,000 $325,000 $375,000 $30 $50 $70 $90 $110 $130 $150 $2.50 $4.17 $5.83 $7.50 $9.16 $10.83 $12.50 VOTE TUESDAY, NOVEMBER 8, 2016 Polls open from 7am-8pm WANT MORE INFORMATION? Informational Meetings: High School Library October 12, 2016 - 7pm October 19, 2016 - 7pm Phone: (920) 565-4454 Email: [email protected] Like us on Facebook: HG Auditorium Referendum Citizens’ Advisory Committee AUDITORIUM COMMITTEE MEMBERS Vicki Wagner•Zach Holzer•Angie Houston•Tim Bartz Dave Schmid•Mark Weber•Lynn Berg•Wendy Varish Aaron & Jennifer Sloma•Janina Siemers•Kari Bramstedt Lael Bagnall•Dannielle Arneson•Lonna Near Steve Gerber•Marlo Hoewisch•Chris Thieleke HOW WOULD CONCERTS BE STRUCTURED KNOWING THAT 400-450 SEATS WILL NOT ACCOMMODATE SOME EVENTS? When we have events that require more seating than can be accommodated for, we would have multiple performances. The size of the auditorium fits the needs of our three buildings. Holding multiple performances would allow our performances to “play to a full house”. Additionally, the size helps us with lower royalty fees and performance costs. Graduation would continue to be held in the gym, as it is for other surrounding districts, to avoid limiting attendance at this important event. HOW WOULD AN AUDITORIUM BENEFIT ALL STUDENTS? An auditorium would provide opportunities for many departments in our district with authentic experiences. For example: Set construction, sound and lighting, business marketing/management, graphic design (posters/advertising), and public speaking. WHEN WOULD THESE PROJECTS BE COMPLETED? The projects would be completed over a three-year period (2017-2019) with construction of an auditorium beginning as soon as March 2017 with completion 8-9 months after that date.
© Copyright 2026 Paperzz