Graphical Trend Analysis (High Cycles)

Aqualline Water Treatment
T
P
Products
In
nc.
710 Northeeast Drive, Suite
S
10
Davidsson, NC 280036
Phon
ne 704-895-55500 - Fax 704-895-550
7
1
Prrojected
d Cooling
g Towerr Water Savings
S
s Analys
sis for:
800 To
on Syste
em
E
Charlottte, NC 28202
Ann
nual Estimated Bleed W
Water in Gallons 400,000
Estimaated Yearly Bleed ‐6 Cycles
300,000
Estimaated Yearly Bleed ‐ 12 Cycles
200,000
M
100,000
0
Annual Estim
mated Ble
eed Watter Cost
SA
Gallons
500,000
PL
600,000
$6,000
$5,000
$4,000
$3,000
Water Co
ost ‐ 6 Cycles
Water Co
ost ‐ 12 Cycles
$2,000
$1,000
$0
1
Aqualline Water Treatment
T
P
Products
In
nc.
710 Northeeast Drive, Suite
S
10
Davidsson, NC 280036
Phon
ne 704-895-55500 - Fax 704-895-550
7
1
Annual Projected W
Water Co
ost Savings vs. High Per
H
rformancce Chem
mistry Co
ost
E
$3,5
500
$3,0
000
$2,5
500
$1,5
500
$1,0
000
$5
500
Hich
h Performancee Chemistry Costt
M
$0
Watter Cost Savinggs with High Perfformance Chem
mistry
PL
$2,0
000
An
nnual Pro
ojected Cost Reduction to Own
ner
$1,0
000
$9
900
SA
$8
800
$7
700
$6
600
$5
500
$876
$4
400
Pro
ogram Cost Red
duction to Ow
wner
$3
300
$2
200
$1
100
$0
Analysis based
d on:
>Yearly cooling tower makeu
up of 3,896 K Gallons
G
per yea
ar
>Commercial cost
c
of water in
n Mecklenburg County:
•
Flat usage
u
charge of
o $2.04 per Cccf of metered water
w
usage
•
Administrative charg
ge for sewer $..06 per day perr sewer service
e
•
Sewe
er usage charge
e of $4.0 per Ccf
C of metered water
w
usage
>Aqualine’s prrojected water management program
p
due to
o changes in ch
hemistry
2