ARQ Consulting Engineers Dam Engineering ARQ CONSULTING ENGINEERS (PTY) LTD PO Box 76379 LYNNWOOD RIDGE 0040 ARQ Dams Profile ARQ Consulting Engineers (PTY) Ltd Dams Experience MILESTONE INTERNATIONAL RCC PROJECT AWARD ARQ’s Changuinola 1 Dam in Panama has been awarded “Milestone International RCC Project”, an award that is supported by ICOLD and recognises the dam as being one of the 15 to date to have contributed most significantly to the development of RCC technology. As the first RCC arch dam outside South Africa and China, the design of Changuinola 1 Dam was based on ARQ’s research that recognises the different stress-relaxation creep behaviour of different RCC types. DAMS EXPERIENCE Changuinola 1 Dam (Panama - 105 m arch, June 2011) ARQ (PTY) Ltd has been active in dam engineering since the company was first established in 1993 and this field now represents one of the firms’s primary areas of activity. ARQ has been involved in over 80 projects involving dams, hydropower and river engineering in 26 countries; with 36 new dams completed, or currently under construction (the highest being 273 m), 13 completed projects involving major rehabilitation or raising, 24 projects at pre-feasibility and feasibility level (highest dam of 281 m) and 14 dam safety / asset evaluation studies. ARQ has contributed staff as specialists on international projects involving design precedents and as members of expert panels. Ayvali Dam (Turkey - 178 m, March 2015) Completed dam types include RCC, rubble masonry concrete, concrete, CFRD and earthfill. Wadi Dayqah Dam (Oman – 75 m, June 2010) Roller Compacted Concrete (RCC) and arch dams represent the key areas of specialisation for ARQ and the majority of the company’s large dams activities are focussed on RCC. In RCC dams, ARQ has provided services including planning, design, thermal analysis, structural and dynamic analysis, specification preparation, construction advice and assistance, construction method development, construction supervision, mix design development and safety inspections. Under construction & completed RCC dams in which ARQ has had a primary involvement include: Dam Country Koroglu Kotanli Ayvali Changuinola 1 Turkey Turkey Turkey Panama Height (m) 105 85 178 105 RCC Volume (m3) 660 000 235 000 1 660 000 895 000 Dam Wadi Dayqah Çine Bramhoek Umti Country Oman Turkey RSA Oman Height (m) 75 136.5 38 23 RCC Volume (m3) 550 000 1 650 000 90 000 35 000 2 In addition, ARQ provided expertise on the External Review Panel for the De Hoop (85 m in height + 1.125 million m3 RCC) and Spring Grove dams (42 m & 90 000 m3 RCC) in South Africa and for the Owner’s Engineer on Trung Son (84 m & 750 000 m3) in Vietnam. The total quantity of RCC placed in which ARQ and its personnel has had a direct involvement exceeds 5 million m3. Furthermore, ARQ has experience in a range of RCC types dam and construction technologies, from Hardfill to the current state of the art super-retarded, high workability RCC. The Changuinola 1 Dam, completed in 2011 in Panama, was the first RCC arch/gravity dam outside China and South Africa. On the Changuinola 1 230 MW hydropower project, ARQ was the EPC contractor’s designer for the dam. ARQ was also responsible for the preparation of the South African RCC specification and has been acknowledged by the SA Department of Water Affairs as “.. the recognized experts in the field of Roller Compacted Concrete (RCC) dams in the private sector in South Africa. Seamless GERCC RCC Joint (Wadi Dayqah) Çine Dam (Turkey – 136. 5 m, Feb 2012) ARQ has significant implementation experience in various of the recent technological developments in RCC construction. The company has also extensive experience in specialist areas of RCC design, such as thermal analysis, earthquake design analysis and RCC mix design. The RCC at Wadi Dayqah Dam in Oman very successfully used crushed limestone to augment the sand and improve particle mobility and milled limestone as a paste replacement filler. Trung Son, Vietnam September 2015 Kotanli, Turkey September 2015 2 Çine Dam RCC 3 Other significant RCC & CVC Dam Projects of interest are listed below: Dam Height RCC/CVC Volume Yusufeli, Turkey (Double curvature CVC arch) Ratle, India Stieglers Gorge, Tanzania (Arch) Nam Theun 1, Laos (Arch/gravity Wolwedans (Arch/gravity) Basha Diamer, Pakistan Sounda, Rep. Congo (Arch) Baynes, Nambia/Angola (Arch/gravity) Jana Mielietuin (Arch) (m) (m3) 273 2,9 million (CVC) 130 1.1 million 133 1,25 million 180 2.4 million 70 220 000 281 10 million 220 2.8 million 100 660 000 132 700 000 186 2.9 million On Yusufeli Dam, ARQ is the arch dam specialist and the arch dam structural designers for the EPC contractor. The project is currently under construction. Status Under construction Under construction Feasibility EPC design Completed 1990 Feasibility Tender design Feasibility Feasibility Feasibility Specialist-level analyses completed for major RCC dams include a full time-history dynamic seismic analysis for Changuinola 1 Dam (101 m – pga = 0.4g) and thermal studies for Çine Dam (136.5 m). Yusufeli Dam Hydraulic Model Time History Dynamic Analyses for Changuinola 1 Dam Thermal Study for Çine RCC Dam FE Analysis: Changuinola 1 RCC Arch/Gravity Dam 3 Çine Dam, Turkey Thermal Study for De-Hoop RCC Dam 4 ARQ has unique experience in RCC arch dam design and construction. Changuinola 1 Dam Köroğlu Dam Kotanli Dam Finite Element modelling for Stieglers Gorge Dam FE model & modelling for Nam Theun 1 Dam FE modelling for Changuinola 1 Dam 4 5 Whilst RCC dams are ARQ’s particular specialization, the company has been involved in the design, construction supervision and safety evaluation of a number of embankment dams, including several earthfill and rockfill dams. The following table list ARQ’s primary involvement in dam engineering: Scheme/ Dam Project Value Dam Height/ Type Yusufeli Dam, Turkey TL 900 million Ratle Dam, India US$ 1,4 billion Kotanli Dam, Turkey US$ 75 million Wadi Umti, Oman Koroglu HEPP Neckartal Dam, Namibia Trung Son Dam & HEPP, Vietnam Changuinola 1 Dam, Panama Çine Dam, Turkey Wadi Dayqah Dam, Oman Bramhoek Dam & US$ 10.8 million US$ 115 million US$ 170 million US$ 700 million US$ 450 million US$ 1.1 billion US$ 110 million ARQ Involvement No. of Staff Months 273 m CVC doublecurvature arch Arch Dam specialists/designers for EPC contractor in design and construction. Dam design & major construction plant specification. 32 to date - ongoing 23 m Hardfill Advisors and technical specialists to contractor for tender and construction 133 m RCC gravity 85 m RCC Arch/Gravity 100 m Arch/Gravity RCC dam 80 m RCC Gravity 84 m RCC Gravity 105 m RCC Arch 136.5 m RCC Gravity 75 m RCC Bedford Dam R 850 million 38 m RCC & DWAF Group 1 dams rehabilitation R 400 million 15 – 30 m Earthfill – 9 dams Stiegler’s Gorge Dam & HEPP Ayvali Dam, Turkey De Hoop Dam Berg River Dam Nam Theun 1 Dam (& HEPP), Laos US$ 1.8 billion US$ 250 million R 2.5 billion R 917,3 million US$ 600 million 49 m CFRD 130 m RCC Arch 180 m RCC Arch 85 m RCC Gravity 70 m CFRD 177 m RCC Arch Dam design team leaders for EPC contractor in design & construction. RCC dam design & RCC specialists for design & construction. RCC dam design & RCC specialists for design & construction RCC specialists Owner’s Engineer RCC Specialist. Dam designers. RCC dam design, RCC specialists for design & construction. Thermal analyses, etc Dam structural design & RCC specialists for design & construction. 80 to date - ongoing 4 40 45 3 to date ongoing 2.5 to date - ongoing 255 25 4 Team leaders for dam design as part of a large project team for Ingula Pump Storage Scheme. APP for supervision. 82 Chief engineers for design & construction supervision of various dam betterments. 160 Engineering feasibility study & design. 20 Feasibility design, FE specialist analyses and RCC specialists for design & construction. 14 to date - ongoing Member of external review panel for design & construction. 6 Member of external review panel for design & construction. Basic & EPC design of RCC dam. 5 16 15 6 Scheme/ Dam Project Value Dam Height ARQ Involvement Mukurumudzi Dam US$ 21 million 23 m high Earthfill dam Kembe HEPP, C.A.R. US$ 340 million 30 m RCC/ Design tasks: detailed design, drawings, tender documentation including specifications. Specialist Assistance on construction supervision. 14 US$ 1.4 million 243 m RCC Gravity 130 m RCC Arch RCC mix assistance 0.5 220 m RCC Arch Feasibility design. 8 Gibe III, Ethiopia Sounda HEPP, Republic of Congo Epupa HEPP, Namibia Basha Diamer, Pakistan Thukela Water Project Midmar Dam Raising Lucilia Poort Dam, Zimbabwe Karacasu Dam, Turkey Mndwaka Dam Arnaud Dam, Mauritius Port St Johns Dam Biri Dam, Zimbabwe Aloe Cove Dam Bellair Dam Hoggsback Dam Welgevonden Dam Star Dam Keta Dam Kamusu I Dam, Malawi US$ 2 billion US$ 500 million US$ 10 billion R 1.5 billion R 45 million R8 million US$ 120 million R 52 million US$ 10 million R 22 million US$ 30 million R8 million R 11 million R 580 000 R 800 000 R 0.5 million R 1.1 million US$ 7.8 million Earthfill 218 m RCC Gravity 185 m RCC & 98 m RCC 32 m Conc/ Earthfill 42 m Masonry Arch 75 m Gravel Fill 32 m Masonry 16 m Earthfill 23 m Masonry Arch 44 m Earthfill 23 m Masonry 21 m Masonry 12 m Masonry 17 m Masonry 11 m Masonry 10 m Earthfill 26 m Earthfill Feasibility design. Pre-feasibility design. Structural specialists for feasibility design. No. of Staff Months 24 16 4 Team leaders for dams & preliminary design for feasibility study. 60 External reviewer for dam design & construction supervision. 2 Conceptual, detailed design & supervision assistance for 3.5m raising. Feasibility design of dam embankment. 30 3 Detailed design & supervision assistance 24 Detailed design & supervision assistance 10 Design & construction supervision. 15 Dam design. 3 Detailed design & supervision assistance Tender design & documentation for earthfill dam. Design, specifications & supervision assistance. Dam design & supervision assistance. Dam design & supervision assistance. Dam design & construction supervision. Design & supervision assistance. 6 8 8 3 3 2 4 8 7 Scheme/ Dam Project Value Dam Height ARQ Involvement Eikenhof Dam raising R2 million 47 m Earthfill Design & construction supervision assistance. 7 Bakubung Dam R 0.7 million 14.5 m Masonry Dam design & construction supervision. 6 Genadendal Dam Mount Fletcher Manantali Dam, Mali Maqalika Dam Wolwedans Dam Sterkspruit Dam R 0.6 million R8 million US$ 250 million N/A N/A R6 million 9 m Earthfill 12 m Masonry 66 m Rockfill 26 m Earthfill 70 m RCC Arch 27 m Concrete Dam design & construction supervision. Dam design. Safety and asset valuation of dam & hydropower scheme. 3 1 2 Safety evaluation for World Bank. 1.5 Assistance as APP for construction supervision phase. 1 Assistance with Safety Inspection/ evaluation. Yusufeli Dam Finite Element Model Yusufeli Dam Valley, Turkey Umti Dam, Oman No. of Staff Months 7 2 8 Molepo Dam: September 2010 Bospoort Dam: October 2009 Bospoort Dam: January 2010 Wadi Dayqah Dam: June 2009 Bramhoek Dam: May 2010 & March 2011 8 9 Bedford Dam: May 2010 Berg River Dam: October 2007 Çine Dam: June 2011 Bramhoek Dam: July 2011 9
© Copyright 2025 Paperzz